Design Review Notification Clause Samples

Design Review Notification. Transmittal of data packages, including a detailed agenda, to XM and to the Design Review Board members shall constitute design review notification. The data packages and agenda shall be received at XM (ASPO and Headquarters), to Telesat for the ground segment, at least 10 full working days in advance of the scheduled review meeting.
Design Review Notification. Transmittal of the data packages, including a detailed agenda, date, time and location of the review, to INTELSAT and to the Design Review Board members shall constitute design review notification. The data packages and agenda shall be received at INTELSAT (ISPO and HQ) at least two full weeks in advance of the scheduled PDRs and CDRs and at least one full week in advance of the FDRs.
Design Review Notification. 24 3.2.3.3 Data package.................................................24 3.2.3.4 Presentation materials.......................................24 3.2.3.5 Minutes......................................................24 3.2.3.6 Notification of Review Completion............................24 3.2.4 DESIGN REVIEWS BY SUBCONTRACTORS..................................25

Related to Design Review Notification

  • Design Review ‌ (a) Where so specified in Schedule A (Scope of Goods and Services) or as otherwise instructed by the City, the Supplier shall submit design-related Documentation for review by the City, and shall not proceed with work on the basis of such design Documentation until the City’s approval of such Documentation has been received in writing. (b) None of: (i) the submission of Documentation to the City by the Supplier; (ii) its examination by or on behalf of the City; or (iii) the making of any comment thereon (including any approval thereof) shall in any way relieve the Supplier of any of its obligations under this Agreement or of its duty to take reasonable steps to ensure the accuracy and correctness of such Documentation, and its suitability to the matter to which it relates.

  • Project Review A. Programmatic Allowances 1. If FEMA determines that the entire scope of an Undertaking conforms to one or more allowances in Appendix B of this Agreement, with determinations for Tier II Allowances being made by SOI-qualified staff, FEMA shall complete the Section 106 review process by documenting this determination in the project file, without SHPO review or notification. 2. If the Undertaking involves a National Historic Landmark (NHL), FEMA shall notify the SHPO, participating Tribe(s), and the NPS NHL Program Manager of the NPS Midwest Regional Office that the Undertaking conforms to one or more allowances. FEMA shall provide information about the proposed scope of work for the Undertaking and the allowance(s) enabling FEMA’s determination. 3. If FEMA determines any portion of an Undertaking’s scope of work does not conform to one or more allowances listed in Appendix B, FEMA shall conduct expedited or standard Section 106 review, as appropriate, for the entire Undertaking in accordance with Stipulation II.B, Expedited Review for Emergency Undertakings, or Stipulation II.C, Standard Project Review. 4. Allowances may be revised and new allowances may be added to this Agreement in accordance with Stipulation IV.A.3, Amendments. B. Expedited Review for Emergency Undertakings

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Review Scope The parties confirm that the Asset Representations Review is not responsible for (a) reviewing the Receivables for compliance with the representations and warranties under the Transaction Documents, except as described in this Agreement or (b) determining whether noncompliance with the representations and warranties constitutes a breach of the Eligibility Representations. For the avoidance of doubt, the parties confirm that the review is not designed to determine why an Obligor is delinquent or the creditworthiness of the Obligor, either at the time of any Asset Review or at the time of origination of the related Receivable. Further, the Asset Review is not designed to establish cause, materiality or recourse for any Test Fail (as defined in Section 3.05).

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.