Common use of Detailed Design Specifications Clause in Contracts

Detailed Design Specifications. Consultant shall develop specifications using the City's Division 0 and Division 1 templates and Construction Specifiers Institute (“CSI”) Master format 2004. Consultant shall provide technical specifications for the Project elements for which City does not maintain its own version. If Consultant utilizes Master format 2010, the specifications utilized shall be formatted to the extent practicable to conform into a unified document. Consultant shall develop a series of sample commissioning (also referred to as “acceptance”) test forms to be incorporated into the general contractor’s functional (also referred to as “start- up”) testing and acceptance testing plan. These tests shall be performed by the Project’s general contractor to demonstrate that the installed equipment and systems meet the specified performance requirements and that all electrical and control systems operate as designed. A draft of the proposed commissioning tests shall be submitted with the 60% design review package. The final commissioning tests shall be submitted with the 90% design review package.

Appears in 2 contracts

Sources: Consultant Agreement, Consultant Agreement Amendment

Detailed Design Specifications. Consultant shall develop specifications using the City's Division 0 and Division 1 templates and Construction Specifiers Institute (“CSI”) Master format 2004. Consultant shall provide technical specifications for the Project elements for which City does not maintain its own version. If Consultant utilizes Master format 2010, the specifications utilized shall be formatted to the extent practicable to conform into a unified document. Consultant shall develop a series of sample commissioning (also referred to as “acceptance”) test forms to be incorporated into the general contractor’s functional (also referred to as “start- start-up”) testing and acceptance testing plan. These tests shall be performed by the Project’s general contractor to demonstrate that the installed equipment and systems meet the specified performance requirements and that all electrical and control systems operate as designed. A draft of the proposed commissioning tests shall be submitted with the 60% design review package. The final commissioning tests shall be submitted with the 90% design review package.

Appears in 1 contract

Sources: Consultant Agreement Amendment