Common use of ENUMERATION OF THE CONTRACT DOCUMENTS Clause in Contracts

ENUMERATION OF THE CONTRACT DOCUMENTS. 2.01 The Contract Documents consisting of the Agreement Form, M/WBE Program Requirements, Documents contained in the Project Manual, General and Supplementary Conditions, Drawings, Specifications, and all Addenda and modifications issued after execution of the Contract thereto together form the Contract, and they are fully a part of the Contract as if written herein word for word. The following is an enumeration of the Drawings and Project Manual for this Project: 2.02 The Drawings: SHEET NUMBER A0.0 SHEET NAME SITE PLAN CURRENT REV. DATE CURRENT REV. # BD1.6 B UILDING DEMOLITION “AS BUILT” DRAWINGS BD1.7 B UILDING DEMOLITION “AS BUILT” DRAWINGS BD1.8 B UILDING DEMOLITION “AS BUILT” DRAWINGS D1.1 OVERALL DEMOLITION KEY CEILING & PLAN D1.2 DEMOLITION FLOOR PLAN – ▇▇▇▇. ▇▇ D1.3 DEMOLITION FLOOR PLAN – ▇▇▇▇. ▇, ▇, ▇ ▇▇.▇ ▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇ – ▇▇▇▇. ▇, 9 & 9 D2.0 DEMOLITION CEILING PLAN – ▇▇▇▇. ▇ & 16 A2.D1 DEMOLITION ROOF PLAN – BLDG. 2 A2.D2 DEMOLITION ROOF PLAN – BLDGS. 8 & 9 A2.D3 DEMOLITION ROOF PLAN – BLDGS. 1, 3, 4, 11 & 16 A2.D4 DEMOLITION ROOF PLAN – BLDGS. 5, 6, 7, 10, 12, 13, 14 & 15 A1.0 OVERALL KEY FLOOR PLAN A1.1 FLOOR PLANS – BLDGS. 2, 3 & 7 2-18-2019 1 A1.2 FLOOR PLAN – ▇▇▇▇. ▇ 2-18-2019 1 A1.3 FLOOR PLAN – ▇▇▇▇. ▇ 2-18-2019 1 A1.4 FLOOR PLAN – ▇▇▇▇. ▇ 2-18-2019 1 A1.5 FLOOR PLAN – ▇▇▇▇. ▇ 2-18-2019 1 A1.6 FLOOR PLAN – ▇▇▇▇. ▇ 2-18-2019 1 A1.7 FLOOR PLAN – ▇▇▇▇. ▇▇ 2-18-2019 1 A1.8 ENLARGED TLT. RM. FLOOR PLAN (BUILDING 16) 2-18-2019 1 A1.9 FLOOR PLAN – BUILDINGS 7 & 10 2-18-2019 1 LS1.3 L/S PLAN – ▇▇▇▇. ▇ 2-18-2019 1 LS1.4 L/S PLAN – ▇▇▇▇. ▇ 2-18-2019 1 LS1.5 L/S PLAN – ▇▇▇▇. ▇ 2-18-2019 1 LS1.6 L/S PLAN – ▇▇▇▇. ▇ 2-18-2019 1 LS1.7 L/S PLAN – ▇▇▇▇. ▇▇ 2-18-2019 1 LS1.9 L/S PLAN – ▇▇▇▇. ▇ & 10 2-18-2019 1 A2.0 OVERALL KEY ROOF PLAN 2-18-2019 1 A2.1 ROOF PLAN – BUILDINGS 1 & 16 2-18-2019 1 A2.2 ROOF PLAN – BUILDING 2 (PARTIAL) 3-21-2019 2 A2.3 ROOF PLAN – BUILDING 2 (PARTIAL) 3-21-2019 2 A2.4 ROOF PLAN – BUILDING 3, 12, 15, 17 & 18 2-18-2019 1 A2.5 ROOF PLAN – BUILDINGS 4 (PARTIAL) 2-18-2019 1 A2.6 ROOF PLAN – BUILDING 4 (PARTIAL) & 11 3-21-2019 2 A2.7 ROOF PLAN – BUILDING 5 2-18-2019 1 A2.8 ROOF PLAN – BUILDING 6 2-18-2019 1 A2.9 ROOF PLAN – BUILDINGS 7, 13 & 14 2-18-2019 1 A2.10 ROOF PLAN – BUILDING 8 2-18-2019 1 A2.11 ROOF PLAN – BUILDING 9 2-18-2019 1 A2.12 ROOF PLAN – BUILDING 10 2-18-2019 1 A2.13 NOT USED A2.14 NOT USED A2.15 NOT USED A2.16 ROOF DRAINAGE PLAN – BUILDING 2 2-18-2019 1 A2.17 ROOF DRAINAGE PLAN – BUILDINGS 8 &9 2-18-2019 1 A2.18 ROOF DRAINAGE PLAN – BUILDINGS 1, 3, 4, 11, 16, 17 & 18 2-18-2019 1 A2.19 ROOF DRAINAGE PLAN – BUILDINGS 5, 6, 7, 10, 12, 13, 14 & 15 2-18-2019 1 A2.20 EXISTING ROOF PHOTOGRAPHS PARTIAL KEY PLAN A2.21 EXISTING ROOF PHOTOGRAPHS PARTIAL KEY PLAN A2.22 EXISTING ROOF PHOTOGRAPHS PARTIAL KEY PLAN A2.23 EXISTING ROOF PHOTOGRAPHS A2.24 EXISTING ROOF PHOTOGRAPHS A2.25 EXISTING ROOF PHOTOGRAPHS A2.26 EXISTING ROOF PHOTOGRAPHS A2.27 EXISTING ROOF PHOTOGRAPHS A3.0 NEW RCP ▇▇▇▇. ▇, 6, 8 & 10 A3.1 NEW RCP ▇▇▇▇. ▇, ▇, & ▇▇ ▇.▇ ▇▇▇ ▇▇▇▇. ▇ 1.2 RCP ▇▇▇▇. ▇ 1.3 RCP ▇▇▇▇. ▇ 1.4 RCP ▇▇▇▇. ▇ 1.5 RCP ▇▇▇▇. ▇ 1.6 RCP ▇▇▇▇. ▇▇ ▇▇ ▇.▇ ▇▇▇ ▇▇▇▇. ▇▇ ▇▇ A3.1.8 RCP ▇▇▇▇. ▇▇ ▇▇

Appears in 1 contract

Sources: Construction Agreement

ENUMERATION OF THE CONTRACT DOCUMENTS. 2.01 The Contract Documents consisting of the Agreement Form, M/WBE Program Requirements, Documents contained in the Project Manual, General and Supplementary Conditions, Drawings, Specifications, and all Addenda and modifications issued after execution of the Contract thereto together form the Contract, and they are fully a part of the Contract as if written herein word for word. The following is an enumeration of the Drawings and Project Manual for this Project: 2.02 The Drawings: SHEET NUMBER A0.0 SHEET NAME SITE PLAN CURRENT REV. DATE CURRENT REV. # BD1.6 B UILDING DEMOLITION “AS BUILT” DRAWINGS BD1.7 B UILDING DEMOLITION “AS BUILT” DRAWINGS BD1.8 B UILDING DEMOLITION “AS BUILT” DRAWINGS D1.1 OVERALL DEMOLITION KEY CEILING G001 Cover Sheet #1 3/05/21 A-101 General Notes and Drawing Index #1 3/05/21 A-102 Site Plan A-102.1 Staging/Phasing/Swing Space Site Plan and Notes #1 3/05/21 A-103 Overall Building Floor Plan and Scope of work #1 3/05/21 A-104 Life Safety Plan ▇▇▇▇ ▇ & PLAN D1.2 DEMOLITION FLOOR PLAN ▇ #▇ ▇/▇▇/▇▇ ▇-▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇ ▇ #1 3/05/21 A-106 Life Safety Plan Bldg 4,5,85,86,98,99 #1 3/05/21 AA-001 Roof General Notes and Legend #1 3/05/21 AA-002 Overall Existing Roof Plan AA-101 Roof Demolition Plan ▇▇▇▇ ▇ ▇▇▇▇ ▇ ▇▇-▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇ ▇ ▇▇▇▇ ▇ AA-103 Roof Demolition Plan ▇▇▇▇ ▇ ▇▇▇▇ ▇ ▇▇-▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇ 3,4,5,85,86 #2 7/16/21 AA-105 Roof New plan ▇▇▇▇ ▇ ▇▇▇▇ ▇ #▇ ▇/▇▇/▇▇ ▇▇-▇▇▇ ▇▇▇▇ New Plan ▇▇▇▇ ▇ ▇▇▇▇ ▇ #▇ ▇/▇▇/▇▇ ▇▇-▇▇▇ ▇▇▇▇ New Plan ▇▇▇▇ ▇ ▇▇▇▇ ▇ ▇▇-▇▇▇ ▇▇▇▇ ▇▇▇ ▇▇▇▇ ▇▇▇▇ 3,4,5,85,86 AA-501 Roof Details AA-502 Roof Details AA-503 Roof Details #2 7/16/21 AA-504 Roof Details AA-505 Roof Details AA-506 Roof Details AA-507 Roof Details AA-601 Roof Drainage Calculations AA-901 Roof Photos of Existing Condition ▇▇▇▇ ▇ ▇▇-▇▇▇ ▇▇▇▇ Photos of Existing Condition ▇▇▇▇ ▇,▇,▇ ▇▇-▇▇▇ ▇▇▇▇ Photos of Existing Condition Bldg 85,86,3 AB-101 Storefront Elevation, Plan and Schedule Bldg 1 #3 12/9/21 AB-201 Exterior Partial Elevations Bldg 1,3 (north and south) #2 7/16/21 AB-202 Exterior Partial Elevations Bldg 1,3 (east and west) #2 7/16/21 AC-101 Reflected Ceiling General Notes and Legend AC-102 Reflected Ceiling Plan Bldg 1 Area A AC-103 Reflected Ceiling Plan ▇▇▇▇ ▇ ▇▇▇▇ ▇ ▇▇-▇▇▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇ ▇ ▇▇▇▇ C #2 7/16/21 AC-105 Reflected Ceiling Plan ▇▇▇▇ ▇ ▇▇▇▇ ▇ ▇▇-▇▇▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇ 1 Area E AD-101 Demo and New Restroom Plan Rooms 109,110,157,158 #1 3/05/21 AD-102 Elevations and Flooring Plan Restrooms 157 & 158 #1 3/05/21 AD-103 Elevations and Flooring Plan Restrooms 109,110 #1 3/05/21 AD-104 Demo and New Restrooms Ceiling Plan Rooms 109,110,157,158 AE-101 Enlarged Demolition Plan ▇▇▇▇ ▇ ▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇-▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇ ▇▇▇▇ 1 Media Center AE-103 Enlarged New flooring/Finishing ▇▇▇▇ ▇ ▇▇▇▇▇ ▇▇▇▇▇▇ #▇ 7/16/21 AF-501 General Details AF-502 General Details AF-503 General Details AF-504 Fire Penetration UL Detail M-000 Mechanical Index, Symbol Legend and Notes #2 10/25/21 M-100 Mechanical Overall Plan #1 3/5/21 M-101 Partial Mechanical Plan – ▇▇▇▇. ▇▇. D1.3 DEMOLITION FLOOR PLAN ▇▇ #▇ 10/25/21 M-102 Partial Mechanical Plan – ▇▇▇▇. ▇, , . ▇ ▇▇ #▇ ./▇/▇▇ ▇-▇▇▇ Partial Mechanical Plan – ▇▇▇▇. ▇▇. ▇ ▇▇ #▇ 10/25/21 M-104 Partial Mechanical Plan – ▇▇▇▇. ▇▇. ▇ ▇▇ #▇ ▇/▇/▇▇ ▇-▇▇▇ ▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ – ▇▇▇▇. ▇▇. ▇ #▇ ▇▇/▇▇/▇▇ ▇-▇▇▇ ▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ – ▇▇▇▇. ▇▇. ▇ #▇ ▇/▇/▇▇ ▇-▇▇▇ ▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ – Bldgs. ▇▇. ▇▇ & ▇▇ #▇ ▇/▇/▇▇ ▇-▇▇▇ ▇▇▇▇ & ▇▇▇ ▇▇▇▇. Restrooms Plan 109,110,157 & 158-Bldg. #1 #1 3/5/21 M-201 Partial Mechanical Roof Plan – ▇▇▇▇. ▇▇. ▇ ▇▇ #▇ ▇▇/▇▇/▇▇ ▇-▇▇▇ Partial Mechanical Roof Plan – ▇▇▇▇. ▇▇. ▇ ▇▇ #▇ ▇▇/▇▇/▇▇ ▇-▇▇▇ Partial Mechanical Roof Plan – ▇▇▇▇. ▇▇. ▇ ▇▇ #▇ 10/25/21 M-204 Partial Mechanical Roof Plan – ▇▇▇▇. ▇▇. ▇ ▇▇ #▇ 10/25/21 M-205 Mechanical Roof Plan – Bldgs. ▇▇. ▇, ▇ & ▇ #▇ ▇/▇/▇▇ ▇-▇▇▇ ▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇. #1 & #3 #3 11/29/21 M-302 Mechanical Schedules, Plans, Sections – ▇▇▇▇. #▇ #▇ ▇▇/▇▇/▇▇ ▇-▇▇▇ ▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇ – Bldgs. #1, #2 & #3 #5 5/2/22 M-304 Mechanical Air Balance Schedules – Bldgs. #1, #2 & #3 M-400 Mechanical Controls #1 3/5/21 M-501 Mechanical Details #2 10/25/21 M-502 Mechanical Details #2 10/25/21 E-000 Electrical Index, Symbol Legend and Notes E-100 Electrical Overall Plan #1 3/5/21 E-101 New Electrical Restrooms 109, 110, 157 & 158 #1 3/5/21 E-102 Enlarged New Floor Plan – Bldg. No. 1 – Media Center #1 3/5/21 E-103 Enlarged New Floor Plan – Bldg. No. 1 – Media Center #1 3/5/21 E-104 Electrical Plan – Bldg. No. 2 #2 10/25/21 E-301 Partial Electrical Roof Plan – Bldg. No. 1 #1 3/5/21 E-302 Partial Electrical Roof Plan – Bldg. No. 1 #1 3/5/21 E-303 Partial Electrical Roof Plan – Bldg. No. 1 #1 3/5/21 E-304 Partial Electrical Roof Plan – Bldg. No. 1 #1 3/5/21 E-305 Electrical Roof Plan – Bldg. No. 2 E-306 Electrical Roof Plan – Bldgs. ▇▇. ▇ & #▇ #▇ ▇/▇/▇▇ ▇-▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇ #1 3/5/21 FA-000 Fire Alarm Index, Symbol Legend and Notes #5 5/2/22 FA-100 Fire Alarm Overall Plan #1 3/5/21 FA-201D Partial Fire Alarm Demo Plan – Bldg. No. 1 FA-201 Partial Fire Alarm Plan – Bldg. No. 1 #4 1/24/22 FA-202D Partial Fire Alarm Demo Plan – Bldg. No. 1 FA-202 Partial Fire Alarm Plan – Bldg. No. 1 #4 1/24/22 FA-203D Partial Fire Alarm Demo Plan – Bldg. No. 1 FA-203 Partial Fire Alarm Plan – Bldg. No. 1 #4 1/24/22 FA-204D Partial Fire Alarm Demo Plan – Bldg. No. 1 FA-204 Partial Fire Alarm Plan – Bldg. No. 1 #3 11/29/21 FA-205D Fire Alarm Demo Plan – ▇▇▇▇. ▇▇. ▇ ▇▇-▇▇▇ ▇▇▇▇ ▇▇▇▇▇ Plan – Bldg. No. 2 #2 10/25/21 FA-206D Fire Alarm Demo Plan – Bldgs. ▇▇. ▇ & ▇ ▇▇-▇▇▇ ▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇ – ▇▇▇▇▇. No. 3 & 5 #3 11/29/21 FA-207D Fire Alarm Demo Plan – Bldgs. ▇, 9 ▇. ▇▇ & 9 D2.0 DEMOLITION CEILING PLAN – ▇▇ ▇▇-▇▇▇ ▇▇▇▇ ▇▇▇▇. & 16 A2.D1 DEMOLITION ROOF PLAN – BLDG. 2 A2.D2 DEMOLITION ROOF PLAN – BLDGS. 8 & 9 A2.D3 DEMOLITION ROOF PLAN – BLDGS. 1, 3, 4, 11 & 16 A2.D4 DEMOLITION ROOF PLAN – BLDGS. 5, 6, 7, 10, 12, 13, 14 & 15 A1.0 OVERALL KEY FLOOR PLAN A1.1 FLOOR PLANS – BLDGS. 2, 3 & 7 2-18-2019 1 A1.2 FLOOR PLAN – ▇▇▇▇. 2-18-2019 1 A1.3 FLOOR PLAN – ▇▇▇▇. ▇ 2-18-2019 1 A1.4 FLOOR PLAN – ▇▇▇▇. ▇ 2-18-2019 1 A1.5 FLOOR PLAN – ▇▇▇▇. ▇ 2-18-2019 1 A1.6 FLOOR PLAN – ▇▇▇▇. ▇ 2-18-2019 1 A1.7 FLOOR PLAN – ▇▇▇▇. ▇▇. ▇2& ▇▇ #▇ ▇▇/▇▇/▇▇ ▇▇-18-2019 1 A1.8 ENLARGED TLT. RM. FLOOR PLAN (BUILDING 16) 2-18-2019 1 A1.9 FLOOR PLAN – BUILDINGS 7 & 10 2-18-2019 1 LS1.3 L/S PLAN – ▇▇▇ ▇▇▇▇ ▇▇▇▇▇ Plan – Bldg. ▇ 2-18-2019 Portables #2 10/25/21 FA-301 Partial Fire Alarm Roof Plan – Bldg. No. 1 LS1.4 L/S PLAN #3 11/29/21 FA-302 Partial Fire Alarm Roof Plan ▇▇▇▇Bldg. ▇ 2-18-2019 No. 1 LS1.5 L/S PLAN #3 11/29/21 FA-303 Partial Fire Alarm Roof Plan ▇▇▇▇Bldg. ▇ 2-18-2019 No. 1 LS1.6 L/S PLAN #3 11/29/21 FA-304 Partial Fire Alarm Roof Plan ▇▇▇▇Bldg. ▇ 2-18-2019 No. 1 LS1.7 L/S PLAN FA-305 Partial Fire Alarm Roof Plan ▇▇▇▇Bldgs. ▇▇ 2-18-2019 1 LS1.9 L/S PLAN – ▇▇▇▇. ▇ & 10 2▇ #▇ ▇▇/▇▇/▇▇ ▇▇-18-2019 1 A2.0 OVERALL KEY ROOF PLAN 2-18-2019 1 A2.1 ROOF PLAN – BUILDINGS 1 & 16 2-18-2019 1 A2.2 ROOF PLAN – BUILDING 2 (PARTIAL) 3-21-2019 2 A2.3 ROOF PLAN – BUILDING 2 (PARTIAL) 3-21-2019 2 A2.4 ROOF PLAN – BUILDING 3, 12, 15, 17 & 18 2-18-2019 1 A2.5 ROOF PLAN – BUILDINGS 4 (PARTIAL) 2-18-2019 1 A2.6 ROOF PLAN – BUILDING 4 (PARTIAL) & 11 3-21-2019 2 A2.7 ROOF PLAN – BUILDING 5 2-18-2019 1 A2.8 ROOF PLAN – BUILDING 6 2-18-2019 1 A2.9 ROOF PLAN – BUILDINGS 7, 13 & 14 2-18-2019 1 A2.10 ROOF PLAN – BUILDING 8 2-18-2019 1 A2.11 ROOF PLAN – BUILDING 9 2-18-2019 1 A2.12 ROOF PLAN – BUILDING 10 2-18-2019 1 A2.13 NOT USED A2.14 NOT USED A2.15 NOT USED A2.16 ROOF DRAINAGE PLAN – BUILDING 2 2-18-2019 1 A2.17 ROOF DRAINAGE PLAN – BUILDINGS 8 &9 2-18-2019 1 A2.18 ROOF DRAINAGE PLAN – BUILDINGS 1, 3, 4, 11, 16, 17 & 18 2-18-2019 1 A2.19 ROOF DRAINAGE PLAN – BUILDINGS 5, 6, 7, 10, 12, 13, 14 & 15 2-18-2019 1 A2.20 EXISTING ROOF PHOTOGRAPHS PARTIAL KEY PLAN A2.21 EXISTING ROOF PHOTOGRAPHS PARTIAL KEY PLAN A2.22 EXISTING ROOF PHOTOGRAPHS PARTIAL KEY PLAN A2.23 EXISTING ROOF PHOTOGRAPHS A2.24 EXISTING ROOF PHOTOGRAPHS A2.25 EXISTING ROOF PHOTOGRAPHS A2.26 EXISTING ROOF PHOTOGRAPHS A2.27 EXISTING ROOF PHOTOGRAPHS A3.0 NEW RCP ▇▇▇ ▇▇▇▇ ▇▇▇▇. ▇ Riser #3 11/29/21 FA-402 Fire Alarm Riser #2 10/25/21 P-000 Plumbing Index, Symbol Legend and Notes #2 10/25/21 P-100 Plumbing Overall Plan #1 , 6, 8 & 10 A3.1 NEW RCP /▇/▇▇ ▇-▇▇▇ ▇▇▇▇. ▇, ▇, & ▇▇ ▇.▇ ▇▇▇ ▇▇▇▇. 1.2 RCP ▇▇▇ Restrooms 109, 110, 157 & 158 #2 10/25/21 P-201 Partial Plumbing Roof Plan – ▇▇▇▇. ▇ 1.3 RCP ▇▇▇▇. ▇ 1.4 RCP ▇▇▇▇. ▇ 1.5 RCP ▇▇▇▇. ▇ 1.6 RCP ▇▇▇▇. ▇▇ ▇▇ ▇.▇ -▇▇▇ ▇▇▇▇. ▇▇ ▇▇▇▇▇▇▇A3.1.8 RCP Roof Plan – Bldg. No. 1 #1 3/5/21 P-203 Partial Plumbing Roof Plan – Bldg. No. 1 #1 3/5/21 P-204 Partial Plumbing Roof Plan – ▇▇▇▇. ▇▇. ▇ #▇ ▇/▇/▇▇ ▇-▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇ Plan – Bldgs. ▇▇. ▇ & ▇ #▇ ▇/▇/▇▇ ▇-▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇ #2 10/25/21 FP-000 Fire Protection Index, Symbol Legend and Notes #3 11/29/21 FP-100 Fire Protection Overall Buildings Plan FP-201 Partial Fire Protection Plan – Bldg. No. 1 #1 3/5/21 FP-202 Partial Fire Protection Plan – Bldg. No. 1 FP-203 Partial Fire Protection Plan – Bldg. No. 1 #1 3/5/21 FP-204 Partial Fire Protection Plan – Bldg. No. 1 C-0 Cover Sheet #1 3/12/21 C-1 Proposed Fire Lines #3 1/31/22 C-2 Restoration Plan #3 1/31/22 C-3 Storm Water Pollution Prevention Plan #1 1/31/22 C-4 Fire Line Details C-5 Fire Line Details C-6 Fire Line Details #3 1/31/22 C-7 Fence Details #1 3/12/21 C-8 Fire Line Notes C-9 General Notes S-000 General Notes S-001 Typical Details S-002 Typical Details ▇-▇▇▇ ▇▇▇▇ #▇ ▇▇▇▇ Wind Pressure Diagram ▇-▇▇▇ ▇▇▇▇ #▇ ▇▇▇▇ Wind Pressure Diagram ▇-▇▇▇ ▇▇▇▇ #▇ ▇▇▇▇ Wind Pressure Diagram ▇-▇▇▇ ▇▇▇▇ #▇ ▇▇▇▇ Wind Pressure Diagram ▇-▇▇▇ ▇▇▇▇ #▇ ▇▇▇▇ ▇▇▇▇ Pressure Diagram ▇-▇▇▇ ▇▇▇▇ #▇,▇,▇ ▇▇▇▇ Wind Pressure Diagram ▇-▇▇▇ ▇▇▇▇ #▇▇,▇▇ ▇▇▇▇ Wind Pressure Diagram ▇-▇▇▇ ▇▇▇▇ #▇ ▇▇▇▇ ▇▇▇▇ ▇-▇▇▇ ▇▇▇▇ #▇ Roof Plan ▇-▇▇▇ ▇▇▇▇ #▇ ▇▇▇▇ Plan ▇-▇▇▇ ▇▇▇▇ #▇ ▇▇▇▇ ▇▇▇▇ ▇-▇▇▇ ▇▇▇▇ #▇,▇,▇ Roof Plan 2.03 The Project Manual: Division 0 - Documents Division 1 - General Requirements Division 2 – Existing Conditions Division 3 - Concrete Division 4 - Masonry Division 5 - Metals Division 6 – Wood and Plastic Division 7 - Thermal & Moisture Protection Division 8 – Doors and Windows Division 9 - Finishes Division 10 - Specialties Division 11 - Equipment Division 13 - Special Construction Division 15 - Mechanical Division 16 - Electrical

Appears in 1 contract

Sources: Construction Contract