SBB Exercise Room Code Review Sample Clauses

SBB Exercise Room Code Review a. Draft Technical Memorandum (TM) provided in an electronic editable file format within five
SBB Exercise Room Code Review. The Consultant shall review record drawings of the Secondary Blower Building (SBB) to conduct a code review and identify any code deficiencies arising from the change in occupancy from an Operator’s Station to an Exercise Room. Code review and identyfing any code deficinces should include: 1. Code review performed by Consultant’s architectural, structural, mechanical, and electrical teams. 2. Any code deficiencies noted shall be based on the building and construction codes issued by the California Building Standards Commission in effect at the time of the change in occupancy. 3. Consultant shall note any code deficiencies of the construction against proposed use as an Exterise Room referenced to the current building and construction codes. 4. Deficiencies notes shall be based on the building and construction codes referenced in the San ▇▇▇▇ Municipal Code, as of the date of adoption of the amendment. ‘Record Drawings’ shall refer to the drawings for the SBB provided by the City in the following project drawing sets: 1. 1961 Sewage Treatment Works Improvements - Division B. 2. Water Pollution Control Plant, 1970 Additions – Division B

Related to SBB Exercise Room Code Review

  • Programming Phase Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Period of Exercise This Warrant is exercisable at any time or from time to time on or after the date on which this Warrant is issued and delivered pursuant to the terms of the Securities Purchase Agreement and before 6:00 p.m., New York, New York time on the fifth (5th) anniversary of the date of issuance (the "Exercise Period").

  • Optional Daily Usage File (ODUF 11.1 The Optional Daily Usage File (ODUF) Agreement with terms and conditions is included in this Attachment as Exhibit D. Rates for ODUF are as set forth in Exhibit F of this Attachment. 11.2 BellSouth will provide ODUF service upon written request to its Account Manager stating a requested activation date.

  • Total Payments to Other Dist & Govt Units Tuition (In State) 2500 2600 2600 2900 2000 3000 4000 4100 4200 4300 4000 5000 5100 5200 5000 6000

  • Alternate Work Schedule An alternate work schedule is any work schedule where an employee is regularly scheduled to work five (5) days per week, but the employee’s regularly scheduled two (2) days off are NOT Saturday and Sunday.