CONSTRUCTION MANAGEMENT AND PROGRAM MANAGEMENT SERVICES Clause Samples

CONSTRUCTION MANAGEMENT AND PROGRAM MANAGEMENT SERVICES. SCOPE OF WORK WFI shall perform the following services (all of which shall be hereinafter referred to collectively as the "Construction Management Services") for TeleCorp, for each site chosen within each of the Search Rings assigned via Schedule A, (a "Schedule A Site") and for other sites for which WFI has not ---------- provided Site Acquisition Services. All sites for which WFI will perform Construction Management Services shall hereinafter be referred to as the "CMS Sites." The Construction Management Services to be performed by WFI are as follows: 1. Sites for which WFI provided Site Acquisition Services. For all ------------------------------------------------------- approved and accepted sites for which WFI's Site Acquisition Services have been performed, WFI shall, as required by TeleCorp, continue its work on such Sites by acting as the construction manager in the capacity of general contractor to TeleCorp. 2. Sites for which WFI did not provide Site Acquisition Services. For -------------------------------------------------------------- all Sites which are not Sites for which WFI has performed Site Acquisition Services, and provided that such sites are presented to WFI for Construction Management Services with all of the work completed which WFI would have performed had it been engaged by TeleCorp to perform Site Acquisition Services, then WFI shall act as the construction manager in the capacity of general contractor to TeleCorp for such sites. TeleCorp covenants that it will make available the records and files of all previously performed site acquisition work to WFI as WFI may reasonably request. 3. The Minimum Construction Management Services which WFI shall perform include: a. Awarding, via a bid process resulting in not less than [***] per contract, contracts for the performance of soil tests, geotechnical, plat and topographical surveys, investigation of flood and water drainage issues, tower construction, foundations, tenant improvement, grounds and landscaping, and thereafter negotiating the terms of all such contracts, all of which shall be entered into by WFI and the other contract party directly; b. Upon completion of the foregoing negotiations, submitting these contracts to TeleCorp in writing, which shall accept or reject same, in writing (acceptance may be by execution of documents presented, if appropriate, within [***] business days of submission to TeleCorp by WFI. c. Ordering and permitting access and delivery for the installa...

Related to CONSTRUCTION MANAGEMENT AND PROGRAM MANAGEMENT SERVICES

  • Construction Management Services a. A-E may be required to review and recommend approval of submittals, shop drawings, Request for Information (RFI) and/or calculations for temporary structures such as trench shoring, false work and other temporary structural forms. b. A-E may be required to review and advise the County Representative on the overall project schedule, including staging and completion dates, duration, milestones, and interfaces. Immediately notify Representative if the proposed work schedule does not conform to the contract documents, including the plans, specifications, and permits or that may require special inspection or testing, or work stoppage. c. Review on a monthly basis the project schedule and/or Critical Path Method (CPM) schedule submitted by the Construction Contractor. Make recommendations concerning the Construction Contractor’s adherence thereto. Recommend possible solutions to scheduling problems so as to complete the project on time, within budget, and in accordance with the contract drawings and specifications. d. Review scope of work and identify potential contract change orders. Prepare independent cost estimates for any changes resulting from design revisions or change in field conditions. Prepare and recommend for approval all contract change orders. e. Evaluate the merit of any potential claims or requests for equitable adjustment submitted by the Construction Contractor. Prepare analysis of potential claims include recommendations regarding settlement of the claims. f. Assist County staff in project related issues with other Agencies, or departments, engineering and material testing support firms, CEQA consultants, utilities agencies, etc. g. Assist in community outreach meetings and media relations h. Review for acceptance/approval of Storm Water Pollution Prevention Plan (SWPPP) in accordance with the general Permit of Discharges of Storm Water Associated with Construction Activity (Construction General Permit, including dewatering/diversion plans per the State’s DeMinimus Permit).

  • Project Management Services Contractor shall provide business analysis and project management services necessary to ensure technical projects successfully meet the objectives for which they were undertaken. Following are characteristics of this Service:

  • Construction Management Landlord or its Affiliate or agent shall supervise the Work, make disbursements required to be made to the contractor, and act as a liaison between the contractor and Tenant and coordinate the relationship between the Work, the Building and the Building’s Systems. In consideration for Landlord’s construction supervision services, Tenant shall pay to Landlord a construction supervision fee equal to three percent (3%) of Tenant’s Costs specified in Section 7.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Program Management 1.1.01 Implement and operate an Immunization Program as a Responsible Entity 1.1.02 Identify at least one individual to act as the program contact in the following areas: 1. Immunization Program Manager;