Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes which do not exceed the delegated signature authority of the Department may be executed by the Department Head in a form approved by County Counsel. The Board of Supervisors or Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Head. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor shall be entitled to no compensation whatsoever for the performance of such work. Contractor further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 12 contracts

Sources: Agreement for Services, Agreement for Services, Agreement for Services

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes Minor changes, which do not exceed increase the delegated signature authority amount paid under the Agreement, and which do not significantly change the scope of the Department work or significantly lengthen time schedules may be executed by the Department Head in a form approved by County Counsel. The Board of Supervisors or Supervisors/Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Headwork. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor Consultant to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor Consultant shall be entitled to no compensation whatsoever for the performance of such work. Contractor Consultant further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 9 contracts

Sources: Professional Services, Professional Services, Professional Services

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes which do not exceed the delegated signature authority of the Department may be executed by the Department Head in a form approved by County Counsel. The Board of Supervisors or Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Head. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor Consultant to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor Consultant shall be entitled to no compensation whatsoever for the performance of such work. Contractor Consultant further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 8 contracts

Sources: Consulting Agreement, Agreement to Provide Workshops and Training, Agreement to Provide Therapeutic Services

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes Minor changes, which do not exceed increase the delegated signature authority amount paid under the Agreement, and which do not significantly change the scope of the Department work or significantly lengthen time schedules, may be executed by the Department Head in a form approved by County Counsel. The Board of Supervisors or Supervisors/Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Headwork. The parties expressly recognize that, pursuant to Sonoma County Code Section Sections 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work work, and thereafter Contractor shall be entitled to no compensation whatsoever for the performance of such work. Contractor further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 7 contracts

Sources: Agreement for Services, Agreement for Services, Agreement for Services

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes Minor changes, which do not exceed the delegated signature authority of the Department Head and which do not significantly change the scope of work or significantly lengthen time schedules may be executed by the Department Head in a form approved by County Counsel. The Board of Supervisors or Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Headwork. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor Consultant to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor Consultant shall be entitled to no compensation whatsoever for the performance of such work. Contractor Consultant further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 6 contracts

Sources: Professional Services Agreement, Professional Services, Professional Services Agreement

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes which do not exceed the delegated signature authority of the Department may be executed by the Department Head in a form approved by County Counsel. The Board of Supervisors or Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Head. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor shall be entitled to no compensation whatsoever for the performance of such work. Contractor further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 4 contracts

Sources: Services Agreements, Agreement for Services, Agreement for Services

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes Minor changes, which do not exceed increase the delegated signature authority amount paid under the Agreement, and which do not significantly change the scope of the Department work or significantly lengthen time schedules may be executed by the Department Head in a form approved by County Counsel. The Board of Supervisors or Supervisors/Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Headwork. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor shall be entitled to no compensation whatsoever for the performance of such work. Contractor further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 4 contracts

Sources: Forensic Pathology Services Agreement, Subrecipient Agreement to Provide Services, Agreement for Services

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes Minor changes, which do not exceed increase the delegated signature authority amount paid under the Agreement, and which do not significantly change the scope of the Department work or significantly lengthen time schedules may be executed by the Department Head Sheriff-Coroner in a form approved by County Counsel. The Board of Supervisors or Supervisors/Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Headwork. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor shall be entitled to no compensation whatsoever for the performance of such work. Contractor further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 3 contracts

Sources: Agreement for Interview Room Equipment and Digital Evidence Management System, Body Removal Services Agreement, Polygraph Examination Services Agreement

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes Minor changes, which do not exceed the delegated signature authority of the Department Head and which do not significantly change the scope of work or significantly lengthen time schedules may be executed by the Department Head in a form approved by County Counsel. The Board of Supervisors or Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Headwork. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor shall be entitled to no compensation whatsoever for the performance of such work. Contractor further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 2 contracts

Sources: Professional Services Agreement, Professional Services

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes Minor changes, which do not exceed the delegated signature authority of the Department Sheriff-Coroner and which do not significantly change the scope of work or significantly lengthen time schedules may be executed by the Department Head Sheriff-Coroner in a form approved by County Counsel. The Board of Supervisors or Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Headwork. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor Consultant to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor Consultant shall be entitled to no compensation whatsoever for the performance of such work. Contractor Consultant further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 2 contracts

Sources: Canine Training Services Agreement, Forensic Pathology Services Agreement

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes Minor changes, which do not exceed the delegated signature authority of the Department Head and which do not significantly change the scope of work or significantly lengthen time schedules may be executed by the Department Head in a form approved by County Counsel. The Board of Supervisors or Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Headwork. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor Consultant to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor Consultant shall be entitled to no compensation whatsoever for the performance of such work. Contractor Consultant further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.County.‌

Appears in 1 contract

Sources: Grant Agreement

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes Minor changes, which do not exceed increase the delegated signature authority amount paid under the Agreement, and which do not significantly change the scope of the Department work or significantly lengthen time schedules may be executed by the Department Head General Manager in a form approved by County Counsel. The District’s Board of Supervisors or Purchasing Agent Directors must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Headwork. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County District personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor Consultant to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor Consultant shall be entitled to no compensation whatsoever for the performance of such work. Contractor Consultant further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the CountyDistrict.

Appears in 1 contract

Sources: Professional Services Agreement

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes Minor changes, which do not exceed significantly change the delegated signature authority scope of the Department work or significantly lengthen time schedules, may be executed by the Department Head Director of the Economic Development Board in a form approved by County Counsel. The Board of Supervisors or Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Headwork. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor shall be entitled to no additional compensation whatsoever for the performance of such work. Contractor further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 1 contract

Sources: Agreement for Services

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes Minor changes, which do not exceed increase the delegated signature authority amount paid under the Agreement, and which do not significantly change the scope of the Department work or significantly lengthen time schedules may be executed by the Department Head in a form approved by County Counsel. The Board of Supervisors or Supervisors/Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Headwork. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County Commission personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor shall be entitled to no compensation whatsoever for the performance of such work. Contractor further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the CountyCommission.

Appears in 1 contract

Sources: Funding Agreement

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes Minor changes, which do not exceed the any delegated signature authority and which do not significantly change the scope of the Department work or significantly lengthen time schedules may be executed by the Department Head appropriate department, division, or affiliate head in a form approved by County Counsel. The Board of Supervisors or Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Headwork. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor shall be entitled to no compensation whatsoever for the performance of such work. Contractor further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 1 contract

Sources: Blanket Purchase Order Agreement

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes Minor changes, which do not exceed the delegated signature authority of the Department Head and which do not significantly change the scope of work or significantly lengthen time schedules may be executed by the Department Head in a form approved by County Counsel. The Board of Supervisors or Purchasing Agent must Supervisorsmust authorize all other extra or changed work which exceeds the delegated signature authority of the Department Headwork. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor Consultant to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor Consultant shall be entitled to no compensation whatsoever for the performance of such work. Contractor Consultant further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 1 contract

Sources: Disaster Recovery Management Services Agreement

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes which do not exceed the delegated signature authority of the Department may be executed by the Department Head in a form approved by County Counsel. The Board of Supervisors or Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department HeadDirector of General Services. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor Consultant to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor Consultant shall be entitled to no compensation whatsoever for the performance of such work. Contractor Consultant further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 1 contract

Sources: Professional Services

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes Minor changes, which do not exceed the delegated signature authority of the Department Head and which do not significantly change the scope of work or significantly lengthen time schedules may be executed by the Department Head in a form approved by County Counsel. The Board of Supervisors or Purchasing Agent Supervisors/ must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Headwork. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor Consultant to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor Consultant shall be entitled to no compensation whatsoever for the performance of such work. Contractor Consultant further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 1 contract

Sources: Architectural and Engineering Professional Services Agreement

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes Minor changes, which do not exceed increase the delegated signature authority amount paid under the Agreement, and which do not significantly change the scope of the Department work (Exhibit A) or significantly lengthen time schedules may be executed by the Department Head in a form approved by County Counsel. The Board of Supervisors or Supervisors/Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Headwork. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor shall be entitled to no compensation whatsoever for the performance of such work. Contractor further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 1 contract

Sources: Professional Services Agreement

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes Minor changes, which do not exceed the delegated signature authority of the Department Head, and which do not significantly change the scope of work or significantly lengthen time schedules may be executed by the Department Head in a form approved by County Counsel. The Board of Supervisors or Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Headwork. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor Consultant to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor Consultant shall be entitled to no compensation whatsoever for the performance of such work. Contractor Consultant further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 1 contract

Sources: Professional Services Agreement

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes which do not exceed the delegated signature authority of the Department may be executed by the Department Head Sheriff- Coroner in a form approved by County Counsel. The Board of Supervisors or Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Head. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor Consultant to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor Consultant shall be entitled to no compensation whatsoever for the performance of such work. Contractor Consultant further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 1 contract

Sources: Forensic Toxicology Services Agreement

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes Minor changes, which do not exceed increase the delegated signature authority amount paid under the Agreement, and which do not significantly change the scope of the Department work or significantly lengthen time schedules, may be executed by the Department Head in a form approved by County Counsel. The Board of Supervisors or Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Headwork. The parties expressly recognize that, pursuant to Sonoma County Code Section Sections 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work work, and thereafter Contractor shall be entitled to no compensation whatsoever for the performance of such work. Contractor further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 1 contract

Sources: Agreement for Services

Extra or Changed Work. Extra or changed work or other changes to the Agreement may be authorized only by written amendment to this Agreement, signed by both parties. Changes Minor changes, which do not exceed the delegated signature authority of the Department Head and which do not significantly change the scope of work or significantly lengthen time schedules may be executed by the Department Head in a form approved by County Counsel. The Board of Supervisors or Purchasing Agent must authorize all other extra or changed work which exceeds the delegated signature authority of the Department Headwork. The parties expressly recognize that, pursuant to Sonoma County Code Section 1-11, County personnel are without authorization to order extra or changed work or waive Agreement requirements. Failure of Contractor to secure such written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the Agreement price or Agreement time due to such unauthorized work and thereafter Contractor shall be entitled to no compensation whatsoever for the performance of such work. Contractor further expressly waives any and all right or remedy by way of restitution and quantum meruit for any and all extra work performed without such express and prior written authorization of the County.

Appears in 1 contract

Sources: Master Blanket Purchase Order