DS1 Loops. In accordance with Rule 51.319(a)(4)(i), SBC shall provide CLEC, upon CLEC’s request, with nondiscriminatory access to DS1 Loops on an unbundled basis to any building not served by (a) a Wire Center with at least 60,000 business lines and (b) at least four fiber-based collocators. Once the wire center meets the requirements of Section 4.0 and the Wire Center exceeds both of these thresholds, no future DS1 Loop unbundling will be required of SBC in that Wire Center, except as otherwise set forth in this Attachment. 3.1.2.1 In accordance with Rule 51.319(a)(4)(ii), SBC is not obligated to provision to CLEC more than ten unbundled DS1 Loops to any single Building in which DS1 Loops are available as unbundled Loops.
Appears in 1 contract
Sources: Interconnection Agreement
DS1 Loops. In accordance with Rule 51.319(a)(4)(i), SBC shall provide CLEC, upon CLEC’s request, with nondiscriminatory access to DS1 Loops on an unbundled basis to any building Building not served by (a) a Wire Center wire center with at least 60,000 business lines and (b) at least four fiber-based collocators. Once the wire center meets the requirements of Section 4.0 and the Wire Center wire center exceeds both of these thresholds, no future DS1 Loop unbundling in accordance with Section 251 will be required of SBC in that Wire Centerwire center, except as otherwise set forth in this Attachment.
3.1.2.1 Where DS3 Loops are not available under the Agreement as Section 251 unbundled network elements, then in In accordance with Rule 51.319(a)(4)(ii), SBC is not obligated to provision to CLEC more than may obtain a maximum of ten unbundled DS1 Loops to any single Building in which DS1 Loops are available as Section 251 unbundled Loops.
Appears in 1 contract
Sources: Interconnection Agreement
DS1 Loops. In accordance with Rule 51.319(a)(4)(i), SBC shall provide CLEC, upon CLEC’s request, with nondiscriminatory access to DS1 Loops on an unbundled basis to any building Building not served by (a) a Wire Center wire center with at least 60,000 business lines and (b) at least four fiber-based collocators. Once the wire center meets the requirements of Section 4.0 and the Wire Center wire center exceeds both of these thresholds, no future DS1 Loop unbundling in accordance with Section 251 will be required of SBC in that Wire Centerwire center, except as otherwise set forth in this Attachment.
3.1.2.1 In accordance with Rule 51.319(a)(4)(ii), SBC is not obligated to provision to CLEC more than may obtain a maximum of ten unbundled DS1 Loops to any single Building in which DS1 Loops are available as Section 251 unbundled Loops.
Appears in 1 contract
Sources: Interconnection Agreement