Eligible Product Data Sample Clauses

Eligible Product Data. To the extent applicable, Participant shall provide to Program Administrator the Eligible Product Data for each Purchase Agreement upon Program Administrator’s request.
Eligible Product Data. To the extent applicable, Participant shall provide to Program Administrator the information outlined in the table below for each Purchase Agreement (“Eligible Product Data”) within ten (10) business days of Program Administrator’s request therefor. Participant will use commercially reasonable efforts to ensure that the Eligible Product Data is provided in easily readable and text searchable format. Site Audit Audit Form Repair History Within 30 calendar days of performing a repair on each Eligible Product Warranty Claims History Within 30 calendar days of processing a warranty claim for each Eligible Product Purchase/Procurement Purchase order for each Eligible Product, including bill of materials (make, model, source, serial number or manufacturing lot, warranties) Evidence of Stage Completion Photos of Eligible Product upon completion of the applicable Funding Stage; confirmation of delivery of Eligible Product Customer Feedback Any feedback on an Eligible Product from a Customer
Eligible Product Data. To the extent applicable, and in addition to any Eligible Product Data required to be provided under the Loan Addendum, Participant shall provide to Program Administrator the Eligible Product Data outlined in the table below for each Purchase Agreement for a Solar Energy System within ten (10) business days of Program Administrator’s request therefor. Participant will use commercially reasonable efforts to ensure that the Eligible Product Data is provided in easily readable and text searchable format. Sales proposal and assumptions Customer proposal presentation Avoided cost analysis Last 12 months of energy bills Shading analysis Shading metrics document Permitting Preliminary permit Equipment verification Bill of materials / invoice Interconnection Application /signed interconnection agreement Performance estimate and assumptions ▇▇ ▇▇▇▇▇, or equivalent, inputs/outputs Final engineering design Design permit package (site plan, one-line electrical drawings, structural drawings) Finalized drawings As-built drawings Installation Completion Photos of the installation Commissioning Commissioning checklist Monitoring production data Account information to access 15-minute interval data Inspection Final inspection card signed by AHJ Utility authorization Permission to Operate

Related to Eligible Product Data

  • Product Data Illustrations, standard schedules, performance charts, instructions, brochures, diagrams, and other information furnished by Developer to illustrate a material, product, or system for some portion of the Work.

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work. 4.12.2 Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate a material, product or system for some portion of the Work. 4.12.3 Samples are physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged. 4.12.4 The Contractor shall review, approve and submit, with reasonable promptness and in such sequence as to cause no delay in the Work or in the work of the State or any separate contractor, all Shop Drawings, Product Data and Samples required by the Contract Documents. 4.12.5 By approving and submitting Shop Drawings, Product Data and Samples, the Contractor represents that he / she has determined and verified all materials, field measurements, and field construction criteria related thereto, or will do so, and that he / she has checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents. 4.12.6 The Contractor shall not be relieved of responsibility for any deviation from the requirements of the Contract Documents by the Architect's approval of Shop Drawings, Product Data or Samples under Subparagraph 2.2.7 of these General Conditions unless the Contractor has specifically informed the Architect and the State in writing of such deviation at the time of sub- mission and the Architect and the State has given written approval to the specific deviation. The Contractor shall not be relieved from responsibility for errors or omissions in the Shop Drawings, Product Data or Samples by the Architect's approval thereof. 4.12.7 The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data or Samples, to revisions other than those requested by the Architect on previous submittals. 4.12.8 No portion of the Work requiring submission of a Shop Drawing, Product Data or Sample shall be commenced until the submittal has been approved by the Architect as provided in Subparagraph 2.2.7 of these General Conditions. All such portions of the Work shall be in accordance with approved submittals.

  • Product NYISO will provide Energy Resource Interconnection Service and Capacity Resource Interconnection Service to Developer at the Point of Interconnection.

  • Product Labeling The labeling of all Licensed Products sold or offered for sale under this Agreement shall expressly state that the Licensed Product is manufactured under a license from the Medicines Patent Pool.

  • PRODUCT MANUFACTURER'S SUPPLIERS Only those dealers/distributors listed by the manufacturer will be considered authorized to act on behalf of the Product Manufacturer.