Documents at Project Site Clause Samples

Documents at Project Site. Contractor shall maintain at its office at the Project Site, for Owner's benefit and review, one record copy of the Drawings and Specifications, Change Orders and other modifications to the Contract Documents, in good order, and marked currently to record changes and selections made during construction. Promptly after execution of the Contract Documents, Contractor shall prepare an initial set of drawings and specification for the Project for Owner's review and comment. After receipt of Owner's comments, Contractor shall promptly prepare the final Drawings and Specifications incorporating such comments, to the extent such comments will not cause a failure to meet the Completion Requirements and Performance Requirements. By submission of the final Drawings and Specifications to the Owner, Contractor represents and warrants to Owner that the Project can be constructed and installed in accordance with the Drawings and Specifications to meet or exceed the Completion Requirements and the Performance Requirements.
Documents at Project Site. TEPPCO shall maintain or cause to be maintained at Contractor's offices, for review by each of the Contracting Shippers, one record copy of the Drawings and Specifications, Change Orders and other modifications to the Contract Documents, in good order, and marked currently to record changes and selections made during construction. Promptly after the execution of the Agreement, TEPPCO shall prepare or cause to be prepared an initial set of drawings and specifications for the Project for Contracting Shippers' collective review and comment. After receipt of Contracting Shippers' collective comments, TEPPCO shall promptly prepare, or caused to be prepared, the Drawings and Specifications incorporating such comments as a appropriate. By submission of the final Drawings and Specifications to the Parties, TEPPCO represents to each of the Contracting Shippers that the Project can be constructed and installed in accordance with the Drawings and Specifications to meet or exceed the Completion Standards and the Performance Standards. Contracting Shippers shall furnish TEPPCO with certain documents prepared by them. TEPPCO and its Contractor shall thoroughly review such documentation. Any preliminary drawings, design guidelines, schematics, equipment lists, budgets, accounting information, reports, surveys, specifications and other documents contained in the documentation furnished by Contracting Shippers are furnished solely for TEPPCO's general information and convenience. TEPPCO shall be responsible for the design and construction of a complete Pipeline System, which shall deliver Products in accordance with the requirements of the Agreement. Any furnishing by Contracting Shippers of design information which is utilized by TEPPCO in its sole discretion, and the review by Contracting Shippers of the Drawings and Specifications shall not in any way relieve TEPPCO of its responsibilities under the Agreement.

Related to Documents at Project Site

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Construction Contract Documents The Construction Contract Documents shall consist of the plans and specifications prepared by the Engineer, and any addenda and change orders thereto, and the Owner-Contractor Agreement, all of which shall be compatible and consistent with this Agreement.

  • Construction Contracts Item A: Enter the total dollar amount of all contacts awarded on the project/ program. Item B: Enter the total dollar amount of contracts connected with this project/program that were awarded to Section 3 businesses.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Contractor’s Documents Any licensing and maintenance agreement, or any order-specific agreement or document, including any pre-installation, linked or “click through” agreement that is allowed by, referenced within or incorporated within the Contract whenever the Contract is used for a State procurement, whether directly by the Contractor or through a Contractor’s agent, subcontractor or reseller, is agreed to only to the extent the terms within any such agreement or document do not conflict with the Contract or applicable Minnesota or Federal law, and only to the extent that the terms do not modify, diminish or derogate the terms of the Contract or create an additional financial obligation to the State. Any such agreement or document must not be construed to deprive the State of its sovereign immunity, or of any legal requirements, prohibitions, protections, exclusions or limitations of liability applicable to this Contract or afforded to the State by Minnesota law. A State employee’s decision to choose “accept” or an equivalent option associated with a “click- through” agreement does not constitute the State’s concurrence or acceptance of terms, if such terms are in conflict with this section.