Consortium set-up Sample Clauses

Consortium set-up. Project consortium consists of five HEIs from Programme Countries (PC), eight HEIs from WB countries (WBC) and three Associated partners (AP). 1. PC HEI partners are: UNIVERZA V MARIBORU - UM (Slovenia), POLYTECHNEIO KRITIS - TUC (Greece), OBUDAI EGYETEM - OE (Hungary), POLITECHNIKA LUBELSKA – LUT (Poland) and UNIVERZITET U NISU – UNI (Serbia). 2. ▇▇ ▇▇▇ partners are: UNIVERSITY OF MITROVICA – UPKM (Kosovo*) Coordinator of the project, UNIVERZITET U SARAJEVU – UNSA (Bosnia and Herzegovina), UNIVERZITET U ISTOCNOM SARAJEVU – UES (Bosnia and Herzegovina), JAVNA USTANOVA UNIVERZITET CRNE ▇▇▇▇ PODGORICA – UOM (Montenegro), UNIVERZITET ADRIATIK BAR – AUB (Montenegro), UNIVERSITETI POLITEKNIK I TIRANES – UPT (Albania), UNIVERSITETI POLIS SHPK – UPOLIS (Albania), INTERNATIONAL BUSINESS COLLEGE MITROVICA – IBCM (Kosovo*) 3. The associated partners are: Agencija za Bezbjednost Saobracaja Republike Srpske – TSARS (Bosnia and Herzegovina), NAFTAGAS-NAFTNI SERVISI DOO NOVI SAD – (Serbia), Agency of Traffic safety – ABS (Serbia). In general: PC partners will provide academic expertise, transfer of knowledge, expertise for implementation of the Bologna system based on ECTS and mobility, monitoring and peer review. The roles of PC will be more significant in the development phase of the project activities due to their experience and skills in education, on one hand, and project experiences on the other hand. ▇▇ ▇▇▇▇ will improve the level of student competences and skills through modernization/development of Undergrad/Master studies curricula, increase the level of teaching staff expert and language skills, increase awareness of public sector on risks related to TDG and improve skills of TDG professionals through trainings devoted to them. Specifically, the WP1 “Work Package 1: Project management will be led by UPKM, the WP2 Introduction with key issues for TDG” by UM, the WP3 Development of TDG Curricula and Laboratories” by OE, the WP4 Development of trainings for TDG professionals by the LUT, the WP5 Implementation TDG Curricula and Trainings by AUB, the WP6 Quality Assurance and Monitoring by UNI, the WP7 Dissemination and Exploitation by UPKM. UPKM has two remote units in so-called Serbian enclaves, one located in Strpce municipality and another in Gnjilane municipality. In both units, students attend study program Transport and Traffic Engineering. Classes in these units are organized in a hybrid way, through live classes and online sessions. Teaching staff is tran...
Consortium set-up. Consortium cooperation and division of roles (if applicable)

Related to Consortium set-up

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If WCS chooses to subtend a Verizon access Tandem, WCS’s NPA/NXX must be assigned by WCS to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 WCS shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from WCS’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office WCS utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow WCS’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Interconnection Agreement Seller shall comply with the terms and conditions of the Interconnection Agreement.

  • Cross Connection For a collocation arrangement, the facilities between the collocating Party’s equipment and the equipment or facilities of the housing Party (such as the housing Party’s digital signal cross connect, Main Distribution Frame, or other suitable frame or panel).

  • CONTRACTOR NAME CHANGE An amendment is required to change the Contractor's name as listed on this Agreement. Upon receipt of legal documentation of the name change the State will process the amendment. Payment of invoices presented with a new name cannot be paid prior to approval of said amendment.