Drawings and Technical Documents Clause Samples

The "Drawings and Technical Documents" clause defines the requirements and responsibilities related to the preparation, submission, and use of technical drawings and documentation in a project. Typically, this clause specifies which party must provide detailed plans, diagrams, and specifications, outlines the standards these documents must meet, and sets procedures for review, approval, and revisions. For example, a contractor may be required to submit shop drawings for approval before commencing certain works. The core function of this clause is to ensure that all technical information is clearly communicated and agreed upon, reducing the risk of misunderstandings and errors during project execution.
POPULAR SAMPLE Copied 1 times
Drawings and Technical Documents. All drawings and technical documents delivered by either of the Parties to the other Party remain the property of the delivering Party, and the receiving Party may not improperly use, reproduce, or otherwise disclose such materials to third parties. Tooling, setup, drawing, design information and partial preparation charges, when invoiced to Buyer, cover only part of the cost thereof of Seller. Buyer does not acquire any right, title or interest in any tooling, setup, drawings, design information, or invention resulting there from. All drawings, techniques, inventions or improvements (whether or not patentable) made or conceived in the course of fulfilling any order, including any intellectual property rights pertaining thereto, shall be the sole property of Seller.
Drawings and Technical Documents. 3.1. Unless otherwise agreed upon, brochures and catalogues shall not be binding. Data provided in technical documents shall be binding only to the extent as expressly stipulated. 3.2. SEALPAC retains all rights to drawings and technical documents provided to the customer. The customer recognizes these rights and shall neither make the documents available to any third party nor use the documents for purposes other than those for which they were handed over. 3.3. SEALPAC shall not disclose to a third party any documents and drawings submitted by the customer and designated as confidential. SEALPAC shall, however, not be prevented from using, or developing ideas, concepts or specialised knowledge or to impart knowledge thereof to third parties, provided that such ideas, concepts and knowledge have resulted from the fulfilment of the contract and relate to methods of application processes or such like, unless there is a prior agreement in place to the contrary. This applies particularly to procedures and applications in area of packaging technology. 3.4. Any drawings and technical documents provided to the customer by SEALPAC are to be returned spontaneously and without delay to SEALPAC if no contract is ultimately concluded. 3.5. The customer shall, at the latest within 14 days after conclusion of the contract pursuant to Clause 1.1, draw the attention of SEALPAC to the safety regulations and standards applicable to the execution of the supplies and services in the country of destination (such as, for example, to any installation work), to the operation of the plant as well as the health and safety of personnel.
Drawings and Technical Documents. All drawings and technical documents relating to the Product or its manufacturer submitted by one party to the other, prior or subsequent to the formation of the Agreement, shall remain the property of the submitting party. Unless expressly stated in the Agreement, SANOVO and its suppliers maintain all intellectual property rights to the Products. Drawings, technical documents or other technical information received by one party shall not, without the consent of the other party, be used for any other purpose than that for which they were provided. They may not, without the consent of the submitting party, otherwise be used or copied, reproduced, transmitted or communicated to a third party.
Drawings and Technical Documents. 3.1 Unless otherwise agreed, brochures and catalogues shall not be binding. Data provided in technical documents are only binding in so far as having been expressly stipulated as such. 3.2 Each party to the contract retains all rights to technical documents provided to the other. The party receiving such documents recognis- es these rights and shall not - without previous written consent of the other party - make these documents available to any third party, ei- ther in whole or in part, nor use them for purposes other than those for which they were handed over.
Drawings and Technical Documents. All drawing and technical documents delivered by either of the parties to the other party remain the property of the delivering party, and the receiving party may not improperly use, reproduce, or otherwise disclose such materials to third parties.
Drawings and Technical Documents. The delivery time is reasonably extended:

Related to Drawings and Technical Documents

  • Technical Documentation Prior to commencement of the Tests on Completion, the Contractor shall supply to the Engineer the technical documentation as specified in the Employer’s Requirements. The Works or Section shall not be considered to be completed for the purposes of taking- over under sub-clause 10.1 [Taking Over of the Works and Sections] until the Engineer has received the technical documentation as defined in this sub-clause 5.7, the "history file" including design calculations and certain certification as well as any other documents required to meet the CE Marking requirements.

  • Design Development Documents See Section 2, Part 1, Article 2.1.5.

  • Shop Drawings and Samples After checking and verifying all field measurements, the CM will submit to the AE and Owner for approval, in accordance with the acceptable schedule of Shop Drawing submission, five copies of all Shop Drawings, which shall have been checked by and stamped with the approval of the CM and identified as the AE may require. The data shown on the Shop Drawings will be complete with respect to dimensions, design criteria, materials of construction and the like to enable the AE to review the information as required. The CM will also submit to the AE for approval with such promptness as to cause no delay in the Work, all samples required by the Contract Documents. All samples will have been checked by and stamped with the approval of the CM, identified clearly as to material, manufacturer, any pertinent numbers and the use for which intended. (a) At the time of each submission, the CM will in writing call the AE's attention to any deviations that the Shop Drawing or sample may have from the requirements of the Contract Documents and, in addition, shall cause a specific notation to be made on each shop drawing submitted for review and approval of each such variation. The AE will review and approve with reasonable promptness Shop Drawings and Samples, but its review and approval shall be only for conformance with the design concept of the PROJECT and for compliance with the information given in the Contract Documents. The approval of a separate item as such will not indicate approval of the assembly in which the item functions. The CM will make any corrections required by the AE and will return the required number of corrected copies of Shop Drawings and resubmit new samples until approved. All cost incurred for the resubmitted shop drawing shall be the CM responsibility. The CM's stamp of approval on any Shop Drawing or sample shall constitute a representation to the AE that the CM has either determined and verified all quantities, dimensions, field construction criteria, materials, catalog numbers and similar data or he assumes full responsibility for doing so, and that he has reviewed or coordinated each Shop Drawing or sample with the requirements of the Work and the Contract Document. No work requiring a Shop Drawing or sample submissions shall be commenced until the submission has been approved by the AE. Any related work performed prior to review and approval by the Owner of the pertinent submission will be sole expense and responsibility of the CM. A copy of each approved Shop Drawing and each approved sample shall be kept in good order by the CM at the site and shall be available to the AE. The AE approval of Shop Drawings or samples shall not relieve the CM from his responsibility for any deviations from the requirements of the Contract Documents, unless the CM has in writing called the AE's attention to such deviation at the time of submission and the Owner and the AE have given written approval to the specific deviation; or shall any approval by the AE relieve the CM from responsibility for errors or omissions in the Shop Drawings.

  • Design Documents Prepare and submit the following documents to the DAS - Records Management Office with a copy of the transmittal letter submitted to the respective Project Manager: 1. City/State Approved Drawings (1) Original set 2. Bid Set Drawings (1) Set BOND PAPER (marked as “ORIGINAL”) (1) Set electronic file (DWG & PDF) 3. Project Manual (1) Set hard copy & Detail Manual (1) Set electronic file

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents. 9.2 Materials or Work described in words that so applied have a well-known technical or trade meaning shall be deemed to refer to recognized standards, unless noted otherwise. 9.3 Trade Name or Trade Term It is not the intention of the Contract Documents to go into detailed descriptions of any materials and/or methods commonly known to the trade under “trade name” or “trade term.” The mere mention or notation of “trade name” or “trade term” shall be considered a sufficient notice to Developer that it will be required to complete the work so named, complete, finished, and operable, with all its appurtenances, according to the best practices of the trade. 9.4 The naming of any material and/or equipment shall mean furnishing and installing of same, including all incidental and accessory items thereto and/or labor therefor, as per best practices of the trade(s) involved, unless specifically noted otherwise. 9.5 Contract Documents are complementary, and what is called for by one shall be binding as if called for by all. As such, Drawings and Specifications are intended to be fully cooperative and to agree. However, if Developer observes that Drawings and Specifications are in conflict with the Contract Documents, Developer shall promptly notify District and Architect in writing, and any necessary changes shall be made as provided in the Contract Documents. 9.6 Figured dimensions shall be followed in preference to scaled dimensions, and Developer shall make all additional measurements necessary for the work and shall be responsible for their accuracy. Before ordering any material or doing any work, each Developer shall verify all measurements at the building and shall be responsible for the correctness of same. 9.7 Should any question arise concerning the intent or meaning of the Contract Documents, including the Plans and Specifications, the question shall be submitted to the District for interpretation. If a conflict exists in the Contract Documents, these Construction Provisions shall control over the Facilities Lease, which shall control over the Site Lease, which shall control over Division 1 Documents, which shall control over Division 2 through Division 49 documents, which shall control over figured dimensions, which shall control over large-scale drawings, which shall control over small-scale drawings. In no case shall a document calling for lower quality and/or quantity of material or workmanship control. However, in the case of discrepancy or ambiguity solely between and among the Drawings and Specifications, the discrepancy or ambiguity shall be resolved in favor of the interpretation that will provide District with the functionally complete and operable Project described in the Drawings and Specifications. 9.8 Drawings and Specifications are intended to comply with all laws, ordinances, rules, and regulations of constituted authorities having jurisdiction, and where referred to in the Contract Documents, the laws, ordinances, rules, and regulations shall be considered as a part of the Contract Documents within the limits specified. 9.9 As required by Section 4-317(c), Part 1, Title 24, CCR: “Should any existing conditions such as deterioration or non-complying construction be discovered which is not covered by the DSA-approved documents wherein the finished work will not comply with Title 24, California Code of Regulations, a construction change document, or a separate set of plans and specifications, detailing and specifying the required repair work shall be submitted to and approved by DSA before proceeding with the repair work.”