CTC Facility Engineering, Management and Monitoring Sample Clauses

The 'CTC Facility Engineering, Management and Monitoring' clause outlines the responsibilities related to the design, operation, and oversight of a Centralized Traffic Control (CTC) facility. It typically specifies the standards for engineering the facility, the protocols for ongoing management, and the requirements for continuous monitoring to ensure safe and efficient train operations. For example, it may require regular system checks, maintenance schedules, and reporting procedures for any detected issues. The core function of this clause is to ensure that the CTC facility operates reliably and safely, minimizing operational risks and enhancing the overall efficiency of rail traffic management.
CTC Facility Engineering, Management and Monitoring. 1.1.1 Provide the facility to house all computing and network equipment with highly redundant power sources and environmental controls 1.1.2 Includes CTC facility equipment design and engineering, with monitoring and management of operating environments; includes multiple uninterruptible power supplies (UPS) and backup generators, computer room chillers and air conditioning systems

Related to CTC Facility Engineering, Management and Monitoring

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Project Monitoring The Developer shall provide regular status reports to the NYISO in accordance with the monitoring requirements set forth in the Development Schedule, the Public Policy Transmission Planning Process Manual and Attachment Y of the OATT.

  • Project Management Project Management Institute (PMI) certified project manager executing any or all of the following: • Development of Project Charter • Development of project plan and schedule • Coordination and scheduling of project activities across customer and functional areas • Consultation on operational and infrastructure requirements, standards and configurations • Facilitate project status meetings • Timely project status reporting • Address project issues with functional areas and management • Escalation of significant issues to customers and executive management • Manage project scope and deliverable requirements • Document changes to project scope and schedule • Facilitate and document project closeout

  • SITE MANAGEMENT We reserve the right, but not the obligation, to: (1) monitor the Site for violations of these Terms of Use; (2) take appropriate legal action against anyone who, in our sole discretion, violates the law or these Terms of Use, including without limitation, reporting such user to law enforcement authorities; (3) in our sole discretion and without limitation, refuse, restrict access to, limit the availability of, or disable (to the extent technologically feasible) any of your Contributions or any portion thereof; (4) in our sole discretion and without limitation, notice, or liability, to remove from the Site or otherwise disable all files and content that are excessive in size or are in any way burdensome to our systems; and (5) otherwise manage the Site in a manner designed to protect our rights and property and to facilitate the proper functioning of the Site.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.