Constraints on how the Contractor. Provides the Works All works must be undertaken in accordance with the drawings and documents provided. The site is not available for occupation by the Contractor until 30 April 2020. All ‘works must be complete by 30 September 2020, preferably earlier. The flow regime during the summer months on the St Neot River is expected to be high due to water releases from Colliford Reservoir. Summer flows in the St Neot River are usually high in summer with low flows only available in Spring and Autumn. All ‘in river’ work areas must be suitably bunded to form secure, fully enclosed, dry working area. Access to the Craigshill Wood site is via a private forestry track; all access to and from the site is to be in close liaison with WRT. The appointed contractor has to provide a safe method of work for entering the site and secure suitable working areas. The site is, as far as practical, to be left in an ‘as found’ condition. 10 Contract Data Works Information