Continue Work Sample Clauses

The "Continue Work" clause requires a contractor or service provider to proceed with their duties under a contract, even if there are disputes or unresolved issues between the parties. In practice, this means that work must not be halted or delayed due to disagreements, such as payment disputes or change order negotiations, unless specifically instructed otherwise by the client or an authorized party. This clause ensures that project progress is maintained and helps prevent costly delays, thereby protecting the interests of both parties by keeping the work on schedule while disputes are resolved separately.
Continue Work. During the dispute process, CONTRACTOR shall continue work pursuant to this Contract as instructed by the CITY.
Continue Work. Nothing in this ARTICLE 16 relieves the Contractor from diligently proceeding with the Work under the Contract, as directed by the CTA.

Related to Continue Work

  • Creative Work The Executive agrees that all creative work and work product, including but not limited to all technology, business management tools, processes, software, patents, trademarks, and copyrights developed by the Executive during the term of this Agreement, regardless of when or where such work or work product was produced, constitutes work made for hire, all rights of which are owned by the Employer. The Executive hereby assigns to the Employer all rights, title, and interest, whether by way of copyrights, trade secret, trademark, patent, or otherwise, in all such work or work product, regardless of whether the same is subject to protection by patent, trademark, or copyright laws.

  • Overtime Work A. Overtime pay is to be paid at the rate of one and one- half (1½) times the basic hourly straight-time rate. B. Overtime shall be paid to employees for work performed only after eight (8) hours on duty in any one (1) service day or forty (40) hours in any one (1) service week. Nothing in this Section shall be construed by the parties or any reviewing authority to deny the payment of overtime to employees for time worked outside of their regularly scheduled work week at the request of the Employer. C. Penalty overtime pay is to be paid at the rate of two

  • THE WORK The Work comprises the completed construction required by the Contract Documents and includes all labor necessary to produce such construction, and all materials and equipment incorporated or to be incorporated in such construction.

  • Outside Work All work necessary to the assembling, installation, erection, operation, maintenance, repair, control, in- spection and supervision of all electrical apparatus, devices, wires, cables, supports, insulators, conduc- tors, ducts and raceways when part of distributing systems outside of buildings, railroads and outside the directly related railroad property and yards. In- stalling and maintaining the catenary and trolley work on railroad property, and bonding of rails. All underground ducts and cables when they are in- stalled by and are part of the system of a distrib- uting company, except in power stations during new construction, including ducts and cables to adjacent switch racks or substations. All outdoor substations and electrical connections up to and including the setting of transformers and the connecting of the secondary buses thereto. Outside work to include renewable electrical energy sources such as solar photovoltaic, geothermal, wind, biomass, wave, etc., and other distributed en- ergy installations such as fuel cells, microturbines, etc.

  • Unsafe Work An employee may exercise their right to refuse to do unsafe work pursuant to Section 3.12 of the Occupational Health and Safety Regulations outlined in Information Appendix B. An employee must not be subject to discriminatory or disciplinary action pursuant to Section 3.13(1) of the Occupational Health and Safety Regulations outlined in Information Appendix B.