Design Development and Preliminary Construction Budget and Schedule. Upon the JPBC’s approval of the Schematic Design Documents for the Purpose-Built Facility, LONZA shall prepare and submit to the JPBC preliminary drawings of sufficient detail to describe the size, shape, configuration, and quantity of typical and non-typical elements of the Purpose-Built Facility, outline specifications and other documents that fix and describe the size and character of the Purpose-Built Facility as to architecture, engineering, structure, layout, electrical systems, mechanical systems, plumbing systems, materials and equipment, all of which documents are collectively referred to herein as the “Design Development Documents.” Based on such Design Development Documents, LONZA shall further prepare and submit to the JPBC for approval a detailed preliminary budget and schedule of proposed work tasks to be completed and estimated costs to be incurred for the construction of the Purpose-Built Facility, which may utilize area, volume or similar conceptual estimating techniques and including schedules for procurement of long-lead time materials and equipment and cost evaluations of alterative materials and systems (the “Preliminary Construction Budget and Schedule”).
Appears in 3 contracts
Sources: Manufacturing Services Agreement, Manufacturing Services Agreement (Mesoblast LTD), Manufacturing Services Agreement (Mesoblast LTD)