Early estimates Sample Clauses

Early estimates. The Tables 5 and 6 specify early estimates required for arable crops (Table 5) and vegetables and fruits (Table 6). Common wheat and spelt - x x x x Common winter wheat and spelt x x x x x Common spring wheat and spelt - x x x x Durum wheat x x x x x Rye and winter cereal mixtures (maslin) x x x x x Barley - x x x x Winter barley x x x x x Spring barley - x x x x Oats - x x x x Spring cereal mixtures (mixed grain other than maslin) - x x x x Grain maize and corn-cob-mix - x x x x Triticale x x x x x Sorghum - x x x x Rice x x x x x Field peas - x x - x Broad and field beans - x x - x Sweet lupines - x x - x Potatoes (including seed potatoes) - x x - x Sugar beet (excluding seed) - x x - x Rape and turnip rape seeds - x x x x Winter rape and turnip rape seeds x x x x x Sunflower seed - x x - x Soya - x x - x Linseed (oil flax) - x x - x Green maize - x x - x Tomatoes x x x Apples x x x Pears x x x Peaches x x x Nectarines x x x Oranges x x x Clementines x x x Olives for oil x x x Detailed descriptions of crop variables are included in the Annual Crop Statistics Handbook, rev. 2015 and hereafter in the yearly updates of the Annual Crop Statistics Handbook.

Related to Early estimates

  • Cost Estimates If this Agreement pertains to the design of a public works project, CONSULTANT shall submit estimates of probable construction costs at each phase of design submittal. If the total estimated construction cost at any submittal exceeds the CITY’s stated construction budget by ten percent (10%) or more, CONSULTANT shall make recommendations to CITY for aligning the Project design with the budget, incorporate CITY approved recommendations, and revise the design to meet the Project budget, at no additional cost to CITY.

  • USE OF ESTIMATES The Sponsor is authorized to make all Net Asset Value determinations (including, without limitation, for purposes of determining redemption payments and calculating Sponsor’s Fees) on the basis of estimated numbers. The Sponsor shall not (unless the Sponsor otherwise determines) attempt to make any retroactive adjustments in order to reflect the differences between such estimated and the final numbers, but rather shall reflect such differences in the Accounting Period in which final numbers become available. The Sponsor also shall not (unless the Sponsor otherwise determines) revise Sponsor’s Fee calculations to reflect differences between estimated and final numbers (including differences which have resulted in economic benefit to a Sponsor Party). If, after payment of redemption proceeds, the Sponsor determines that adjustment to the Net Asset Value of the redeemed Units is necessary, the redeeming Investor (if the Net Asset Value is adjusted upwards) or the remaining Investors (if the Net Asset Value is adjusted downwards) will bear the risk of such adjustment. The redeeming Investor will neither receive further distributions from, nor will it be required to reimburse, this FuturesAccess Fund in such circumstances.

  • Estimates and Reconciliation of Estimates Where estimated expenditures are used to determine the amount of the drawdown, the State will indicate in the terms of the State unique funding technique how the estimated amount is determined and when and how the State will reconcile the difference between the estimate and the State's actual expenditures.

  • Cost Estimate The cost estimate shall set out the estimated costs for the proposed Change Order in such a way that a fair evaluation can be made. It shall include a breakdown for labor, materials, equipment and markups for overhead and profit, unless TxDOT agrees otherwise. If the work is to be performed by Subcontractors and if the work is sufficiently defined to obtain Subcontractor quotes, DB Contractor shall obtain quotes (with breakdowns showing cost of labor, materials, equipment and markups for overhead and profit) on the Subcontractor’s stationery and shall include such quotes as back-up for DB Contractor’s estimate. No markup shall be allowed in excess of the amounts allowed under Section 10.6. DB Contractor shall identify all conditions with respect to prices or other aspects of the cost estimate, such as pricing contingent on firm orders being made by a certain date or the occurrence or non-occurrence of an event.

  • Pre-Estimate The parties agree that if Market Quotation applies an amount recoverable under this Section 6(e) is a reasonable pre-estimate of loss and not a penalty. Such amount is payable for the loss of bargain and the loss of protection against future risks and except as otherwise provided in this Agreement neither party will be entitled to recover any additional damages as a consequence of such losses.