Common use of ELECTRICITY CONNECTION Clause in Contracts

ELECTRICITY CONNECTION. 7.2.1 Greensteam shall design and construct or cause to be designed and constructed Electricity lines necessary to transport the Electricity within the Site Boundary from an Aera connection at the Site Boundary, the location of which shall be determined by Aera. Aera shall design and construct the Electricity interconnect facilities to the Site Boundary, for which Greensteam will pay all costs, including design, labor, materials, overhead and Installation. 7.2.2 Greensteam shall be responsible for and shall bear all costs associated with the design, Installation, construction, metering and commissioning of the Electricity line, interconnect and metering facilities within the Site Boundary. Aera shall be responsible for and bear all costs for the operation and maintenance of the Electricity interconnect to the Site Boundary.