Common use of Exchange of SCADA Data Clause in Contracts

Exchange of SCADA Data. With reference to NERC Reliability Standards TOP- 003 (Operational Reliability Data) and IRO-010 (RC Data Specification and Collection) and the sharing of information necessary to perform Operational Planning Analyses, Real-time monitoring, and Real-time Assessments: 4.1.2.1 The Parties shall exchange requested transmission power flows, measured bus voltages, and breaker equipment statuses of their transmission facilities via ICCP or EInet. 4.1.2.2 Each Party shall accommodate, as soon as practical, another Party’s request for additional existing ICCP/EInet transmission data points, but in any event, no more than two (2) weeks after the request has been submitted. 4.1.2.3 Each Party shall respond to the another Party’s request for additional, unavailable ICCP/EInet transmission data points as soon as practical but no later than two (2) weeks after the request has been submitted, with an expected availability target date for the requested data. 4.1.2.4 The Parties shall comply with all confidentiality agreements executed by the Parties relating to ICCP/EInet data. 4.1.2.5 The Parties shall exchange SCADA Data consisting of: (a) Status measurements 69 kV and above (breaker and switch statuses) (as available and required to observe for reliability as the respective Parties may determine); (b) Analog measurements 69 kV and above (flows and voltages) (as available and required to observe for reliability as the respective Parties may determine); (c) Generation point measurements, including generator output for each unit in MW and MVARS, as available; (d) Load point measurements, including bus loads, and specific loads at each substation in MW and MVARS, as available; (e) BAA net interchange; (f) Account for Pseudo-Tie in Actual Net Interchange term of respective Area Control Error calculations in accordance with currently effective Reliability Standard INT-009; and (g) Identification of other Real-time data available through ICCP/EInet.

Appears in 2 contracts

Sources: Joint Reliability Coordination Agreement, Joint Reliability Coordination Agreement

Exchange of SCADA Data. With reference to NERC Reliability Standards TOP- 003 TOP-003 (Operational Reliability Data) and IRO-010 (RC Data Specification and Collection) and the sharing of information necessary to perform Operational Planning Analyses, Real-time monitoring, and Real-time Assessments: 4.1.2.1 The Parties shall exchange requested transmission power flows, measured bus voltages, and breaker equipment statuses of their transmission facilities via ICCP or EInet. 4.1.2.2 Each Party shall accommodate, as soon as practical, another Party’s request for additional existing ICCP/EInet transmission data points, but in any event, no more than two (2) weeks after the request has been submitted. 4.1.2.3 Each Party shall respond to the another Party’s request for additional, unavailable ICCP/EInet transmission data points as soon as practical but no later than two (2) weeks after the request has been submitted, with an expected availability target date for the requested data. 4.1.2.4 The Parties shall comply with all confidentiality agreements executed by the Parties relating to ICCP/EInet data. 4.1.2.5 The Parties shall exchange SCADA Data consisting of: (a) Status measurements 69 kV and above (breaker and switch statuses) (as available and required to observe for reliability as the respective Parties may determine); (b) Analog measurements 69 kV and above (flows and voltages) (as available and required to observe for reliability as the respective Parties may determine); (c) Generation point measurements, including generator output for each unit in MW and MVARS, as available; (d) Load point measurements, including bus loads, and specific loads at each substation in MW and MVARS, as available; (e) BAA net interchange; (f) Account for Pseudo-Tie in Actual Net Interchange term of respective Area Control Error calculations in accordance with currently effective Reliability Standard INT-009; and (g) Identification of other Real-time data available through ICCP/EInet.

Appears in 1 contract

Sources: Joint Reliability Coordination Agreement