Contractor to search cause. 12.5.1 The EIC may instruct the Contractor to examine the cause of any Defect in work or part thereof before the expiry of the Defects Liability Period. 12.5.2 In the event any Defect is attributable to the Contractor, the Contractor shall rectify such Defect within the period specified by the EIC, and shall bear the cost of the examination and rectification of such Defect. 12.5.3 In the event such Defect is not attributable to the Contractor, the EIC shall, after due consultation with the RSCL and the Contractor, determine the costs incurred by the Contractor on such examination and notify the same to the Contractor, with a copy to the RSCL, and the Contractor shall be entitled to payment of such costs by the RSCL’s 12.5.4 Any structural defects, if noticed within the defect liability period of Five years, the same shall be rectified at the cost of the contractor.
Appears in 1 contract
Sources: General Conditions of Contract
Contractor to search cause. 12.5.1 The EIC may instruct the Contractor to examine the cause of any Defect in work or part thereof before the expiry of the Defects Liability Period.
12.5.2 In the event any Defect is attributable to the Contractor, the Contractor shall rectify such Defect within the period specified by the EIC, and shall bear the cost of the examination and rectification of such Defect.
12.5.3 In the event such Defect is not attributable to the Contractor, the EIC shall, after due consultation with the RSCL and the Contractor, determine the costs incurred by the Contractor on such examination and notify the same to the Contractor, with a copy to the RSCL, and the Contractor shall be entitled to payment of such costs by the RSCL’s
12.5.4 Any latent structural defects, if noticed within the defect liability period of Five five years, the same shall be rectified at the cost of the contractor.
Appears in 1 contract
Sources: General Conditions of Contract