Data Review and Technical Memorandum Clause Samples

Data Review and Technical Memorandum. CONSULTANT will present renderings to the CITY and discuss options and refinements. Subsequently, CONSULTANT will prepare a technical memorandum and updated renderings of the agreed upon improvements as well as an EOPCC.
Data Review and Technical Memorandum. CONSULTANT inspect the chlorine contact tank and document the condition of the existing structure and prepare a schedule of recommended repairs and well as a suggested coating system. Subsequently, CONSULTANT will prepare a draft technical memorandum summarizing findings conclusions and recommendations. The memorandum will include photographs, a plan view with repair schedule, and an EOPCC. CONSULTANT will meet the CITY to discuss the memorandum and revise the document pursuant to review comments.
Data Review and Technical Memorandum. CONSULTANT will review plant operating data, BioWin modeling and project record documents and determine the location, capacity, and configuration of the proposed submersible internal recycle pumps in each process train. CONSULTANT will prepare a draft technical memorandum summarizing the findings conclusions and recommendations resulting from the above efforts. The memorandum will also include graphics and equipment data to clearly present the size, type, and configuration of the proposed facilities. The memorandum will include a preliminary engineer’s opinion of probable construction cost (EOPCC). CONSULTANT will meet the CITY to discuss the memorandum and revise the document pursuant to review comments.

Related to Data Review and Technical Memorandum

  • Technical Specifications The purpose of the Technical Specifications (TS), is to define the technical characteristics of the Goods and Related Services required by the Procuring Entity. The Procuring Entity shall prepare the detailed TS consider that:

  • Technical Data For the purpose of this Agreement, "TECHNICAL DATA" shall mean all information of the Company in written, graphic or tangible form relating to any and all products which are developed, formulated and/or manufactured by the Company, as such information exists as of the Effective Date or is developed by the Company during the term hereof.

  • Statement of Work The Statement of Work to which Grantee is bound is incorporated into and made a part of this Grant Agreement for all purposes and included as Attachment A.

  • Updated Information Submission by Interconnection Customer The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. The Interconnection Customer shall submit a completed copy of the Electric Generating Unit data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to the Participating TO and the CAISO for the Interconnection Studies. Information in this submission shall be the most current Electric Generating Unit design or expected performance data. Information submitted for stability models shall be compatible with the Participating TO and CAISO standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information.

  • Licensed Documentation If commercially available, Licensee shall have the option to require the Contractor to deliver, at Contractor’s expense: (i) one (1) hard copy and one (1) master electronic copy of the Documentation in a mutually agreeable format; (ii) based on hard copy instructions for access by downloading from the Internet