Expected Performance Clause Samples

Expected Performance. The Contractor estimates the PV system EEP as summarized in the table below. Year EEP (kWh) EESC (kWh) ▇▇▇▇ Capacity Guarantee (kWh) 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Expected Performance. The Licensee estimates the PV system EEP as summarized in the table below. Year EEP (kWh) EESC (kWh) ▇▇▇▇ Capacity Guarantee (kWh) 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 The Lease executed on or about __________ between the Judicial Council and Licensee is incorporated herein by reference.
Expected Performance. Improved status for Aboriginal people:
Expected Performance. The estimated cool down time of the detector cryostat from room temperature to 4 K is approximately 6-8 hours. The 3He-3He-4He fridge will take approximately 70 minutes to bring the temperature of the detector to 0.255 K. The frequency coverage of the 0.3 K bolometric detector will be 2 to ~100 cm-1, determined by the combination of the low pass filter on the 77 K shield and optional bandpass filter on the detector feedhorn. The low-pass filter rejects thermal IR and reduces loading on the 4 K and 0.3 K stages. The expected cutoff frequency for the detector is ~100 Hz which is sufficient for FTS modulation frequencies in the spectral region between 2 cm-1 and 40 cm-1. The typical NEP of the bolometer element is ~5×10-16 W/Hz, enabled by the low thermal conductivity of the bolometer element and carefully designed fully differential detector, preamplifier and data acquisition electronics [12]. Pump out time ~3 hrs. Cool down time from 300 to 4 K 6-8 hrs. (estimated) Cool down time from 4 K to 0.3 K 70 min. (estimated) 0.3 K fridge recycling time ~90 min. Warmup time < 8 hrs. Cooling capacity at 4.2 K 0.25 W Cooling capacity at 0.3 K 4 µW Thermometry channels 17 Thermometry accuracy ~0.2% Detector NEP ~5×10-16 W/Hz Filter bandpass 2 to 40 cm-1 2.3 Large test facility cryostat design
Expected Performance. The Doctoral Candidate will leverage all his/her knowledge skills to effectively conduct the research towards the obtainment of his/her Doctoral Degree.
Expected Performance. Each Party herein agrees to perform all acts and execute and deliver all documents as may be necessary or appropriate to carry out the intent and purposes of this Agreement. Recipient agrees that Discloser may not have an adequate remedy at law for money damages in the event that this Agreement has not been performed in accordance with its terms, and therefore agrees that Discloser shall be entitled to specific enforcement of the terms hereof in addition to any other remedy to which it may be entitled, at law or in equity.
Expected Performance. Matters caused by usage patterns or traffic that exceeds the Service procured by Customer.
Expected Performance 

Related to Expected Performance

  • Excused Performance In case performance of any terms or provisions hereof shall be delayed or prevented because of compliance with any law, decree or order of any governmental agency or authority, whether the same shall be of Local, State or Federal origin, or because of riots, war, public disturbances, strikes, lockouts, differences with workmen, fires, floods, acts of God or any other reason whatsoever which is not within the control of the party whose performance is interfered with and which, by the exercise of reasonable diligence, said party is unable to prevent, the party so suffering may, at its option, suspend, without liability, the performance of its obligations hereunder during the period of such suspension of performance of duties hereunder.

  • Continued Performance The Contractor and Contractor Parties shall continue to Perform their obligations under the Contract while any dispute concerning the Contract is being resolved.

  • Continuing Performance In the event of a dispute, the Owner and the Developer agree to continue their respective performance hereunder to the extent feasible in light of the dispute, including paying ▇▇▇▇▇▇▇▇, and such continuation of efforts and payment of ▇▇▇▇▇▇▇▇ shall not be construed as a waiver of any legal right.

  • Contract Performance C19.1 The Contractor shall ensure that: C19.1.1 the Goods conform in all respects with the Specification and, where applicable, with any sample or performance demonstration approved by the Authority; C19.1.2 the Goods operate in accordance with the relevant technical specifications and correspond with the requirements of the Specification and any particulars specified in the Contract; C19.1.3 the Goods conform in all respects with all applicable Laws; and C19.1.4 the Goods are free from defects in design, materials and workmanship and are fit and sufficient for all the purposes for which such Goods are ordinarily used and for any particular purpose made known to the Contractor by the Authority.

  • Prompt Performance All actions required to be taken (including payments) by any party under this Agreement shall be performed within the time prescribed for performance in this Agreement, or if no period is prescribed, such actions shall be performed promptly.