Design Development and 100% Construction Drawings. The Developer shall submit for approval to Civic San Diego Design Development, 50% Construction Drawings and 100% Construction Drawings which implement the design intent of the Basic Concept/Schematic Drawings and any requirements included in the Centre City Development Permit No. 2011-59.
Appears in 1 contract
Design Development and 100% Construction Drawings. The Developer shall submit for approval to Civic San Diego Design Development, 50% Construction Drawings and 100% Construction Drawings which implement the design intent of the Basic Concept/Schematic Drawings and any requirements included in the Centre City Development Permit No. 20112013-5909.
Appears in 1 contract