Inspections and Tests 26.1 The Supplier shall at its own expense and at no cost to the Procuring Entity carry out all such tests and/or inspections of the Goods and Related Services as are specified in the SCC. 26.2 The inspections and tests may be conducted on the premises of the Supplier or its Subcontractor, at point of delivery, and/or at the Goods' final destination, or in another place in Kenya as specified in the SCC. Subject to GCC Sub-Clause 26.3, if conducted on the premises of the Supplier or its Subcontractor, all reasonable facilities and assistance, including access to drawings and production data, shall be furnished to the inspectors at no charge to the Procuring Entity. 26.3 The Procuring Entity or its designated representative shall be entitled to attend the tests and/or inspections referred to in GCC Sub-Clause 26.2, provided that the Procuring Entity bear all of its own costs and expenses incurred in connection with such attendance including, but not limited to, all travelling and board and lodging expenses. 26.4 Whenever the Supplier is ready to carry out any such test and inspection, it shall give a reasonable advance notice, including the place and time, to the Procuring Entity. The Supplier shall obtain from any relevant third party or manufacturer any necessary permission or consent to enable the Procuring Entity or its designated representative to attend the test and/or inspection. 26.5 The Procuring Entity may require the Supplier to carry out any test and/or inspection not required by the Contract but deemed necessary to verify that the characteristics and performance of the Goods comply with the technical specifications codes and standards under the Contract, provided that the Supplier's reasonable costs and expenses incurred in the carrying out of such test and/or inspection shall be added to the Contract Price. Further, if such test and/or inspection impedes the progress of manufacturing and/or the Supplier's performance of its other obligations under the Contract, due allowance will be made in respect of the Delivery Dates and Completion Dates and the other obligations so affected. 26.6 The Supplier shall provide the Procuring Entity with a report of the results of any such test and/or inspection. 26.7 The Procuring Entity may reject any Goods or any part thereof that fail to pass any test and/or inspection or do not conform to the specifications. The Supplier shall either rectify or replace such rejected Goods or parts thereof or make alterations necessary to meet the specifications at no cost to the Procuring Entity, and shall repeat the test and/or inspection, at no cost to the Procuring Entity, upon giving a notice pursuant to GCC Sub- Clause 26.4. 26.8 The Supplier agrees that neither the execution of a test and/or inspection of the Goods or any part thereof, nor the attendance by the Procuring Entity or its representative, nor the issue of any report pursuant to GCC Sub-Clause 26.6, shall release the Supplier from any warranties or other obligations under the Contract.
Emergency Generator 1) During the Term as it applies to the 9449 Expansion Space, as extended from time to time, Tenant shall have the right to install a supplemental emergency generator (the “Generator”) to provide emergency additional electrical capacity to the 9449 Building. The Generator shall be placed at a location at the 9449 Building designated by Tenant and reasonably approved by Landlord. Notwithstanding the foregoing, Tenant’s right to install the Generator shall be subject to: (i) Landlord’s reasonable approval of the manner in which the Generator is installed, the manner in which any cables are run to and from the Generator to the Premises and the measures that will be taken to eliminate any vibrations or sound disturbances from the operation of the Generator; and (ii) the covenants, conditions and restrictions of record applicable to the Project, architectural review and any necessary approval by the local municipality and county governments or agencies having authority and jurisdiction over such matters. Landlord shall have the right to require Tenant to provide a reasonably acceptable enclosure (e.g. wood fencing and landscaping) to hide or disguise the existence of the Generator and to minimize any adverse effect that the installation of the Generator may have on the appearance of the 9449 Building and Project. Tenant shall be solely responsible for obtaining all necessary governmental and regulatory permits and approvals and for the cost of installing, operating, maintaining, repairing and removing the Generator. Tenant shall also be responsible for the cost of all utilities consumed and utility connections required in the operation of the Generator. 2) Tenant shall be responsible for assuring that the installation, maintenance, repair, operation and removal of the Generator does not damage the 9449 Building or Project and Tenant shall be responsible for any damages caused thereby. For avoidance of doubt, the installation, maintenance, operation, repair or removal of the Generator shall be subject to the indemnity provisions set forth in Section 10.3 of the Lease. 3) Tenant shall be responsible for the installation, operation, repair, cleanliness, maintenance and removal of the Generator and appurtenances, all of which shall remain the personal property of Tenant and shall be removed by Tenant at its own expense as of the 9449 Extended Expiration Date or any earlier expiration or termination of Tenant’s right to possession of the 9449 Expansion Space in accordance with the Lease and this Amendment. Tenant shall repair any damage caused by such removal, including the patching of any holes to match, as closely as possible, the color surrounding the area where the Generator and appurtenances were attached. Such maintenance and operation shall be performed in a manner to avoid any unreasonable interference with any other tenants or Landlord. Tenant agrees to maintain the Generator, including without limitation, any enclosure installed around the Generator, in good condition and repair. Tenant shall be responsible for performing any maintenance and improvements to any enclosure surrounding the Generator so as to keep such enclosure in good condition. 4) Tenant, subject to the reasonable rules and regulations enacted by Landlord, shall have unlimited access to the Generator and its surrounding area for the purpose of installing, operating, repairing, maintaining, using and removing the Generator. 5) Tenant shall only test the Generator before or after normal business hours. 6) Notwithstanding anything in this Amendment or the Lease to the contrary, Tenant may use the Generator for its intended purpose as and when needed (as reasonably determined by Tenant), without any restriction or hindrance from Landlord or any other tenant, subject only to applicable Laws and unreasonable disturbances to other tenants in the Project.
Inspection and Tests 3.8.1 The Procuring entity or its representative shall have the right to inspect and/or to test the goods to confirm their conformity to the Contract specifications. The Procuring entity shall notify the tenderer in writing in a timely manner, of the identity of any representatives retained for these purposes. 3.8.2 The inspections and tests may be conducted in the premises of the tenderer or its subcontractor(s), at point of delivery, and/or at the Goods’ final destination If conducted on the premises of the tenderer or its subcontractor(s), all reasonable facilities and assistance, including access to drawings and production data, shall be furnished to the inspectors at no charge to the Procuring entity. 3.8.3 Should any inspected or tested goods fail to conform to the Specifications, the Procuring entity may reject the equipment, and the tenderer shall either replace the rejected equipment or make alterations necessary to make specification requirements free of costs to the Procuring entity. 3.8.4 The Procuring entity’s right to inspect, test and where necessary, reject the goods after the Goods’ arrival shall in no way be limited or waived by reason of the equipment having previously been inspected, tested and passed by the Procuring entity or its representative prior to the equipment delivery. 3.8.5 Nothing in paragraph 3.8 shall in any way release the tenderer from any warranty or other obligations under this Contract.
Inspection and Testing Each Constructing Entity shall cause inspection and testing of the Interconnection Facilities that it constructs in accordance with the provisions of this section. The Construction Parties acknowledge and agree that inspection and testing of facilities may be undertaken as facilities are completed and need not await completion of all of the facilities that a Constructing Entity is building.
Emergencies 10.3.1 In any emergency affecting the safety of persons or property, the Contractor shall act to prevent threatened damage, injury or loss. Any additional compensation or extension of time claimed by the Contractor on account of emergency work shall be determined as provided in Article 12 for Changes in the Work.