Construction Documents Coordination Documents and Record Documents Clause Samples

Construction Documents Coordination Documents and Record Documents 

Related to Construction Documents Coordination Documents and Record Documents

  • Construction Documents The architectural and engineering documents setting forth the design for the Project prepared by the Design Professional. Construction Documents include, but are not limited to, the Specifications, the Drawings, the Supplementary Conditions, the General Conditions, and all Addenda.

  • Construction Documents Phase Bidding or Negotiation Phase:

  • Formation Documents With respect to the Issuing Entity, the Certificate of Trust and the Trust Agreement, (ii) with respect to the Grantor Trust, the Grantor Trust Certificate of Trust and the Grantor Trust Agreement, and (iii) with respect to the Depositor, the certificate of formation of the Depositor filed in Delaware, dated as of January 4, 2019 and the amended and restated limited liability company agreement of the Depositor, dated as of March 27, 2019, made by the Sponsor, as member.

  • Acquisition Documents (a) Borrowers and Guarantors have delivered, or caused to be delivered, to Agent, true, correct and complete copies of the Acquisition Documents. (b) The Acquisition Documents set forth the entire agreement and understanding of the parties thereto relating to the subject matter thereof, and there are no other agreements, arrangements or understandings, written or oral, relating to the matters covered thereby. (c) None of the Acquisition Documents have been amended or otherwise modified without the prior written consent of Agent. (d) The execution, delivery and performance of the Acquisition Documents have been duly authorized by all necessary action on the part of Parent and each of its Subsidiaries that is a party thereto and to the best of the knowledge of Borrowers and Guarantors, each other party thereto. Each of the Acquisition Documents is the legal, valid and binding obligation of the parties thereto, enforceable against such party in accordance with its terms, except as enforceability may be limited by applicable bankruptcy, insolvency, reorganization, moratorium, liquidation or other similar laws affecting creditors' rights generally. All actions taken by Parent and its Subsidiaries pursuant or in connection with the purchase of the TUG Acquisition Assets and the Capital Stock of TUG NY, Clare, FMI Blocker, FMI Holdco and Sea Master Hong Kong have been taken in compliance with the terms of the Acquisition Documents. (e) No party to any of the Acquisition Documents is in default with respect to any of its obligations under such Acquisition Documents in any material respect and all representations and warranties made by the parties thereto in the Acquisition Documents and in the certificates delivered in connection therewith are true and correct as of the date hereof, except as waived in writing with the approval of Agent. The reports, financial statements, certificates and other written information with respect to the purchase of the TUG Acquisition Assets and the Capital Stock of TUG NY, Clare, FMI Blocker, FMI Holdco and Sea Master Hong Kong in connection with the Acquisition Documents, furnished to Agent by Borrowers, taken as a whole (as modified or supplemented by other written information so furnished), do not contain any material misstatement of fact or omit to state any material fact necessary to make the statements therein, in the light of the circumstances under which it was made, not misleading.

  • Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall allow the Construction Manager to utilize the information uploaded into Owner’s PMIS to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.4.2 As a part of Construction Documents Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Model coordination shall occur at all reviews during the Construction Documents Phase as identified in the BIM Execution Plan. Architect/Engineer shall utilize Owner’s PMIS to accomplish model coordination and collaborate with Construction Manager in the resolution of critical clashes identified by the Construction Manager. Architect/Engineer shall demonstrate and provide written assurance to Owner that conflicts/collisions between models have been resolved. 1.4.3 The Architect/Engineer shall consult with the Owner and Construction Manager on matters such as construction phasing and scheduling, bid or proposal alternates, liquidated damages, the construction contract time period, and other construction issues appropriate for the Project. The Architect/Engineer shall assist the Owner and Construction Manager in the preparation of the necessary bidding information, bidding forms, RFP information, and RFP forms, and the Conditions of the Contract. 1.4.4 The Architect/Engineer shall assist the Owner in connection with the Owner’s responsibility and procedures for obtaining approval of all building and accessibility authorities having jurisdiction over the Project. 1.4.5 The Architect/Engineer shall provide coordination and inclusion of sequence of operations for all operable systems in the facility as defined by Owner during Design Development. 1.4.6 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.4.7 The Architect/Engineer shall participate in a final review of the Construction Documents and model(s) with the Owner and Construction Manager at the Project location or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Construction Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments. 1.4.8 The Architect/Engineer shall provide a list of all manufacturer warranties and submittals that are required by their specification. 1.4.9 Before proceeding into the Bidding and Proposal Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Construction Documents and approval of the Final Amount Available for the Construction Contract as approved by the Board of Regents.