Erosion Control Design. 3.8.1 Develop erosion control plans to comply with Town and any federal, state, or local requirements. Sheets will specify sediment control fence, inlet protection, rock check dams, sod, and seed locations. 3.8.2 Compile applicable Town and TxDOT standard details.
Appears in 1 contract
Sources: Professional Services
Erosion Control Design. 3.8.1 5.11.1 Develop erosion control plans to comply with Town and any federal, state, or local requirements. Sheets will specify sediment control fence, inlet protection, rock check dams, sod, and seed locations.
3.8.2 5.11.2 Compile applicable Town and TxDOT standard details.details 5.12. Opinion of Probable Construction Cost (OPCC)
5.12.1 Update opinion for construction cost using recent average unit bid prices which are representative of similar types of construction in the local area
Appears in 1 contract
Sources: Professional Services