MATERIALS AND WORKMANSHIP (a) All equipment, material, and articles incorporated into the work covered by this Agreement shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this Agreement. (b) Seller shall obtain Company approval of the machinery and mechanical and other equipment to be incorporated into the work. When required by Company, Seller shall also obtain Company's approval of the material or articles which Seller contemplates incorporating into the work. When so directed, Seller shall submit samples for approval at Seller's expense. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection. (c) References in the specifications or drawings to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. Seller may, with Company's written approval, use any equipment, material, article, or process that is equal to that specified, unless the words "No Substitution" follow the listing of the item in the specifications or drawings. Unless otherwise agreed, modifications due to use of “or equal” supplies, is at Seller’s expense. (d) All work under this Agreement shall be performed in a skillful and workmanlike manner. Company may require, in writing, Seller to remove from the work any employee Company deems incompetent, careless, or otherwise objectionable.
WORKMANSHIP AND MATERIALS 1.10.1 Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Order. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment. 1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work. 1.10.3 The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price. 1.10.4 Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building. 1.10.5 Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.
Personnel Equipment and Material Engineer shall furnish and maintain, at its own expense, quarters for the performance of all Engineering Services, and adequate and sufficient personnel and equipment to perform the Engineering Services as required. All employees of Engineer shall have such knowledge and experience as will enable them to perform the duties assigned to them. Any employee of Engineer who, in the reasonable opinion of County, is incompetent or whose conduct becomes detrimental to the Engineering Services shall immediately be removed from association with the Project when so instructed by County. Engineer certifies that it presently has adequate qualified personnel in its employment for performance of the Engineering Services required under this Contract, or will obtain such personnel from sources other than County. Engineer may not change the Project Manager without prior written consent of County.
Equipment and Materials CONTRACTOR shall provide all equipment, materials, and supplies necessary for the performance on the Agreement except: