Delay in Development Clause Samples

The 'Delay in Development' clause defines the procedures and consequences when a project or product development does not proceed according to the agreed timeline. Typically, this clause outlines what constitutes a delay, the responsibilities of each party in notifying and addressing delays, and any remedies or penalties that may apply, such as extensions of time or liquidated damages. Its core practical function is to allocate risk and provide a clear framework for managing setbacks, ensuring that both parties understand their obligations and the steps to take if development milestones are not met as scheduled.
POPULAR SAMPLE Copied 2 times
Delay in Development. If the Operator fails to comply with Clause 12.1 for reasons other than those set out in Clause 12.2, the Operator shall pay to the Authority the Liquidated Damages for such delay (which sum shall be the only monies due from the Operator for such delay) for every day which shall elapse between the relevant Time for Completion and the date stated in the relevant Performance Certificate, provided that the total of all Liquidated Damages payable by the Operator pursuant to this Clause 13.1 shall not exceed the total maximum sum of [ ]7 If the delay exceeds 12 (twelve) months, then the Authority shall be entitled to Terminate this Agreement in accordance with the provisions of Clause 29.
Delay in Development. 13.1 If the Private party fails to comply with Clause 12.1 for reasons other than those set out in Clause12.2, the Private party shall pay to the Contracting Authority the Liquidated Damages for such delay (which sum shall be the only monies due from the Private party for such delay) for every day which shall elapse between the relevant Time for Completion and the date stated in the relevant Performance Certificate, provided that the total of all Liquidated Damages payable by the Private party pursuant to this Clause 13.1 shall not exceed the amount of performance security []7. 13.2 If the Private party delays by the number of days for which the maximum amount of liquidated damages can be deducted, the Contracting Authority shall be entitled to terminate this Agreement in accordance with the provisions of Clause22.
Delay in Development. The Proposed Development is currently in its inception stage. Similar to other property development projects, the Proposed Development is subject to various regulatory approvals and timely completion. It is also dependent on many external factors such as obtaining approvals as scheduled, changes in government legislation, shortages in the availability of construction materials, availability of financing at viable terms, the satisfactory performance of contractors, availability of manpower and weather condition. Although NewCo will seek to limit these potential delays through, amongst others, efficient project management and long-term relationships with reliable suppliers or contractors, there can be no assurance that these factors will not lead to delays in the completion of the Proposed Development.

Related to Delay in Development

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

  • Career Development The City and the Union agree that employee career growth can be beneficial to both the City and the affected employee. As such, consistent with training needs identified by the City and the financial resources appropriated therefore by the City, the City shall provide educational and training opportunities for employee career growth. Each employee shall be responsible for utilizing those training and educational opportunities made available by the City or other institutions for the self- development effort needed to achieve personal career goals.

  • Independent Development Receiving Party may currently or in the future be developing information internally, or receiving information internally, or receiving information from other parties that may be similar to the Disclosing Party's Confidential Information. Accordingly, nothing in this Agreement will be construed as a representation or inference that Receiving Party will not develop or have developed products or services, that, without violation of this Agreement, might compete with the products or systems contemplated by the Disclosing Party's Confidential Information.

  • Design Development Phase 1.3.1 Based on the approved Schematic Design Documents, model(s) and any adjustments to the Program of Requirements, BIM Execution Plan or Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Design Development Documents derived from the model(s) in accordance with Owner’s written requirements to further define and finalize the size and character of the Project in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review the Design Development documents as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Design Development. The Architect/Engineer shall allow the Construction Manager to utilize the information uploaded into Owner’s PMIS to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.3.2 As a part of Design Development Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Architect/Engineer shall utilize Owner’s PMIS to accomplish model coordination and collaborate with Construction Manager in the resolution of critical clashes identified by the Construction Manager. Architect/Engineer shall demonstrate and provide written assurance to Owner that conflicts/collisions between models have been resolved. 1.3.3 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.3.4 Before proceeding into the Construction Document Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Design Development documents and approval of the mutually established Amount Available for the Construction Contract and schedule. 1.3.5 The Architect/Engineer shall prepare presentation materials including an animation derived from the model(s) as defined in “Facility Design Guidelines” at completion of Design Development and if so requested shall present same to the Board of Regents at a regular meeting where scheduled within the state. 1.3.6 The Architect/Engineer shall prepare preliminary recommended furniture layouts for all spaces where it is deemed important to substantiate the fulfillment of program space requirements, or to coordinate with specific architectural, mechanical and electrical elements. 1.3.7 Architect/Engineer shall assist the Owner, if requested, with seeking approval of the Project by the Texas Higher Education Coordinating Board (THECB). Such assistance shall include (i) the preparation of a listing of the rooms and square footages in the Project, and (ii) the preparation of project cost information, in accordance with THECB Guidelines. This information shall be provided at the completion of the Design Development Phase when requested by the Owner. The listing of rooms and square footages shall then be updated to reflect any changes occurring during construction and provided to the Owner at Substantial Completion. 1.3.8 At the completion of the Design Development Phase, or such other time as Owner may specify to Architect/Engineer, at Owner’s sole option and discretion, Owner will furnish Architect/Engineer with a Guaranteed Maximum Price proposal prepared by Construction Manager based upon the Design Development documents prepared by the Architect/Engineer and approved by the Owner. The Architect/Engineer shall assist the Owner and endeavor to further and advocate the Owner’s interests in Owner’s communications with the Construction Manager in an effort to develop a Guaranteed Maximum Price proposal acceptable to Owner, in Owner’s sole option and discretion. If the Owner does not accept the Construction Manager’s Guaranteed Maximum Price proposal, the Architect/Engineer shall participate with the Owner and Construction Manager in constructability reviews and shall revise the documents as necessary in order to reach an agreement. If the Construction Manager’s Guaranteed Maximum Price proposal exceeds the Schematic Design Phase Estimated Construction Cost prepared by, or otherwise accepted by the Construction Manager due to an increase in the scope of the Project caused by further development of the design documents by the Architect/Engineer to the extent that such could not be reasonably inferred by the Construction Manager from the Schematic Design documents, and Owner directs Architect/Engineer to revise the documents, the Architect/Engineer shall revise the documents at its own expense so that the Guaranteed Maximum Price proposal for constructing the Project shall not exceed the Owner’s Amount Available for the Construction Contract and any previously approved Estimated Construction Costs. If it is determined to be in the Owner’s best interest, instead of requiring the Architect/Engineer to revise the Drawings and Specifications, the Owner reserves the right to accept a Guaranteed Maximum Price proposal that exceeds the stipulated Amount Available for the Construction Contract. The Architect/Engineer shall analyze the final Guaranteed Maximum Price proposal document, together with its supporting assumptions, clarifications, and contingencies, and shall submit a detailed written analysis of the document to the Owner. Such analysis shall include, without limitation, reference to and explanation of any inaccurate or improper assumptions and clarifications. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the Owner’s rejection of the Guaranteed Maximum Price proposal is not due to a failure of the A/E to provide the services otherwise required herein. 1.3.9 After the Guaranteed Maximum Price has been accepted, the Architect/Engineer shall incorporate necessary revisions into the Design Development documents. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the revisions are required as the result of inaccurate assumptions and clarifications made in the development of the Guaranteed Maximum Price proposal that are not due to a failure of the A/E to provide the services otherwise required herein.

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK