Design Factors. The line shall be considered acceptable when it meets the following requirements: As per the Design Criteria for Transmission Lines set out in Chapter 1, Annex 1 of PR-20, described in subparagraph a).
Appears in 2 contracts
Sources: Concession Contract, Concession Contract