Common use of Detailed Scope of Work Clause in Contracts

Detailed Scope of Work. ▇▇▇▇ as detailed in Clause No.2 above and others as required shall have to be engaged by the Contractor for the works as detailed below subject to stipulation in BOQ. a. Excavation of soil (all kinds and at all levels) and / or rock (all kinds, all strata and at all levels) from Company’s land and / or from the land (arranged by the Company) at all depth as decided by EIC. b. Necessary preparation of site and drilling holes to facilitate blasting (spacing and size of drilled holes shall be in consultation with Management’s representatives on day to day basis so as to avoid dispute on fragmentation of rock) in all soil and all rock strata. The agency will be responsible for drilling in all gradient / terrain and stemming during charging of explosives as per requirement. c. Facilitating blasting as described at 3 above. d. Loading the excavated spoils into dumper / tipping truck (size of such tipping tuck / dumper shall be as per Bid Document or as decided by Management to limit pollution level). e. Transporting, unloading and dumping the spoils on dump site or on the land arranged by the Management / existing dump(s) and spreading or simultaneous dumping and spreading in layers for filling de-coaled area(s) or subsided area(s) by mechanical means. f. Necessary drilling to facilitate blasting (spacing and size of drilled holes shall be in consultation with Management’s representative on day to day basis so as to avoid dispute) in coal strata, if applicable. The agency will be responsible for drilling in all gradient / terrain and stemming during charging of explosives as per requirement. g. Winning and extraction of coal from all strata, using conventional technology such as use of excavator / drill etc. (capacity and size shall be as per Bid Document or as decided by Management to maintain targeted production within specified time period) as per provision of BOQ. h. Facilitating blasting as described at 3 above. i. Winning and extraction of coal using Surface Miner from all strata (capacity and size of Surface Miner shall be as per Bid Document or as decided by Management to maintain targeted production within specified time period) as per provision of BOQ. j. Loading of coal into tipper / dumper, its transportation and unloading at the destination fixed by the EIC and stacking properly. k. Loading into wagons by Pay Loader (as per provision of BOQ). l. Making and maintaining haul roads, access roads. In case of existing mines where haul road already exists, maintenance of the same shall be within the Scope of work. m. Back filling the coal faces after completing extraction of entire coal by way of re- handling of excavated dumped spoil (soil & rock) laid in layers and compacted only when specified in BOQ. n. De-watering, drainage arrangement and quarry lighting as long as required for the entire execution / operation of the work including at the coal benches (if specified in the BOQ). The Contractor will have to provide required pumping arrangement along with piping. o. Dust suppression by spraying water at workings as well as haul roads / roads. p. All other miscellaneous works for completion of the items of works as per BOQ.

Appears in 4 contracts

Sources: Service Level Agreement, Service Level Agreement, Service Level Agreement