The End-of-Project Assessment clause establishes a formal review process at the conclusion of a project to evaluate its outcomes and overall performance. Typically, this clause requires the parties to meet, discuss deliverables, assess whether objectives were met, and document lessons learned or areas for improvement. Its core function is to ensure accountability, facilitate continuous improvement, and provide a structured opportunity to address any unresolved issues before final project closure.
End-of-Project Assessment. As a part of basic services, the Program Manager shall participate with the Using Agency, the Owner, the Design Professional and the CM/GC in an end-of-project assessment for the benefit of Owner. If Team Evaluation is elected as part of this Contract, all team members agree to participate in good faith in the State of Georgia’s formal Team Evaluation Process [copies of which will be made available to any member on request]. By executing this agreement for program management services with the Owner, the Program Manager waives any and all legal rights for defamation, libel, or slander, and covenants not to ▇▇▇ the Board of Regents, the Owner, the Design Professional, the Using Agency, other team members, and their respective representatives and agents for comments, rankings, and results related to the Program Manager's performance posted in good faith as a part of, and in accordance with, said Team Evaluation Process. The Design Professional and other team members, in their agreements with the Owner, have executed, or will execute, a similar agreement.

Related to End-of-Project Assessment

  • Needs Assessment 1. The Contractor shall conduct a cultural and linguistic group-needs assessment of the eligible client population in the Contractor’s service area to assess the language needs of the population and determine what reasonable steps are necessary to ensure meaningful access to services and activities to eligible individuals. [22 CCR 98310, 98314] The group-needs assessment shall take into account the following four (4) factors: a. Number or proportion of persons with Limited English Proficiency (LEP) eligible to be served or encountered by the program. b. Frequency with which LEP individuals come in contact with the program. c. Nature and importance of the services provided. d. Local or frequently used resources available to the Contractor. This group-needs assessment will serve as the basis for the Contractor’s determination of “reasonable steps” and provide documentary evidence of compliance with Cal. Gov. Code § 11135 et seq.; 2 CCR 11140, 2 CCR 11200 et seq., and 22 CCR98300 et seq. 2. The Contractor shall prepare and make available a report of the findings of the group-needs assessment that summarizes: a. Methodologies used. b. The linguistic and cultural needs of non-English speaking or LEP groups. c. Services proposed to address the needs identified and a timeline for implementation. [22 CCR 98310] 3. The Contractor shall maintain a record of the group-needs assessment on file at the Contractor’s headquarters at all times during the term of this Agreement. [22 CCR 98310, 98313]

  • Joint Assessment If the Premises are not separately assessed, Lessee's liability shall be an equitable proportion of the Real Property Taxes for all of the land and improvements included within the tax parcel assessed, such proportion to be conclusively determined by Lessor from the respective valuations assigned in the assessor's work sheets or such other information as may be reasonably available.

  • Environmental Assessment Buyer shall have the right for a period commencing upon execution of this Agreement by both parties and ending on November 28, 2012, to conduct an environmental assessment of the Assets, at Buyer’s sole risk, liability and expense. Seller shall make available to Buyer, during the environmental assessment period described above, Seller’s historical files regarding prior operations on the Assets, and provide Buyer and its representatives with reasonable access to the Assets to conduct the environmental assessment. Buyer shall provide Seller three (3) days prior written notice of a desired date(s) for such assessment and Seller shall have the right to be present during any assessment and, if any testing is conducted pursuant to Seller’s express prior written consent, Seller may require splitting of all samples. Notwithstanding any other provision of this Agreement to the contrary, Buyer shall not have the right to drill any test, monitor or other ▇▇▇▇▇ or to extract samples of any air, soil, water or other substance from the Assets without Seller’s express prior written consent. If Buyer proposes a reasonable request to drill a test well or extract a sample pursuant to a systematic and customary procedure for the assessment of the environmental condition of the Assets and Seller refuses to grant its consent to such a well or sampling, then Buyer shall have the right, for a period of seventy-two (72) hours following notification of Seller’s refusal to consent, to deliver written notice to Seller of Buyer’s election to exclude from this transaction the portion of the Assets affected by such proposed test well or sample, and the Purchase Price shall be adjusted accordingly by the Allocated Value of such portion of the Assets so excluded. Under no circumstances whatsoever shall Seller ever be obligated to grant its consent to any such test ▇▇▇▇▇ or sampling proposed by Buyer, and Buyer’s sole and exclusive remedy for any refusal by Seller to grant its consent shall be the limited right contained in the preceding sentence to exclude the affected Assets from the transactions contemplated by this Agreement. If Buyer fails to exercise the right to exclude such Assets by written notice to Seller delivered prior to the expiration of the seventy-two hour period described above, then Buyer shall be conclusively deemed to have waived such right and shall be obligated to purchase the affected Assets without conducting such testing or sampling or any adjustment of the Purchase Price unless otherwise provided in this Agreement.

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and ▇▇▇▇▇▇▇▇▇. A detailed definition of the specific scope for Transmission Owner and Clinton and ▇▇▇▇▇▇▇▇▇ including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to ▇▇▇▇▇ and ▇▇▇▇▇▇▇ Substations on MWP-1 and the ▇▇▇▇ Substation on MWP-2. Clinton and ▇▇▇▇▇▇▇▇▇ will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and ▇▇▇▇▇▇▇▇▇ will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and ▇▇▇▇▇▇▇▇▇ will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and ▇▇▇▇▇▇▇▇▇. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and ▇▇▇▇▇▇▇▇▇. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.