EXTRA WORK/CHANGE ORDERS Sample Clauses

The Extra Work/Change Orders clause defines the process for modifying the original scope of work in a contract, typically to add, remove, or alter tasks or deliverables. This clause outlines how changes must be requested, documented, and approved—often requiring written authorization before any additional work is performed or compensated. Its core function is to ensure that both parties agree on the scope and cost of changes, thereby preventing disputes and maintaining clear records of contract modifications.
POPULAR SAMPLE Copied 2 times
EXTRA WORK/CHANGE ORDERS. When any work is necessary to the proper completion of the Project and for which no prices are provided for in the Bid or Proposal and Contract, the CONTRACTOR shall do such work, but only when and as ordered in writing by the OWNER. The OWNER may order changes in the Work without invalidating Contract. Payment for Extra Work shall be made as provided herein. Contractor agrees that overhead and profit for Extra Work shall not exceed 10% of the total cost of the Extra Work. The Contractor shall not be entitled to any additional funds for any work or Extra Work performed on the Project, unless a Change Order is issued and signed by the Owner. The CONTRACTOR shall perform the work as altered, whether increased or decreased, and no allowances shall be made for anticipated profits. Nothing in this section shall give rise to any claims for any delay or acceleration damages, and the CONTRACTORS sole remedy for any delays in the Project shall remain an equitiable extention of time as provided for in the Contract Documents. CONTRACTOR acknowledges and agrees to waive all rights or claims for compensation for any additional or other work not specifically authorized by the OWNER.
EXTRA WORK/CHANGE ORDERS. Should Owner, Owner's agent, Owner's design professional, the construction lender or any public body or inspector direct any modification or addition to the work covered by this Contract, the cost shall be added to the Contract Price. The cost of the Change Order will include the direct labor, material and subcontracted costs plus supervision, general conditions, overhead and profit. If there is a deductive Change Order, the direct costs of the change will be credited back to the Owner. Expenses incurred because of unusual or unanticipated conditions (such as inadequate roof support structure or inadequate electrical service) shall be paid for by Owner as extra work. No Extras or Change Order work shall be required to be performed without prior written authorization of Owner. Any Change Order for extra work shall be paid in full as provided in the Change Order or if not specifically state, at the completion of the extra work covered by the Change Order.

Related to EXTRA WORK/CHANGE ORDERS

  • Change Orders Any alteration or deviation from the Services mentioned or any other contractual specifications that result in a revision of this Agreement shall be executed and attached to this Agreement as a change order (“Change Order”).

  • Change Order The Change Order is then submitted to the Project Manager who immediately processes the CO with OPC as required by Bulletin 3.5 and BGS’ Contracting Plan.

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.

  • Contract Changes 31.1 All changes to the Call-Off Contract which cannot be accommodated informally as described in Clause 30 will require a Contract Change Note. 31.2 Either Party may request a contract change by completing and sending a draft Contract Change Note in the form in Schedule 4 of Part C - The Schedules ('the Contract Change Notice') to the other Party giving sufficient information to enable the other Party to assess the extent of the change and any additional cost that may be incurred. The Party requesting the contract change will bear the costs of preparation of the Contract Change Notice. Neither Party will unreasonably withhold nor delay consent to the other Party’s proposed changes to the Call-Off Contract. 31.3 Due to the agile-based delivery methodology recommended by the Framework Agreement, it may not be possible to exactly define the consumption of Services over the duration of the Call-Off Contract in a static Order Form. The Supplier should state the initial value of all Services that are likely to be consumed under the Call-Off Contract.

  • Change Order Process 12.2.1 Contractor shall provide Notice to Owner as soon as practicable, but no later than five (5) Business Days, after the time when Contractor knows of the impact of any Force Majeure Event, Owner Caused Delay or any other basis for a Change Order that will impact the Work. Failure to provide such Notice within ten (10) Business Days after the time when Contractor knows of the impact of any Force Majeure Event shall be deemed to be a waiver of the Contractor’s right to receive a Change Order with respect thereto. Such Notice shall, to the extent practicable, specify the estimated impact on the Target Price and/or the Project Schedule, as applicable, the impact upon the various portions of the Work occasioned by reason of such Force Majeure Event, Owner Caused Delay or any other basis for a Change Order, and shall substantiate the foregoing to the satisfaction of Owner. In the event that Contractor does not know or is unable to specify with reasonable certainty the impact upon the Work at the time such Notice is to be delivered, Contractor shall instead provide Owner with a notice of a potential or anticipated impact of any Force Majeure Event, Owner Caused Delay or any other basis for a Change Order that could impact the Work, and shall thereafter provide Owner (and, if requested by Owner, the Independent Engineer) with periodic supplemental Notices during the period that the Force Majeure Event, Owner Caused Delay or any other basis for a Change Order, as applicable, continues, detailing any developments, progress or other relevant information of which Contractor is aware. To the extent Owner (in consultation with the Independent Engineer with respect to a Material Change) agrees with the Contractor’s determination of a Force Majeure Event or Owner Caused Delay or any other basis for a Change Order, as applicable, and the effects thereof, Owner shall notify Contractor of Owner’s acceptance. In the event Owner (in consultation with the Independent Engineer with respect to a Material Change) does not accept the Contractor’s findings, Owner or Contractor shall be permitted to dispute such Change Order in accordance with Article 36, and Contractor shall be paid for any Work performed in respect of such disputed Change Order as provided in Section 12.2.5. 12.2.2 As soon as practicable, and in any event within fifteen (15) Days (or such other period as is mutually agreed by Owner and Contractor) after receipt from Owner of a request for a change or Notice of Owner’s acceptance under Section 12.2.1, Contractor shall submit to Owner a proposal for implementing the change indicating the estimated change to the Target Price and/or the Project Schedule, as applicable. If Owner (having consulted with the Independent Engineer in the case of a Material Change) agrees that the Contractor’s proposal should be implemented, Owner (having consulted with the Independent Engineer in the case of a Material Change) shall issue a Change Order incorporating such proposal. Upon receiving such Change Order, Contractor shall diligently perform the change in accordance with the terms thereof. 12.2.3 Contractor’s proposal required pursuant to Section 12.2.2 shall consist of: (a) a detailed material take-off with supporting calculations in accordance with the pricing structure herein, for pricing the change, (b) revisions, if any, to the Drawings and Specifications, (c) a schedule for the work associated with the proposed change, (d) the effect, if any, to the Target Price and/or the Project Schedule, as applicable, (e) the effect, if any, of the change on the Work, including the Performance Tests and/or Demonstration Tests (or protocol therefor), (f) changes, if any, to any right, liability or obligation of a Party or any other provision hereof and (g) changes, if applicable, to any Applicable Deadline.