Design Review. DRPT will design and aesthetically treat any elements of the Project, as illustrated in Appendix A, introduced into NPS-administered properties to be compatible with the character of existing resources and appropriate for the context of Washington DC’s Monumental Core a. Minimization: Design review will be executed to minimize potential adverse effects of introducing new features into the historic districts. b. DRPT, in consultation with FRA, will consult with DC SHPO, VDHR, NPS, NCPC and CFA pursuant to Stipulation III.A as engineering and design are progressed including final engineering and design documents. Design Review will address, but is not limited to the following unresolved design elements: a) new railroad bridge design and engineering, including structure type, vertical clearance, visual appearance of the structural system, and alignment; b) aesthetic treatment of new component bridges or other structures introduced into NPS-administered properties; c) landscape design within the limits of disturbance of the Project; d) any additional signage or lighting necessitated by the Project; e) design of the bike-pedestrian crossing and any associated access ramps and trail connections; and f) construction staging and access procedures.
Appears in 3 contracts
Sources: Programmatic Agreement, Programmatic Agreement, Programmatic Agreement