Erosion and Runoff Sample Clauses

Erosion and Runoff. The City will not tolerate soil and other debris entering the lake at <<Park Name>> from the User’s operations where such a discharge can be reasonably prevented. In addition to being subject to the City’s ordinances regarding erosion, including the possible issuance of citations, User may be required by the City Engineer to prepare an erosion control plan should it not be able to adequately control its operations to prevent erosion and daily runoff. If such a plan is required and approved by the City Engineer, User shall comply with such a plan.

Related to Erosion and Runoff

  • Erosion Prevention and Control Purchaser’s Operations shall be conducted reasonably to minimize soil erosion. Equipment shall not be operated when ground conditions are such that excessive damage will result. Purchaser shall adjust the kinds and intensity of erosion control work done to ground and weather condi- tions and the need for controlling runoff. Erosion control work shall be kept current immediately preceding ex- pected seasonal periods of precipitation or runoff.

  • Musculoskeletal Injury Prevention and Control The hospital in consultation with the Joint Health and Safety Committee (JHSC) shall develop, establish and put into effect, musculoskeletal prevention and control measures, procedures, practices and training for the health and safety of employees.

  • Archiving and Reuse Self-Archiving: The Publisher permits the Rights Holder to archive the Contribution in accordance with the Publisher's guidelines, the current version of which is set out in the Appendix "Author's Self-Archiving Guidelines".

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (▇▇▇) ▇▇▇-▇▇▇▇. The irrigation system shall be designed and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • Workplace Violence Prevention and Crisis Response (applicable to any Party and any subcontractors and sub-grantees whose employees or other service providers deliver social or mental health services directly to individual recipients of such services): Party shall establish a written workplace violence prevention and crisis response policy meeting the requirements of Act 109 (2016), 33 VSA §8201(b), for the benefit of employees delivering direct social or mental health services. Party shall, in preparing its policy, consult with the guidelines promulgated by the U.S. Occupational Safety and Health Administration for Preventing Workplace Violence for Healthcare and Social Services Workers, as those guidelines may from time to time be amended. Party, through its violence protection and crisis response committee, shall evaluate the efficacy of its policy, and update the policy as appropriate, at least annually. The policy and any written evaluations thereof shall be provided to employees delivering direct social or mental health services. Party will ensure that any subcontractor and sub-grantee who hires employees (or contracts with service providers) who deliver social or mental health services directly to individual recipients of such services, complies with all requirements of this Section.