DC Re- Combiner Box Commissioning Clause Samples

The DC Re-Combiner Box Commissioning clause outlines the requirements and procedures for testing and verifying the proper installation and operation of DC re-combiner boxes in a solar power system. This typically involves inspecting the equipment for correct wiring, ensuring all safety features are functional, and performing electrical tests to confirm performance standards are met. By establishing clear commissioning steps, the clause ensures that the re-combiner boxes are safe, reliable, and ready for integration into the overall electrical system, thereby reducing the risk of operational failures and ensuring compliance with project specifications.
DC Re- Combiner Box Commissioning. All the DC Re-Combiner Boxes are inspected and tested to verify the following: a) Confirm proper input circuit voltage. b) Verification of proper string polarity. c) Confirmation that there are no ground-faults present. d) Verify that all fuses are properly sized and fuse holders operate properly. e) Verify that disconnect switch operates properly. f) Verify that equipment ground is properly installed. g) Verify that all conduit is properly installed and sealed. h) Verify that all string feeder cable termination lugs are properly torqued and torque-marks are appropriately applied. i) Verify that re-combiner bus-bars reflect no damage. j) Verification that all string feeder cables have been installed to the requirements of the design drawings and all cable testing has been completed. k) Verify that door seal is intact and that door operation is correct, with no bowing or off-center closure, all locking mechanisms are in place, no surface damage is evident that has not been repaired according to manufacturer’s specifications, and no enclosure integrity is compromised. l) Verify that UL label (where required) is present and that the equipment voltage class meets the operating voltage class.

Related to DC Re- Combiner Box Commissioning

  • Statewide HUB Program Statewide Procurement Division Note: In order for State agencies and institutions of higher education (universities) to be credited for utilizing this business as a HUB, they must award payment under the Certificate/VID Number identified above. Agencies, universities and prime contractors are encouraged to verify the company’s HUB certification prior to issuing a notice of award by accessing the Internet (▇▇▇▇▇://▇▇▇▇▇.▇▇▇.▇▇▇▇▇.▇▇.▇▇/tpasscmblsearch/index.jsp) or by contacting

  • Synchronization, Commissioning and Commercial Operation 5.1.1 The SPG shall give PGVCL at least thirty (30) days’ advanced preliminary written notice and at least fifteen (15) days’ advanced final written notice, of the date on which it intends to synchronize the Solar Power Project to the Grid System. 5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the SPG to the Grid System when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the SPG at its generation facility of the Power Project at its own cost. The SPG shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/ and checking/verification is made by the concerned authorities of the PGVCL. 5.1.4 The SPG shall immediately after each synchronization/tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. In addition, the SPG will inject in-firm power to grid from time to time to carry out operational/ functional test prior to commercial operation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project. 5.1.5 The SPG shall commission the Project within nine (9) Months from the Date of execution of this PPA. Declaration of COD shall be certified by the commissioning committee. 5.1.6 The Parties agree that for the purpose of commencement of the supply of electricity by SPG to PGVCL, liquidated damages for delay etc., the Scheduled Commissioning Date as defined in this Agreement shall be the relevant date.

  • CEQA Activities funded under this Grant Agreement, regardless of funding source, must be in compliance with the California Environmental Quality Act (CEQA). (Pub. Resources Code, § 21000 et seq.) Any work that is subject to CEQA and funded under this Agreement shall not proceed until documents that satisfy the CEQA process are received by the DWR Grant Manager and the State has completed its CEQA compliance. Work funded under this Agreement that is subject to a CEQA document shall not proceed until and unless approved by the Department of Water Resources. Such approval is fully discretionary and shall constitute a condition precedent to any work for which it is required. If CEQA compliance by the Grantee is not complete at the time the State signs this Agreement, once the State has considered the environmental documents, it may decide to require changes, alterations, or other mitigation to the Project; or to not fund the Project. Should the State decide to not fund the Project, this Agreement shall be terminated in accordance with Paragraph 10, “Default Provisions.”

  • Commissioning Commissioning tests of the Interconnection Customer’s installed equipment shall be performed pursuant to applicable codes and standards. The ISO and Connecting Transmission Owner must be given at least five Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.