Common use of Construction Manager's Representative Clause in Contracts

Construction Manager's Representative. Construction Manager designates the individual listed below as its Construction Manager's Representative to provide direct interface with Owner with respect to Construction Manager's responsibilities: ▇▇ ▇▇▇▇▇▇▇▇▇▇, Construction Manager's Project Manager. May 07, 2021 ▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇ Project Manager Brevard County Public Schools Facilities Services ▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇▇ Way ▇▇▇▇▇, FL 32940 RE: ▇.▇. ▇▇▇▇▇▇▇ Middle School Roof Replacement and Campus Wide Painting of Mansard Roofing Dear ▇▇. ▇▇▇▇▇▇, We are pleased to submit our GMP proposal for the Roof Replacement and Campus Wide Painting of Mansard Roofing at ▇▇▇▇▇▇ ▇. ▇▇▇▇▇▇▇ Middle School. Our GMP value of $491,160.93 is based on the following exhibits and Milestone Schedule Dates: o Exhibit C-1 – Construction Documents (04/29/2021) o Exhibit C-2 – Clarifications (04/29/2021) o Exhibit D-1 – H. J. High General Conditions (04/29/2021) o Exhibit D-2 – H. J. High General Requirements (04/29/2021) o Exhibit E – Schedule of Values o Milestone Schedule:  Board Approval – 05/25/2021  Notice to Proceed - 05/26/2020  Procurement & Field Investigation – 05/26/2021 to 07/15/2021  Full Mobilization – 06/07/2021  Substantial Completion – 07/31/2021  Final Completion – 09/10/2021 H. J. High’s designated Project Manager for this project will be ▇▇ ▇▇▇▇▇▇▇▇▇▇. ▇▇▇▇▇▇ High will serve as the Project Executive. Please let me know if you have any questions or would like any further clarification. We are excited to get started on this project and look forward to working with you again. Sincerely, ▇▇▇▇▇▇ High H. J. High Construction EXHIBIT C-1 Rev. 4-29-21 BREVARD PUBLIC SCHOOLS ▇▇▇▇▇▇ ▇. ▇▇▇▇▇▇▇ MIDDLE SCHOOL ROOF REPLACEMENT AND CAMPUS WIDE PAINTING DOCUMENT TITLE DATE ▇▇▇ ▇▇▇ ▇▇▇ ▇▇▇ B03 Cover Sheet, Vicinity Map, and Drawing Index 4/16/2021 Overall Roof Plan, Roof Schedule, and Code Data 4/16/2021 Fastener Schedule, Abbreviations, and General 4/16/2021 Roofing Details 4/16/2021 Roofing Details 4/16/2021 00 01 10 Project Manual Index 4/16/2021 01 11 00 Summary of Work 4/16/2021 01 22 00 Unit Prices 4/16/2021 01 26 00 Contract Modification Procedures/Change Orders 4/16/2021 01 26 13 Request for Information 4/16/2021 01 29 00 Payment Application and Procedures 4/16/2021 01 33 00 Administrative Requirements 4/16/2021 01 33 00 Submittal Procedures 4/16/2021 01 40 00 Quality Requirements/Refernces 4/16/2021 01 50 00 Temproary Facilities and Controls 4/16/2021 01 60 00 Product Requirements 4/16/2021 02 25 29 Existing Condition Assessment 4/16/2021 02 41 16 Selective Demolition 4/16/2021 06 10 53 Miscellaneous Rough Carpentry 4/16/2021 07 51 00 Preparation for Reroofing 4/16/2021 07 52 16 Modified Bitumen Roofing - Torched Application 4/16/2021 07 62 00 Sheet Metal Flashing and Trim 4/16/2021 07 90 00 Joint Protection 4/16/2021 09 96 56 Acrylic Polyurethane Industrial Enamel 4/16/2021 23 00 00 Basic Mechanical Equipment Requirements 4/16/2021 26 05 00 Basic Electrical Requirements 4/16/2021

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Construction Manager's Representative. Construction Manager designates the individual listed below as its Construction Manager's Representative to provide direct interface with Owner with respect to Construction Manager's responsibilities: ▇▇ ▇▇▇▇▇▇▇▇▇▇, Construction Manager's Project Manager. May 07, 2021 ▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇, Construction Manager's, Project Manager Manager. Exhibit C- Project Assignment Page 3 of 4 Exhibit C-1 – List of Contract Documents Page 1 of 1 School Board of Brevard County Public Schools Facilities Services ▇▇▇▇ ▇▇▇▇▇ 2725 Judge ▇▇▇▇ ▇▇▇▇▇▇▇▇ Way HCI Project 2204640200 PO# BPS PC Bayside Athletic Track Improvements Viera , FL 32940-6699 Attn: ▇▇▇▇ ▇▇▇▇▇▇ Subject: CM GMP Proposal for Bayside High School Athletic Track Improvements Dear ▇▇▇▇, FL 32940 RE: At your request we are providing our proposal for Construction Management Services for the subject project. All work will be subject to terms and conditions as stipulated in the Continuing Contract for Construction Management Services between Heard Construction Inc. and the School Board of Brevard County and ▇▇▇▇ Engineering Drawings dated l/12/22 & ▇▇▇▇ Sports Construction Proposal outlining the following scope of work: 1) Mobilization and layout. 2) Provide GPR for utility locations in our work area where proposed field events and track are to be constructed. 3) Remove and store chain-link mesh for access as necessary. Rehang upon completion. 4) Remove and replace existing sidewalk at three locations that tie into the track per plans. 5) Full-depth mill (approximately 6”) of existing asphalt track; . ▇▇▇▇▇▇▇ Middle School Roof Replacement to be remain in place. 6) Form, pour, and Campus Wide Painting finish 6” x 18” interior concrete curb, complete with one (1) #4 stick of Mansard Roofing Dear rebar. 7) Form, pour, and finish 6” x 18” exterior concrete, complete with one (1) #4 stick of rebar. 8) Top-dress existing ▇. ▇▇▇▇▇▇, We are pleased to submit our GMP proposal for the Roof Replacement and Campus Wide Painting of Mansard Roofing at ▇▇▇▇▇▇ ▇. ▇▇▇▇▇▇▇ Middle School. Our GMP value of $491,160.93 is based on the following exhibits and Milestone Schedule Dates: o Exhibit C-1 – Construction Documents (04/29/2021with Limerock base, as necessary, to achieve desired elevations. 9) o Exhibit C-2 – Clarifications (04/29/2021) o Exhibit D-1 – H. J. High General Conditions (04/29/2021) o Exhibit D-2 – H. J. High General Requirements (04/29/2021) o Exhibit E – Schedule of Values o Milestone Schedule:  Board Approval – 05/25/2021  Notice Apply prime coat to Proceed - 05/26/2020  Procurement & Field Investigation – 05/26/2021 to 07/15/2021  Full Mobilization – 06/07/2021  Substantial Completion – 07/31/2021  Final Completion – 09/10/2021 H. J. High’s designated Project Manager for this project will be ▇▇ ▇▇▇▇▇▇▇▇▇▇. . 10) Pave 1.5” SP 9.5 Virgin asphalt mix for running track at approximate 1% cross-slope. 11) Sod disturbed areas; Bahia outside of field; Tiffway 419 inside of field 12) Furnish and install ▇▇▇▇▇▇ BSS 100 in black or red color with 400m white track striping per NFHS stand Agreed upon Alternates removed from Base Contract to be included at a later date: 1) Remove existing mats from long jump & pole vault runways. Repair any cracks in concrete runways. Remove existing rotted takeoff board. Replace section with 6” thick concrete. Furnish and install track surfacing (same as track) to runways. ADD $17,050.00 2) Furnish and install approximately 108 LF of 6” x 18” concrete curb, complete with one (1) #4 stick of rebar around perimeter of existing sand pit (sand to remain and not top-dressed). ADD $4,950.00 3) Furnish and install long/triple jump take-off boards. ADD $2,250.00 Project Manager 240 hrs 75.25 18,060.00 Project Manager Vehicle 1.5 month(s) 368.00 552.00 Project Manager Phone 1.5 month(s) 60.00 90.00 Project Superintendent 696 hrs 51.71 35,990.16 Project Superintendent Vehicle 4 month(s) 368.00 1,472.00 Project Superintendent Phone 4 month(s) 60.00 240.00 Project Accountant 8 hrs 58.14 465.12 Project Clerk 16 hrs 25.45 407.20 Reproduction & Printing 4 month(s) 50.00 200.00 Project Executive 8 hrs 87.33 698.64 CSI Division 0 - General Conditions Total 58,175.12 CSI Division 1 - General Requirements Dumpster 4 month(s) 500.00 2,000.00 Utility Locates 1 allowance 2,500.00 2,500.00 Testing & Inspection Services 1 allowance 4,500.00 4,500.00 Portable Toilets 4 month(s) 150.00 600.00 CSI Division 1 - General Requirements Total 9,600.00 CSI Division 32 - Exterior Improvements Track & Field Reconstruction 1 ls 669,150.00 669,150.00 Long Jump & Pole Vault Modds 0 ls 0.00 Alternate price before fees is $17,050 Removed from Base contract. 0.00 Sand Pit Mods 0 ls 0.00 Alternate price before fees is $4,950 Removed from Base contract. 0.00 Furnish and install long/triple jump take-off boards. Alternate price before fees is $2,250. Removed from Base contract. 0 ls 0.00 0.00 Professional Liability @ 0.00% 0.00 Heard Construction, Inc. RE: Bayside High will serve as the Project Executive. Please let me know if you have any questions or would like any further clarification. We are excited to get started on this project and look forward to working with you again. Sincerely, ▇▇▇▇▇▇ High H. J. High Construction EXHIBIT C-1 Rev. 4-29-21 BREVARD PUBLIC SCHOOLS ▇▇▇▇School Track ▇▇ ▇. ▇▇▇▇ Road Merritt Island, FL 32953 1) Mobilization and layout of our work. 2) Provide GPR for utility locations in our work area where proposed field events and track are to be constructed. 3) Remove and store chain-link mesh for access as necessary. Rehang upon completion. 4) Remove and replace existing sidewalk at three locations that tie into the track per plans. 5) Full-depth mill (approximately 6”) of existing asphalt track; ▇▇▇▇▇▇▇▇ MIDDLE SCHOOL ROOF REPLACEMENT AND CAMPUS WIDE PAINTING DOCUMENT TITLE DATE to be remain in place. 6) Form, pour, and finish 6” x 18” interior concrete curb, complete with one (1) #4 stick of rebar. 7) Form, pour, and finish 6” x 18” exterior concrete, complete with one (1) #4 stick of rebar. 8) Top-dress existing ▇▇▇▇▇▇▇▇ with Limerock base, as necessary, to achieve desired elevations. 9) Apply prime coat to ▇▇▇▇▇▇▇▇. 10) Pave 1.5” SP 9.5 Virgin asphalt mix for running track at approximate 1% cross-slope. 11) Sod disturbed areas; Bahia outside of field; Tiffway 419 inside of field 12) Furnish and install ▇▇▇▇▇▇ ▇▇▇ ▇▇▇ B03 Cover Sheet, Vicinity Map, and Drawing Index 4/16/2021 Overall Roof Plan, Roof Schedule, and Code Data 4/16/2021 Fastener Schedule, Abbreviations, and General 4/16/2021 Roofing Details 4/16/2021 Roofing Details 4/16/2021 00 01 10 Project Manual Index 4/16/2021 01 11 00 Summary of Work 4/16/2021 01 22 00 Unit Prices 4/16/2021 01 26 00 Contract Modification Procedures/Change Orders 4/16/2021 01 26 13 Request for Information 4/16/2021 01 29 00 Payment Application and Procedures 4/16/2021 01 33 00 Administrative Requirements 4/16/2021 01 33 00 Submittal Procedures 4/16/2021 01 40 00 Quality Requirements/Refernces 4/16/2021 01 50 00 Temproary Facilities and Controls 4/16/2021 01 60 00 Product Requirements 4/16/2021 02 25 29 Existing Condition Assessment 4/16/2021 02 41 16 Selective Demolition 4/16/2021 06 10 53 Miscellaneous Rough Carpentry 4/16/2021 07 51 00 Preparation for Reroofing 4/16/2021 07 52 16 Modified Bitumen Roofing - Torched Application 4/16/2021 07 62 00 Sheet Metal Flashing and Trim 4/16/2021 07 90 00 Joint Protection 4/16/2021 09 96 56 Acrylic Polyurethane Industrial Enamel 4/16/2021 23 00 00 Basic Mechanical Equipment Requirements 4/16/2021 26 05 00 Basic Electrical Requirements 4/16/2021BSS 100 in black or red color with 400m white track striping per NFHS standards. Rubberized Track Surfacing: $285,250.00 Civil Component: $383,900.00

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Construction Manager's Representative. Construction Manager designates the individual listed below as its Construction Manager's Representative to provide direct interface with Owner with respect to Construction Manager's responsibilities: ▇▇▇▇▇▇▇ ▇▇▇▇▇▇, Construction Manager's Project Manager. May 07Exhibit C- Project Assignment Page 3 of 4 Exhibit C-1 – List of Contract Documents Page 1 of 1 October 22, 2021 School Board of Brevard County 2725 Judge ▇▇▇▇ ▇▇▇▇▇▇▇▇ Way HCI Project 2104642800 PO# BPS ▇▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇Project Manager Brevard County Public Schools Facilities Services ▇▇, ▇▇ ▇▇▇▇▇-▇▇▇Attn: ▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇Way ▇▇▇▇▇, FL 32940 RE: ▇.▇. ▇▇▇▇▇▇▇ Middle Subject: Croton Elementary School Roof - Construction Management Proposal for Intercom Replacement and Campus Wide Painting of Mansard Roofing Dear ▇▇. ▇▇▇▇▇▇, We are pleased Heard Construction, Inc. (HCI) has been contacted by the Brevard County School Board to submit our GMP provide a proposal for Construction Management Services on the Roof Replacement above referenced project per the Drawings and Campus Wide Painting specifications prepared by TLC Engineering ASolutions. dated 9/7/2021. All work will be subject to terms and conditions as stipulated in the Continuing Contract for Construction Management Services between Heard Construction Inc. and the School Board of Mansard Roofing at Brevard County. Activities generally covered by the aforementioned drawings and specifications will be covered by the following Scope of Work: 1. Remove & replace the existing intercom system with a new VALCOM System per Plan. 2. All speaker cabling shall be CAT. 6 by MOHAWK with ▇▇▇▇▇▇ Revconnect termination devices per Plan. 3. ▇▇▇▇▇▇▇ Middle School. Our GMP value of $491,160.93 is based on the following exhibits and Milestone Schedule Dates: o Exhibit C-1 – Construction Documents (04/29/2021) o Exhibit C-2 – Clarifications (04/29/2021) o Exhibit D-1 – H. J. High General Conditions (04/29/2021) o Exhibit D-2 – H. J. High General Requirements (04/29/2021) o Exhibit E – Schedule of Values o Milestone Schedule:  Board Approval – 05/25/2021  Notice to Proceed - 05/26/2020  Procurement & Field Investigation – 05/26/2021 to 07/15/2021  Full Mobilization – 06/07/2021  Substantial Completion – 07/31/2021  Final Completion – 09/10/2021 H. J. High’s designated Project Manager for this project All cable will be ▇▇ ▇▇▇▇▇▇▇▇▇▇MOHAWK Min compliant yellow CAT. ▇▇▇▇▇▇ High 6 plenum rated per Plan. 4. All CAT. 6 cable will serve as be tested and results provided to the Project ExecutiveEngineer per Plan. 5. Please let me know if you have any questions or would like any further clarificationAll VALCOM ceiling mounted speakers, wall mounted speaker/clock/test and wall mounted exterior speakers will be provided and installed per Plan. 6. We are excited to get started on this project All wiring and look forward to working with you againconduit penetrations will be provided and installed per Plan. 7. Sincerely, ▇▇▇▇▇▇ High H. J. High Construction EXHIBIT C-1 Rev. 4-29-21 BREVARD PUBLIC SCHOOLS ▇▇▇▇▇▇ ▇Speaker tags and identification will be provided and installed per Plan. 8. ▇▇▇▇▇▇▇ MIDDLE SCHOOL ROOF REPLACEMENT AND CAMPUS WIDE PAINTING DOCUMENT TITLE DATE ▇▇▇ ▇▇▇ ▇▇▇ ▇▇▇ B03 Cover Sheet, Vicinity Map, The existing school PA System will remain operational until the new VALCOM PA System is installed and Drawing Index 4/16/2021 Overall Roof Plan, Roof Schedule, and Code Data 4/16/2021 Fastener Schedule, Abbreviations, and General 4/16/2021 Roofing Details 4/16/2021 Roofing Details 4/16/2021 00 01 10 Project Manual Index 4/16/2021 01 11 00 Summary of Work 4/16/2021 01 22 00 Unit Prices 4/16/2021 01 26 00 Contract Modification Procedures/Change Orders 4/16/2021 01 26 13 Request for Information 4/16/2021 01 29 00 Payment Application and Procedures 4/16/2021 01 33 00 Administrative Requirements 4/16/2021 01 33 00 Submittal Procedures 4/16/2021 01 40 00 Quality Requirements/Refernces 4/16/2021 01 50 00 Temproary Facilities and Controls 4/16/2021 01 60 00 Product Requirements 4/16/2021 02 25 29 Existing Condition Assessment 4/16/2021 02 41 16 Selective Demolition 4/16/2021 06 10 53 Miscellaneous Rough Carpentry 4/16/2021 07 51 00 Preparation for Reroofing 4/16/2021 07 52 16 Modified Bitumen Roofing - Torched Application 4/16/2021 07 62 00 Sheet Metal Flashing and Trim 4/16/2021 07 90 00 Joint Protection 4/16/2021 09 96 56 Acrylic Polyurethane Industrial Enamel 4/16/2021 23 00 00 Basic Mechanical Equipment Requirements 4/16/2021 26 05 00 Basic Electrical Requirements 4/16/2021tested. After BPS acceptance the existing system will be removed.

Appears in 1 contract

Sources: Construction Management Services Agreement