Design Reviews Clause Samples

POPULAR SAMPLE Copied 1 times
Design Reviews. The Professional shall provide typewritten responses to all Design Development design review comments provided by the Owner and the Owner’s Consultants.
Design Reviews. 4.2.1 The Design-Builder shall provide three (3) design submissions corresponding to the following levels of design development: "Schematic Design" (30 percent), "Design Development” (65 percent), and "Construction Documents" (90 percent). If the project is phased, three (3) separate submissions shall be made for each phase. As part of its review, the City will offer submission reviews to code officials. 4.2.2 The City's review and acceptance of any design submission, including "Construction Documents", shall not relieve the Design-Builder of its responsibility to meet the requirements of the RFP and its Proposal. The existence (or not) of E&O Insurance (Project Professional Liability Insurance) shall in no way limit the Design-Builder's responsibilities under the contract, including responsibility for design errors or omissions.
Design Reviews. The following Technical Design Reviews (TDR) will be completed by Cordis for the carotid stent delivery system catalogs with 57cm length project: • Design Review I: Combined Design Input, Concept Selection and Planning & Design Output Technical Design Review (Prototypes testing completed) • Design Review II: Combined Verification/Validation and Design and Technology Transfer Technical Design Review (DV/PQ Report approved) Evidence of completion of these design reviews will be documented as required per Cordis Quality System. A Clinical Readiness Design Review is responsibility of SRM and will not be documented in the Cordis Quality System.
Design Reviews. The contractor shall provide support for the Army Range Modernization Program (AMRP) and document in the AMRP. The contractor shall comply with Army standard range designs by participating in design reviews and inspections of construction and installation of targetry and instrumentation. The contractor shall provide a trip report in accordance with TCM-Ranges standards within five (5) working days upon return from or participation in design review conferences, working groups, or program management reviews. After review by TCM-Ranges, the contractor shall post relevant information on the MILCON Dashboard and SRP Range Modernization Shared Drive. The contractor shall notify the SRP Team of any deviations to the standard or of any program risks.
Design Reviews. ‌ Developer’s time and cost impacts of revisions arising from IFA’s participation in Design Reviews or caused by Developer’s noncompliance with the PPA Documents requirements shall be borne by Developer and shall not form the basis of a Relief Event.
Design Reviews. Preliminary Design Reviews (PDRs) and Critical Design Reviews (CDRs) shall be conducted at the spacecraft system level. Each design review shall be comprehensive, critical audit of the design. The design review program shall not only encompass a thorough review of new hardware designs and modified designs, but shall also take into account those existing qualified designs that will result in the achievement of the XM performance and environmental requirements. Without relieving the Contractor of its responsibilities for efforts under the Contract, the XM Project Manager will co-chair system level design reviews. The Contractor shall provide the logistics for these reviews, shall make the review presentations, and shall provide required documentation as described within the CDRL. The Contractor shall compile and maintain a uniform program listing of all action items. The status of these action items shall be tracked through closure.
Design Reviews. The Supplier must carry out design reviews at specified intervals. In these design reviews, the development result will be systematically analyzed to determine whether it meets the requirements defined (see 5.4). The design review procedure will be agreed between the Supplier and Oerlikon. If necessary, Oerlikon participates in the design reviews. ▇▇▇▇▇▇▇▇ expects a short comprehensible presentation of the design review results from the Supplier.
Design Reviews. Der Lieferant muss zu festgelegten Zeitpunkten Design Reviews durchführen. In den Design Reviews wird das vorliegende Entwicklungsergebnis systematisch daraufhin analysiert, wieweit es die definierten Anforderungen (siehe 5.4) erfüllt. Die Vorgangsweise bei Design Reviews wird zwischen dem Lieferanten und Oerlikon abgestimmt. Falls erforderlich, nimmt Oerlikon teil. Oerlikon erwartet vom Lieferanten eine kurze, nachvollziehbare Präsentation der Ergebnisse der Design Reviews.
Design Reviews. Preliminary Design Reviews (PDRs) and Critical Design Reviews (CDRs) shall be conducted at the spacecraft system level. Each design review shall be comprehensive, critical audit of the design. The design review program shall not only encompass a thorough review of new hardware designs and modified designs, but shall also take into account those existing qualified designs that will result in the achievement of the XM performance and environmental requirements. Without relieving the Contractor of its responsibilities for efforts under the Contract, the XM Project Manager will co-chair system level design reviews. The Contractor shall provide the logistics for these reviews, shall make the review presentations, and shall provide required documentation as described within the CDRL. The Contractor shall compile and maintain a uniform program listing of all action items. The status of these action items shall be tracked through closure. 3.2.1 SPACECRAFT PRELIMINARY DESIGN REVIEW (SPDR) The purpose of the SPDR is to allow XM and the Contractor to confirm the baseline concept, configuration, specifications, and preliminary design of spacecraft system. The design review package shall be submitted in accordance with the CDRL. XM shall have the right to approve the review including completion of the review, review meeting minutes, and Major Action Item responses. XM PROPRIETARY EXHIBIT B REV B 21 0F 88 ***** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. The SPDR shall comprise a comprehensive review of the requirements for the spacecraft and their flowdown to the major subsystems, particularly the communications payload. Also to be covered, shall be the identification of new items to be developed or items to be modified in order to meet requirements of the Contract. A comparison of specified and expected performance for the communications payload (repeater and antennas) shall be reviewed. An analysis of [***] shall be presented. A [***] shall be reviewed. The Contractor shall review and present the requirements on the spacecraft control equipment (ground segment hardware and software) and shall describe the operations concept. 3.2.2 SPACECRAFT CRITICAL DESIGN REVIEW (SCDR) The purpose of the SCDR is to allow XM and the Contractor to confirm the adequacy of the spacecraft system design, system performance, and system tes...
Design Reviews. The following reviews shall be conducted during the course of the development contract: