Common use of Contractor’s Project Manager and Key Personnel Clause in Contracts

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 128 contracts

Sources: Contract Ma 060 22011634, Webeoc Enterprise Software Maintenance, Contract for Network Electric Vehicle Charging Stations, Service and Maintenance

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 72 contracts

Sources: Parking Access and Revenue Control System Equipment, Maintenance and Repair, Contract for Maintenance and Repair Services, Contract for Maintenance and Repair Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further services under the Contract.

Appears in 18 contracts

Sources: Contract for Oc Automated Biometric Identification System Maintenance Services, Contract Ma 060 20010071, Contract for Online Annual Policy Manual Development Subscription

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 15 contracts

Sources: Contract for Services, Lake Management and Lake Water Maintenance Services, Hvac Maintenance and Repair Services Contract

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 15 contracts

Sources: Contract for Disaster Related Debris Management Services, Proposition 47 Evaluation Services Contract, Non Exclusive Real Estate Tax Roll License Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager Manager, in consultation and agreement with the County, shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager Manager, in consultation and agreement with the Director, shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 15 contracts

Sources: Home and Community Based Services / Senior Nutrition Infrastructure Grant, Legal Assistance Services Agreement, Home and Community Based Services / Senior Nutrition Infrastructure Grant

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 11 contracts

Sources: Contract for Written Translation of Election Materials, Contract for Written Translation of Election Materials, Contract for Written Translation of Election Materials

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 10 contracts

Sources: Contract for Nepa Document Preparation, Grease Interceptor Maintenance & Repair Services Agreement, Maintenance Consultant Services Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 9 contracts

Sources: Employee Benefits Consulting and Actuarial Services Contract, Stormwater Education and Outreach Campaign Services, Agreement for Unleaded Fuel Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager project manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager project manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Managerproject manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the this Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required elects to provide any additional information, reason or rationale in the event it requires request the removal of Contractor’s Contractors Project Manager from providing further services to the County under the this Contract.

Appears in 8 contracts

Sources: Software Maintenance and Database Hosting Services, Victim/Witness Assistance Program Contract, Software Maintenance and Database Hosting Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.Contract.(Note: this provision is optional for commodities and applicable for services)

Appears in 7 contracts

Sources: Telehealth and Digital Mental Health Support Services, Covid 19 Vaccination Services Agreement, Contract for Electric Lift Truck

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which whose consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 6 contracts

Sources: Annual Tree Maintenance and Tree Pest Management Services, Annual Tree Maintenance and Tree Pest Management Services, Annual Tree Maintenance and Tree Pest Management Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project ManagerContract coordinator, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager Contract coordinator shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager Contract coordinator shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s Project ManagerContract coordinator. The County’s Project Manager Contract coordinator shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 4 contracts

Sources: Software Maintenance and Support Agreement, Managed Security Services Agreement, Emergency Contract

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager and key personnel shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. Key personnel are those individuals who report directly to the Contractor’s Project Manager. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 4 contracts

Sources: Inmate Communication Services Contract, Inmate Communication Services Contract, Contract

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services Services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services Services to the County under this Contract. The County’s Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services Services under the Contract.

Appears in 3 contracts

Sources: Subordinate Contract for Unarmed Security Guard Services, Regional Cooperative Agreement, Regional Cooperative Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time linestimelines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 3 contracts

Sources: Regional Cooperative Agreement, Federal Legislative Advocacy Services Contract, Contract for Civic Center Facilities Strategic Plan

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld, unless there is a change in employment status or similar situation that requires replacement. Any replacement Project Manager must have the same or similar skills, training and experience as the original Project Manager. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 3 contracts

Sources: Software Maintenance and Database Hosting Services Agreement, Software and Professional Services Agreement, Software Maintenance and Database Hosting Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have has the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 3 contracts

Sources: Covid 19 Consulting Services Agreement, Covid 19 Consulting Services Agreement, Covid 19 Contact Tracing Services Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager project manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager project manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Managerproject manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the this Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required elects to provide any additional information, reason or rationale in the event it requires request the removal of Contractor’s Project Manager from providing further services to the County under the this Contract.

Appears in 2 contracts

Sources: Written Translation Agreement, Contract for Written Translation of Ballots & Other Election Materials

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project Contract for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have has the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 2 contracts

Sources: Contract for Water Testing Media, Reagent Rental and Test Kits Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which whose consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 2 contracts

Sources: Management & Operation of Multi Facility Parking Complexes, Management & Operation Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further services under the Contract.

Appears in 2 contracts

Sources: Contract for Airport Noise Monitoring Systems Services, Airport Noise Monitoring Systems Services Contract

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the ofthe Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further services under the Contract.

Appears in 2 contracts

Sources: Contract Ma 060 20011652, Contract for Software, Subscriptions, Associated Implementation Services and Support of Inform and Vision Field Based Reporting

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager project manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager project manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Managerproject manager, which whose consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the this Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five fourteen (514) business calendar days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. Said approval shall not be unreasonably withheld. The County is not required to provide any additional information, reason or rationale in the event it The County is not required elects to provide any additional information, reason or rationale in the event it requires request the removal of Contractor’s Contractors Project Manager from providing further services to the County under the this Contract.

Appears in 2 contracts

Sources: Contract for Off Site Data Storage and Retrieval Services, Contract for Off Site Data Storage and Retrieval Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s ofContractor's Project Manager from providing further services under the Contract.

Appears in 2 contracts

Sources: Contract for Coroner Medical Examiner (Cme) Software Maintenance and Support, Contract for Coroner Medical Examiner (Cme) Software Maintenance and Support

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right right, in a reasonable manner, to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 2 contracts

Sources: Contract for Supplies and Maintenance Services, Laboratory Equipment Maintenance and Supplies Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Program Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Program Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project Program manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s Project Program Manager. The County’s Project Program Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 2 contracts

Sources: Administrative Services Agreement, Administrative Services Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which whose consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 2 contracts

Sources: Maintenance System Enhancements and Program Management, Maintenance System Enhancements and Program Management

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the ofthe County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further services under the Contract.

Appears in 2 contracts

Sources: Contract for Dorado Mainframe Hardware and Software Extended Maintenance and Support Services, Contract for Dorado Mainframe Hardware and Software Extended Maintenance and Support Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager and key personnel shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. Key personnel are those individuals who report directly to the Contractor’s Project Manager. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days immediately after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 2 contracts

Sources: Contract Ma 060 22011235, Youth Diversion Counseling Services Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager project manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager project manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Managerproject manager, which whose consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the this Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five fourteen (514) business calendar days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. Said approval shall not be unreasonably withheld. The County is not required to provide any additional information, reason or rationale in the event it The County is not required elects to provide any additional information, reason or rationale in the event it requires request the removal of Contractor’s Contractors Project Manager from providing further services to the County under the Contract.this Contract.‌

Appears in 1 contract

Sources: Contract for Off Site Data Storage and Retrieval Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional informationreason, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Consulting Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct d irect the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The T he Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager M anager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within w ithin five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Contract Ma 060 15010201

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Consultant ServMicAe-s0f6o0r-I1n9m0a1t1e52T8elephone System File No. C021378 Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Consultant Services Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.Contract.(Note: this provision is optional for commodities and applicable for services) DocuSign Envelope ID: 06DD64CF-EE21-4324-94A5-4014391E0893

Appears in 1 contract

Sources: Contract for Equipment Rental

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County County, and shall not be changed without the written consent of the County’s Project Manager, Manager which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time linestimelines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Vision Plan Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Environmental Health Data Management System Contract

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Capital Improvement Project Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the express prior written consent approval of the County’s Project Manager, which consent approval shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager and key personnel from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract. Further, Contractor warrants that all persons employed to provide services under this Contract have satisfactory past work records indicating their ability to adequately perform the work under this Contract.

Appears in 1 contract

Sources: Contract for Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time linestimelines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Executive Level Program Management Contract

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The T he Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager M anager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within w ithin five (5) business days after written notice by the County’s Project Manager. The County’s Project P roject Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Elevator Maintenance and Repair Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager M anager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the ContractorC ontractor’s Project Manager from providing services to the County under this Contract. The T he County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Contract Ma 060 15011970

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Folder: 626663 17 Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager Initial: Wescraft, Inc. Contract #MA-060-13011719 shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Contract for New Mattresses and Re Cover Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager project manager to direct the Contractor’s Contractor‘s efforts in fulfilling Contractor’s Contractor‘s obligations under this Contract. This Project Manager project manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project ManagerCounty‘s project manager, which consent shall not be unreasonably withheld. The Contractor’s Contractor‘s Project Manager shall be assigned to this project for the duration of the this Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract, which exercise of such right shall be reasonable and based on good cause. The County’s 's Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is , which such approval shall not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contractbe unreasonably withheld.

Appears in 1 contract

Sources: Pharmacy Benefit Administrator Services Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. Contractor shall notify County’s Project Manager in the event the Contractor’s Project Manager is changed for any reason. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Contract for Water Treatment Chemicals and Related Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager M anager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The CountyC ounty’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Contract for Septic Tank Pumping, Cleaning and Maintenance

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. County of Orange MA-042-21011330 The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.Contract.(Note: this provision is optional for commodities and applicable for services)

Appears in 1 contract

Sources: Covid 19 Vaccination Services Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager project manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager project manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Managerproject manager, which consent shall not be unreasonably withheld. . a. The Contractor’s Project Manager shall be assigned to this project for the duration of the this Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required elects to provide any additional information, reason or rationale in the event it requires request the removal of Contractor’s Contractors Project Manager from providing further services to the County under the this Contract.

Appears in 1 contract

Sources: Performance Audit Services Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably umeasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Helicopter Flight Instructor Services and Advanced Flight Training Contract

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have has the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Diagnostic Testing Services Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Regional Cooperative Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager M anager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The T he Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager M anager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within w ithin five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Contract for High and Medium Voltage Equipment Maintenance and Repair

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager project manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager project manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Managerproject manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the this Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required elects to provide any additional information, reason or rationale in the event it requires request the removal of Contractor’s Contractors Project Manager from providing further services to the County under the this Contract.

Appears in 1 contract

Sources: Lake Management and Lake Water Quality Maintenance Services Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling fulf ▇▇▇▇▇▇ Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing f romproviding services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five f ive (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Contract for Reagent Rental and Test Kits

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Consulting Services Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional informationinfonnation, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Water Softener System Maintenance Contract

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is ls not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s ofContractor's Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Contract for the Replacement and Disposal of Lead Contaminated Filters and Bio Hazard Filters

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Unless noted in this Contract, this Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the from County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.. (Note: this provision is optional for commodities and applicable for services)

Appears in 1 contract

Sources: Public Opinion Survey Services Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to reasonable approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract, provided such removal is lawful. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Lease Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the ContractorC ontractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County C ounty under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Contract for Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further services under the Contract.. Docusign Envelope ID: 61D2AC74-1C84-4DED-8759-17AC0B3D29D5

Appears in 1 contract

Sources: E Payment Solution Services Contract

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project Project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Legal Process Services Contract

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further futiher services under the Contract.

Appears in 1 contract

Sources: Contract for Helicopter Flight Instructor Services and Advanced Flight Training

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager and key personnel shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. Key personnel are those individuals who report directly to the Contractor's Project Manager. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days immediately after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further services under the Contract.

Appears in 1 contract

Sources: Contract for Cyber Program Manager

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts 's eff01ts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by ▇▇▇▇▇▇.▇▇ the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further fmther services under the Contract.

Appears in 1 contract

Sources: Contract for Purchase and Delivery of Cellular Site Simulator Equipment