Coordinator. 6.4.1 The Coordinator shall be the intermediary between the Parties and the Funding Authority and shall perform all tasks assigned to it as described in the Grant Agreement and in the Consortium Agreement. 6.4.2 In particular, the Coordinator shall be responsible for: - monitoring compliance by the Parties with their obligations - keeping the address list of ECB members and other contact persons updated and available - collecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents to the Funding Authority - transmitting documents and information connected with the Project to any other Parties concerned - administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - providing, upon request, the Parties with official copies or originals of documents which are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims. 6.4.3 If a Party is late in submitting any Project deliverable, the Coordinator may nevertheless submit the other Parties’ Project deliverables and all other documents required by the Grant Agreement to the Funding Authority. 6.4.4 If the Coordinator fails in its coordination tasks, the ECB may propose a change of Coordinator to the Funding Authority. 6.4.5 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortium, unless explicitly stated otherwise in the Grant Agreement or the Consortium Agreement. 6.4.6 The Coordinator shall not enlarge its role beyond the tasks specified in the Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 The Coordinator shall be the intermediary between the Parties and the Funding Authority and shall perform all tasks assigned to it as described in the Grant Agreement and in the this Consortium Agreement.
6.4.2 In particular, the Coordinator shall be responsible for: - monitoring compliance by the Parties with their obligations - keeping the address list of ECB members Members and other contact persons updated and available - collecting, reviewing to verify consistency consistency, and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents to the Funding Authority - transmitting documents and information connected with the Project to any other Parties concerned - administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - providing, upon request, the Parties with official copies or originals of documents which are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims.
6.4.3 claims - organising a ‘mid-term review meeting’ between the Parties, the Partner Organisation(s) and the Agency before the deadline of/for the submission of the periodic report for reporting period 1 (RP 1) If a Party is one or more of the Parties are late in submitting submission of any Project project deliverable, the Coordinator may nevertheless submit the other Partiesparties’ Project project deliverables and all other documents required by the Grant Agreement to the Funding AuthorityAuthority in time.
6.4.4 6.4.3 If the Coordinator fails in its coordination tasks, the ECB Steering committee may propose a change of Coordinator to the Funding AuthorityAuthority to change the Coordinator.
6.4.5 6.4.4 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 6.4.5 The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 The Coordinator shall be the intermediary between the Parties and the Funding Authority and shall perform all tasks assigned to it as described in the Grant Agreement and in the this Consortium Agreement.
6.4.2 . In particular, the Coordinator shall be responsible for: - − monitoring compliance by the Parties with their obligations - − keeping the address list of ECB members Members and other contact persons updated and available - − collecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents to the Funding Authority - − transmitting documents and information connected with the Project to any other Parties concerned - − administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - − providing, upon request, the Parties with official copies or originals of documents which that are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims.
6.4.3 . If a Party one or more of the Parties is late in submitting submission of any Project project deliverable, the Coordinator may nevertheless submit the other ’Parties’ Project project deliverables and all other documents required by the Grant Agreement to the Funding Authority.
6.4.4 Authority in time. If the Coordinator fails in its coordination tasks, the ECB General Assembly may propose a change of Coordinator to the Funding Authority.
6.4.5 Authority to change the Coordinator. The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 . The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 The Coordinator shall be the intermediary between the Parties and the Funding Authority and shall perform all tasks assigned to it as described in the Grant Agreement and in the this Consortium Agreement.
6.4.2 In particular, the Coordinator shall be responsible for: - monitoring compliance by the Parties with their obligations obligations; - keeping the address list of ECB members Members and other contact persons updated and available available; - collecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents to the Funding Authority Authority; - transmitting documents and information connected with the Project to any other of the Parties concerned concerned; - administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 7.3; - providing, upon request, the Parties with official copies or originals of documents which are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims.
6.4.3 . If a Party one or more of the Parties is late in submitting submission of any Project project deliverable, the Coordinator may nevertheless submit the other Parties’ Project deliverables and all other documents required by the Grant Agreement to the Funding AuthorityAuthority in time.
6.4.4 6.4.3 If the Coordinator fails in its coordination tasks, the ECB General Assembly may propose a change of Coordinator to the Funding AuthorityAuthority to change the Coordinator.
6.4.5 6.4.4 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortiumConsortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 6.4.5 The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 6.4.1. The Coordinator shall be the intermediary between the Parties and the Funding Authority and shall perform all tasks assigned to it as described in the Grant Agreement and in the this Consortium Agreement.
6.4.2 6.4.2. In particular, the Coordinator shall be responsible for: - − monitoring compliance by the Parties with their obligations - − keeping the address list of ECB members Members and other contact persons updated and available - − collecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents to the Funding Authority - − transmitting documents and information connected with the Project to any other Parties concerned - − administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - − providing, upon request, the Parties with official copies or originals of documents which that are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims.
6.4.3 . If a Party one or more of the Parties is late in submitting submission of any Project project deliverable, the Coordinator may nevertheless submit the other Parties’ Project project deliverables and all other documents required by the Grant Agreement to the Funding AuthorityAuthority in time.
6.4.4 6.4.3. If the Coordinator fails in its coordination tasks, the ECB Steering Committee may propose a change of Coordinator to the Funding AuthorityAuthority to change the Coordinator.
6.4.5 6.4.4. The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 6.4.5. The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 The Coordinator shall be the intermediary between the Parties and the Funding Authority and shall perform all tasks assigned to it as described in the Grant Agreement and in the this Consortium Agreement.
6.4.2 In particular, the Coordinator shall be responsible for: - monitoring compliance by the Parties with their obligations - keeping the address list of ECB members Members and other contact persons updated and available - collecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certificationscertification) and specific requested documents to the Funding Authority - preparing the meetings, proposing decisions and preparing the agenda of Steering Board meetings, chairing the meetings, preparing the minutes of the meetings and monitoring the implementation of decisions taken at meetings transmitting promptly documents and information connected with the Project to any other Parties concerned - Party concerned, administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - providing, upon request, the Parties with official copies or originals of documents which that are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims.
6.4.3 . If a Party one or more of the Parties is late in submitting submission of any Project project deliverable, the Coordinator may nevertheless submit the other Parties’ Project deliverables and all other documents required by the Grant Agreement to the Funding AuthorityAuthority in time.
6.4.4 6.4.3 If the Coordinator fails in its coordination tasks, the ECB Steering Committee may propose a change of Coordinator to the Funding AuthorityAuthority to change the Coordinator.
6.4.5 6.4.4 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 6.4.5 The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 The Coordinator shall be the intermediary between the Parties and the Funding Authority and shall perform all tasks assigned to it as described in the Grant Agreement and in the this Consortium Agreement.
6.4.2 In particular, the Coordinator shall be responsible for: - monitoring compliance by the Parties with their obligations - keeping the address list of ECB members Members and other contact persons updated and available - collecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents to the Funding Authority - transmitting documents and information connected with the Project to any other Parties concerned - administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - providing, upon request, the Parties with official copies or originals of documents which are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims.
6.4.3 . If a Party one or more of the Parties is late in submitting submission of any Project project deliverable, the Coordinator may nevertheless submit the other Partiesparties’ Project project deliverables and all other documents required by the Grant Agreement to the Funding AuthorityAuthority in time.
6.4.4 6.4.3 If the Coordinator fails in its coordination tasks, the ECB Project Management Board may propose a change of Coordinator to the Funding AuthorityAuthority to change the Coordinator.
6.4.5 6.4.4 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 6.4.5 The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 The Coordinator shall be the intermediary between the Parties and the Funding Authority and shall perform all tasks assigned to it as described in the Grant Agreement and in the this Consortium Agreement.
6.4.2 In particular, the Coordinator shall be responsible for: - monitoring compliance by the Parties with their obligations - keeping the address list of ECB members Members and other contact persons updated and available - collecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents to the Funding Authority - transmitting documents and information connected with the Project to any other Parties concerned - administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - providing, upon request, the Parties with official copies or originals of documents which that are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims.
6.4.3 . If a Party one or more of the Parties is late in submitting submission of any Project project deliverable, the Coordinator may nevertheless submit the other Parties’ Project Parties project deliverables and all other documents required by the Grant Agreement to the Funding AuthorityAuthority in time.
6.4.4 6.4.3 If the Coordinator fails in its coordination tasks, the ECB General Assembly may propose a change of Coordinator to the Funding AuthorityAuthority to change the Coordinator.
6.4.5 6.4.4 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 6.4.5 The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 The Coordinator shall be the intermediary between the Parties and the Funding Authority and shall perform all tasks assigned to it as described in the Grant Agreement and in the this Consortium Agreement.
6.4.2 In particular, the Coordinator shall be responsible for: - • overseeing the contributions of the project to the continuous development of the ▇▇▇▇▇ RI. • monitoring compliance by the Parties with their obligations - as defined in the Grant Agreement • keeping the address list of ECB members Members and other contact persons updated and available - available, thereby as- certaining compliance with the General Data Protection Regulation (GDPR) • collecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents to the Funding Authority - • transmitting documents and information connected with the Project to any other Parties concerned - • administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - • providing, upon request, the Parties with official copies or originals of documents which are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims.
6.4.3 claims or for other legal reasons. • preparing the agendas of General Assembly meetings and Steering Committee meetings. If a Party one or more of the Parties is late in submitting submission of any Project project deliverable, the Coordinator may nevertheless neverthe- less submit the other Partiesparties’ Project project deliverables and all other documents required by the Grant Agreement to the Funding AuthorityAuthority in time.
6.4.4 6.4.3 If the Coordinator fails in its coordination tasks, the ECB General Assembly may propose a change of Coordinator to the Funding AuthorityAuthority to change the Coordinator.
6.4.5 6.4.4 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortium, unless explicitly stated otherwise in the Grant Agreement or the Consortium Agreement.
6.4.6 6.4.5 The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 The Coordinator shall be the intermediary between the Parties and the Funding Authority and shall perform all tasks assigned to it as described in the Grant Agreement and in the this Consortium Agreement.
6.4.2 In particular, the Coordinator shall be responsible for: - monitoring compliance by the Parties with their obligations - keeping the address list of ECB members Members and other contact persons updated and available - collecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents to the Funding Authority - transmitting documents and information connected with the Project to any other Parties concerned - administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - providing, upon request, the Parties with official copies or originals of documents which are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims.
6.4.3 . If a Party one or more of the Parties is late in submitting submission of any Project project deliverable, the Coordinator may nevertheless submit the other Partiesparties’ Project project deliverables and all other documents required by the Grant Agreement to the Funding AuthorityAuthority in time.
6.4.4 6.4.3 If the Coordinator fails in its coordination tasks, the ECB Steering Board may propose a change of Coordinator to the Funding AuthorityAuthority to change the Coordinator.
6.4.5 6.4.4 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 6.4.5 The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement. The Management Support Team shall be proposed by the Coordinator and shall assist the Coordinator in executing the decisions of the Steering Board as well as the day-to-day management of the Project. This will also include risk management , ethics and gender issue.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 The Coordinator shall be the intermediary between the Parties and the Funding Authority and shall perform all tasks assigned to it as described in the Grant Agreement and in the this Consortium Agreement.
6.4.2 In particular, the Coordinator shall be responsible for: - monitoring compliance by the Parties with their obligations - keeping the address list of ECB members Members and other contact persons updated and available - collecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents to the Funding Authority - transmitting documents and information connected with the Project to any other Parties concerned - administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - providing, upon request, the Parties with official copies or originals of documents which are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims.
6.4.3 . If a Party one or more of the Parties is late in submitting submission of any Project deliverable, the Coordinator may nevertheless submit the other Parties’ Project deliverables and all other documents required by the Grant Agreement to the Funding AuthorityAuthority in time.
6.4.4 6.4.3 If the Coordinator fails in its coordination tasks, the ECB Supervisory Board may propose a change of Coordinator to the Funding AuthorityAuthority to change the Coordinator.
6.4.5 6.4.4 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 6.4.5 The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 The Coordinator shall be the intermediary between the Parties and the Funding Authority and shall perform all tasks assigned to it as described in the Annex I to the Consortium Agreement, Grant Agreement and in the this Consortium Agreement.
6.4.2 In particular, the Coordinator shall be responsible for: - − monitoring compliance by the Parties with their obligations - − keeping the address list of ECB members Members and other contact persons updated and available - − collecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents to the Funding Authority - − transmitting documents and information connected with the Project to any other Parties concerned - administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - − providing, upon request, the Parties with official copies or originals of documents which that are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims.
6.4.3 . If a Party one or more of the Parties is late in submitting submission of any Project project deliverable, the Coordinator may nevertheless submit the other ’Parties’ Project project deliverables and all other documents required by the Grant Agreement to the Funding AuthorityAuthority in time.
6.4.4 6.4.3 If the Coordinator fails in its coordination tasks, the ECB General Assembly may propose a change of Coordinator to the Funding AuthorityAuthority to change the Coordinator.
6.4.5 6.4.4 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 6.4.5 The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 The Coordinator shall be the intermediary between the Parties and the Funding Authority and shall perform all tasks assigned to it as described in the Grant Agreement and in the this Consortium Agreement.
6.4.2 In particular, the Coordinator shall be responsible for: - monitoring compliance by the Parties with their obligations - keeping the address list of ECB members Members and other contact persons updated and available - collecting, reviewing to verify consistency and submitting reports, information on the progress of the Project and reports and other deliverables (including financial statements and related certificationscertification) and specific requested documents to the Funding Authority - preparing the meetings, proposing decisions and preparing the agenda of Project Management Committee meetings, preparing the minutes of the meetings and monitoring the implementation of decisions taken at meetings transmitting promptly documents and information connected with the Project to any other Parties concerned - Project,, administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - providing, upon request, the Parties with official copies or originals of documents which are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims.
6.4.3 . If a Party one or more of the Parties is late in submitting submission of any Project project deliverable, the Coordinator may nevertheless submit the other Partiesparties’ Project project deliverables and all other documents required by the Grant Agreement to the Funding AuthorityAuthority in time.
6.4.4 6.4.3 If the Coordinator fails in its coordination tasks, a majority of the ECB other Partners may propose a change of Coordinator to the Funding AuthorityAuthority to change the Coordinator.
6.4.5 6.4.4 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 6.4.5 The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 The Coordinator shall be the intermediary between the Parties and the Funding Authority and shall perform all tasks assigned to it as described in the Grant Agreement and in the this Consortium Agreement.
6.4.2 In particular, the Coordinator shall be responsible for: - monitoring compliance by the Parties with their obligations - keeping the address list of ECB members Members and other contact persons updated and available - collecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents to the Funding Authority - transmitting documents and information connected with the Project to any other Parties concerned - administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - providing, upon request, the Parties with official copies or originals of documents which are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims.
6.4.3 . If a Party one or more of the Parties is late in submitting submission of any Project project deliverable, the Coordinator may nevertheless submit the other Partiesparties’ Project project deliverables and all other documents required by the Grant Agreement to the Funding AuthorityAuthority in time.
6.4.4 6.4.3 If the Coordinator fails in its coordination tasks, the ECB Steering Committee may propose a change of Coordinator to the Funding AuthorityAuthority to change the Coordinator.
6.4.5 6.4.4 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 6.4.5 The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 6.3.4.1 The Coordinator shall be the intermediary between the Parties Parties, the Partner Organisations and the Funding Authority and Authority. The Coordinator shall perform all tasks assigned to it itself as described in the Grant Agreement and in the this Consortium Agreement.
6.4.2 6.3.4.2 In particular, the Coordinator shall be responsible for: - monitoring Monitoring compliance by the Parties and the Partner Organisations with their obligations - keeping Submitting information to the address list Funding Authority on the progress of ECB members the Project and reports and other contact persons updated and available deliverables once reviewed by the Coordination-Management Team. - collectingCollecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents certification to the Funding Authority - transmitting documents and information connected with the Project to any other Parties concerned - administering Administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - providingProviding, upon request, the Parties and the Partner Organisations with official copies or originals of documents which are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties and the Partner Organisations to present claims.
6.4.3 . If a Party one or more of the Parties and the Partner Organisations is late in submitting submission of any Project project deliverable, the Coordinator may nevertheless submit the other PartiesParties and the Partner Organisations’ Project deliverables and all other documents required by the Grant Agreement to the Funding AuthorityAuthority in time.
6.4.4 6.3.4.3 If the Coordinator fails in its coordination tasks, the ECB Steering Committee may propose to the Governing Board to change the Coordinator. In this case, the Governing Board may take a decision to propose to change of the Coordinator to the Funding Authority.
6.4.5 6.3.4.4 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party Party, Partner Organisation or of the consortiumConsortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 6.3.4.5 The Coordinator shall not enlarge its his role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 5.5.1 The Coordinator shall be the intermediary between the Parties and the Funding Authority funding authority and shall perform all tasks assigned to it as described in the Grant Agreement grant agreement and in the this Consortium Agreement.
6.4.2 5.5.2 In particular, the Coordinator shall be responsible for: - − monitoring compliance by the Parties with their obligations - obligations; − keeping the address list of ECB members Members and other contact persons updated and available - available; − collecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents to the Funding Authority - funding authority; − transmitting documents and information connected with the Project to any other Parties concerned - concerned; − administering the financial contribution of the Funding Authority funding authority and fulfilling the financial tasks described in Section 7.3 - 6.4; − providing, upon request, the Parties with official copies or originals of documents which that are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims.
6.4.3 . If a Party one or more of the Parties is late in submitting submission of any Project project deliverable, the Coordinator may nevertheless submit the other ’Parties’ Project project deliverables and all other documents required by the Grant Agreement to the Funding Authorityfunding authority in time.
6.4.4 5.5.3 If the Coordinator fails in its coordination tasks, the ECB General Assembly may propose a change of Coordinator to the Funding Authorityfunding authority to change the Coordinator.
6.4.5 5.5.4 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 5.5.5 The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 6.4.1. The Coordinator shall be the intermediary between the Parties and the Funding Authority and shall perform all tasks assigned to it as described in the Grant Agreement and in the this Consortium Agreement.
6.4.2 6.4.2. In particular, the Coordinator shall be responsible for: - monitoring compliance by the Parties with their obligations - keeping the address list of ECB members Members and other contact persons updated and available - collecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents to the Funding Authority - transmitting documents and information connected with the Project to any other Parties concerned - administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - providing, upon request, the Parties with official copies or originals of documents which that are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims.
6.4.3 . If a Party one or more of the Parties is late in submitting submission of any Project project deliverable, the Coordinator may nevertheless submit the other ’Parties’ Project project deliverables and all other documents required by the Grant Agreement to the Funding AuthorityAuthority in time.
6.4.4 6.4.3. If the Coordinator fails in its coordination tasks, the ECB General Assembly may propose a change of Coordinator to the Funding AuthorityAuthority to change the Coordinator.
6.4.5 6.4.4. The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 6.4.5. The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 The Coordinator shall be the intermediary between the Parties and the Funding Authority and shall perform all tasks assigned to it as described in the Grant Agreement and in the this Consortium Agreement.
6.4.2 In particular, the Coordinator shall be responsible for: - monitoring compliance by the Parties with their obligations - keeping the address list of ECB members Members and other contact persons updated and available - collecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents to the Funding Authority - transmitting documents and information connected with the Project to any other Parties concerned - administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - providing, upon request, the Parties with official copies or originals of documents which are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims.
6.4.3 . preparing any necessary amendments to the Grant agreement with the Funding Authority, decided upon by the General Assembly. If a Party one or more of the Parties is late in submitting submission of any Project deliverable, the Coordinator may nevertheless submit the other Partiesparties’ Project deliverables and all other documents required by the Grant Agreement to the Funding AuthorityAuthority in time.
6.4.4 6.4.3 If the Coordinator fails in its coordination tasks, the ECB General Assembly may propose a change of Coordinator to the Funding AuthorityAuthority to change the Coordinator.
6.4.5 6.4.4 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 6.4.5 The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 The Coordinator shall be the intermediary between the Parties and the Funding Authority and shall perform all tasks assigned to it as described in the Grant Agreement and in the this Consortium Agreement.
6.4.2 In particular, the Coordinator shall be responsible for: - • monitoring compliance by the Parties with their obligations - • keeping the address list of ECB members Members and other contact persons updated and available - • collecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents to the Funding Authority - • transmitting documents and information connected with the Project to any other Parties concerned - • administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - • providing, upon request, the Parties with official copies or originals of documents which are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims.
6.4.3 . If a Party one or more of the Parties is late in submitting submission of any Project project deliverable, the Coordinator may nevertheless submit the other Partiesparties’ Project project deliverables and all other documents required by the Grant Agreement to the Funding AuthorityAuthority in time.
6.4.4 6.4.3 If the Coordinator fails in its coordination tasks, the ECB PSC may propose a change of Coordinator to the Funding AuthorityAuthority to change the Coordinator.
6.4.5 6.4.4 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 6.4.5 The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 The Coordinator shall be the intermediary between the Parties and the Funding Authority and shall perform all tasks assigned to it as described in the Grant Agreement and in the this Consortium Agreement.
6.4.2 In particular, the Coordinator shall be responsible for: - monitoring compliance by the Parties with their obligations - keeping the address list of ECB members Members and other contact persons updated and available - collecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents to the Funding Authority - transmitting documents and information connected with the Project to any other Parties concerned - administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - providing, upon request, the Parties with official copies or originals of documents which are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims.
6.4.3 . If a Party one or more of the Parties is late in submitting submission of any Project deliverable, the Coordinator may nevertheless submit the other Partiesparties’ Project deliverables and all other documents required by the Grant Agreement to the Funding AuthorityAuthority in time.
6.4.4 6.4.3 If the Coordinator fails in its coordination tasks, the ECB Executive Committee may propose a change of Coordinator to the Funding AuthorityAuthority to change the Coordinator.
6.4.5 6.4.4 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 6.4.5 The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 The Coordinator shall be the intermediary between the Parties and the Funding Authority and shall perform all tasks assigned to it as described in the Grant Agreement and in the this Consortium Agreement.
6.4.2 In particular, the Coordinator shall be responsible for: - monitoring compliance by the Parties with their obligations - keeping the address list of ECB members Members and other contact persons updated and available - collecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents to the Funding Authority - transmitting documents and information connected with the Project to any other Parties concerned - administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - providing, upon request, the Parties with official copies or originals of documents which are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties to present claims.
6.4.3 . If a Party one or more of the Parties is late in submitting submission of any Project deliverable, the Coordinator may nevertheless submit the other Partiesparties’ Project deliverables and all other documents required by the Grant Agreement to the Funding AuthorityAuthority in time.
6.4.4 6.4.3 If the Coordinator fails in its coordination tasks, the ECB General Assembly may propose a change of Coordinator to the Funding AuthorityAuthority to change the Coordinator.
6.4.5 6.4.4 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or of the consortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 6.4.5 The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement
Coordinator. 6.4.1 The Coordinator shall be the intermediary between the Parties Participants and the Funding Authority and shall perform all tasks assigned to it as described in the Grant Agreement and in the this Consortium Agreement.
6.4.2 In particular, the Coordinator shall be responsible for: - monitoring compliance by the Parties Participants with their obligations - obligations, keeping the address list of ECB members Members and other contact persons updated and available - available, collecting, reviewing to verify consistency and submitting reports, other deliverables (including financial statements and related certifications) and specific requested documents to the Funding Authority - Authority, transmitting documents and information connected with the Project to any other Parties concerned - Participants concerned, administering the financial contribution of the Funding Authority and fulfilling the financial tasks described in Section 7.3 - 7.3, providing, upon request, the Parties Beneficiaries with official copies or originals of documents which that are in the sole possession of the Coordinator when such copies or originals are necessary for the Parties Beneficiaries to present claims.
6.4.3 If a Party one or more of the Participants is late in submitting submission of any Project deliverable, the Coordinator may nevertheless submit the other PartiesParticipants’ Project deliverables and all other documents required by the Grant Agreement to the Funding AuthorityAuthority in time.
6.4.4 If the Coordinator fails in its coordination tasks, the ECB General Assembly may propose a change of Coordinator to the Funding AuthorityAuthority to change the Coordinator.
6.4.5 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party Participant or of the consortiumConsortium, unless explicitly stated otherwise in the Grant Agreement or the this Consortium Agreement.
6.4.6 The Coordinator shall not enlarge its role beyond the tasks specified in the this Consortium Agreement and in the Grant Agreement.
Appears in 1 contract
Sources: Consortium Agreement