Common use of Dismantling of structures Clause in Contracts

Dismantling of structures. The Contractor shall at its own cost dismantle the structures in the acquired lands including those on patta lands, abadi lands, assigned lands, etc. the compensation for which, was paid by the Authority to the land owners and the lands were handed over to the Contractor as per Schedule B-I. The Contractor shall, at its own cost, dispose of the dismantled material in its sole discretion as deemed appropriate, while complying with all environmental guidelines and regulations and clear the Site for undertaking construction. In the event of any delay in dismantling of structures thereof for reasons beyond the control of the Contractor, the Contractor shall be entitled to Damages in a sum calculated in accordance with the formula specified in Clause 8.3 (i) for the period of delay, and to the Time Extension in accordance with Clause 10.5 for and in respect of the part(s) of the Works affected by such delay; provided that if the delays Draft Contract AgreementPage 61 of 155 Construction of Balance Work of 2 Lane with Paved Shoulders of Joram-Koloriang road (NH 713) on EPC basis from existing Km 138.00 to Km 158.000 (Design Km 122.353 to Km 138.389)[Design length-16.036 Km] in the State of Arunachal Pradesh under SARDP-NE Aug. 2021 involve any time overlaps, the overlaps shall not be additive.

Appears in 1 contract

Sources: Construction Contract

Dismantling of structures. The Contractor shall at its own cost dismantle the structures in the acquired lands including those on patta lands, abadi lands, assigned lands, etc. the compensation for which, was paid by the Authority to the land owners and the lands were handed over to the Contractor as per Schedule B-I. The Contractor shall, at its own cost, dispose of the dismantled material in its sole discretion as deemed appropriate, while complying with all environmental guidelines and regulations and clear the Site for undertaking construction. In the event of any delay in dismantling of structures thereof for reasons beyond the control of the Contractor, the Contractor shall be entitled to Damages in a sum calculated in accordance with the formula specified in Clause 8.3 (i) for the period of delay, and to the Time Extension in accordance with Clause 10.5 for and in respect of the part(s) of the Works affected by such delay; provided that if the delays Draft Contract AgreementPage 61 58 of 155 Construction of Balance Work of 150 Rehabilitation and Up-gradation to 2 Lane lane with Paved Shoulders shoulder of JoramNH-717A in Ranipool-Koloriang road Pakyong section from Design CH: 2.00 to CH: 6.00 (NH 713) on EPC basis from existing Km 138.00 3.100 to Km 158.000 (Design Km 122.353 to Km 138.389)[Design length-16.036 Km] 7.200 of NH-717A) in the State of Arunachal Pradesh under SARDP-NE Aug. Sikkim on EPC Mode Feb. 2021 involve any time overlaps, the overlaps shall not be additive.

Appears in 1 contract

Sources: Contract Agreement