Disposal System Sample Clauses

Disposal System. Collectively, the Gathering System and the Disposal ▇▇▇▇▇.
Disposal System. All of those facilities, improvements and equipment at the Landfill site and all transfer stations within County designed to collect, manage and dispose of Solid Waste and the land, structures, vehicles and equipment for use in connection therewith.
Disposal System. All facilities and/or locations owned or leased by the 95 Authority, or with respect to which the Authority otherwise maintains a contractual/commercial 96 relationship, for the collection, management, processing and/or disposal of Solid Waste, 97 including, but not necessarily limited to, the Regional Landfill, all Delivery Points, the 98 Applicable Disposal Mechanism(s) and all vehicles owned or leased by the Authority.

Related to Disposal System

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and (c) internal quality audit system. The Authority’s Engineer shall convey its approval to the Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality Assurance Plan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by the Contractor.

  • CONTROL SYSTEM (a) SELLER shall provide and maintain a quality control system to an industry recognized Quality Standard and in compliance with any other specific quality requirements identified in this Contract. (b) Records of all quality control inspection work by SELLER shall be kept complete and available to LOCKHEED ▇▇▇▇▇▇ and its customers.

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

  • Capital Equipment Collaborator’s commitment, if any, to provide ICD with capital equipment to enable the research and development activities under the Research Plan appears in Appendix B. If Collaborator transfers to ICD the capital equipment or provides funds for ICD to purchase it, then ICD will own the equipment. If Collaborator loans capital equipment to ICD for use during the CRADA, Collaborator will be responsible for paying all costs and fees associated with the transport, installation, maintenance, repair, removal, or disposal of the equipment, and ICD will not be liable for any damage to the equipment.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.