Evaluation Data. Respondents must provide the following information to Toronto Hydro for the evaluation of the transformer losses and characteristics. Proposals lacking the required data may not be evaluated. • Guaranteed value of no-load losses at 100% rated voltage and corrected to 85 °C. Exciting current. Guaranteed value of load losses and impedance at rated current and voltage, corrected to 85 °C. Percentage regulation at 0.8 and unity power factors. Efficiency at 1/4, 1/2, 3/4, full-load and 5/4 full-load. Material used for high-voltage and low-voltage windings. Bushing technical data. Layout drawing showing dimensions and weights and location of all devices and features Location of plant where transformers are to be manufactured. Delivery terms.
Appears in 1 contract
Evaluation Data. Respondents must provide the following information to Toronto Hydro for the evaluation of the transformer losses and characteristics. Proposals lacking the required data may not be evaluated. • .
15.1 Guaranteed value of no-load losses at 100105% rated voltage and corrected to 85 85°C. .
15.2 Exciting current. current at 105% rated voltage.
15.3 Guaranteed value of load losses and impedance at rated current and voltage, corrected to 85 °C. 85° C.
15.4 Percentage regulation at 0.8 and unity power factors. .
15.5 Efficiency at 1/4, 1/2, 3/4, full-load and 5/4 full-load. .
15.6 Material used for high-voltage and low-voltage windings. Bushing .
15.7 High voltage switch technical data. Layout drawing showing dimensions and weights and location of all devices and features .
15.8 A dimensional outline drawing.
15.9 Location of plant where transformers are to be manufactured. Delivery terms.
Appears in 1 contract