Facility Design. Seller shall be responsible for designing and building the Facility in compliance with all Permits and according to Prudent Electric Industry Practice with respect to project design, engineering and selection and installation of equipment to be used at or installed in the Facility. At PGE’s request, Seller shall provide PGE with copies of the site plan for the Facility and descriptions, for the project design of the Facility. Any review by PGE of the design, construction, operation or maintenance of the Facility is solely for PGE’s information, and PGE shall have no responsibility to Seller or any third party in connection with such review. Seller is solely responsible for the economic and technical feasibility, operational capability and reliability of the Facility.
Facility Design. Operator agrees that the Establishment shall be designed, constructed and improved to reflect high quality construction standards and to improve the general design aesthetic of the area. Internally lit and flashing signs shall not be permitted.
Facility Design. The proposed tower site is located on an approximately 38.5 acre parcel located at ▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇ owned by ▇▇▇▇ ▇▇▇▇▇▇▇. It is classified in the Residential Rural Zoning District and is improved with a single-family residence, garage and barn. The proposed telecommunications facility includes an approximately 10,000 s.f. lease area located in the southern section of the host parcel. The facility consists of a new self-supporting monopole tower 150' in height, with a 5' lightning rod on top extending to an overall height of 155' AGL. T-Mobile would install up to nine (9) panel antennas, one (1) dish antenna and related equipment at a centerline height of 146' above grade level (AGL). The tower would be designed for future shared use of the structure by other FCC licensed wireless carriers. T-Mobile equipment cabinets would be installed on a proposed 10' x 20' concrete equipment pad within the tower compound with separate space for a proposed backup power generator. The tower compound would consist of a 2,500 s.f area to accommodate T-Mobile's equipment and provide for future shared use of the facility by other carriers. The tower compound would be enclosed by a six (6) foot high chain link fence with an additional one (1) foot of barbed wire at the top for security purposes (remote location). Vehicle access to the facility would be provided from Woodland Street starting at the location of an old farm access gate over a gravel access drive a distance of approximately 4,100' to the proposed compound. Utility connections would be routed along the access easement. Attachment 3 contains the specifications for the proposed Facility, including an abutters map, site plan, compound plan and tower elevation, sedimentation and erosion control details and other relevant details of the proposed Facility. Included as Attachments 4 through 6 are various documents developed as part of the Applicants' due diligence including a Visibility Analysis (Attachment 5). Some of the relevant information identifies that: • The total area of disturbance is low and few trees will need to be removed. • The proposed Facility will have little to no impact on water flow or water quality and no direct impacts to any wetlands or watercourses are anticipated. • The location of the proposed Facility is just outside of the 100 year flood zone located along the western border of the Property. • A majority of views of the tower are limited to the upper portions of the tower from nearby locat...
Facility Design. Section 4.1 - Within (30) Thirty days after the date hereof, BEARD shall submit a proposed design for a two hundred (200) TPH Po▇▇ ▇▇nes Recovery Facility to PMC for Approval. Within fourteen (14) days after PMC's receipt of BEARD's proposed design of that Facility, PMC either will grant App▇▇▇▇▇ ▇f BEARD's design or will submit to BEARD its written proposed revisio▇▇ ▇▇ ▇he design of that Facility. ▇▇ PMC submits proposed revisions to BEARD's proposed design, BEARD will promptly incorporate into the p▇▇▇▇▇▇▇ design of the Fac▇▇▇▇▇ all mutually acceptable revisions and resubmit the design of the Facility to PMC for its Approval. Within seven (7) days after PMC's receipt of that revised design, PMC will provide written Approval or rejection of the design to BEARD. Promptly after receipt of PMC's written Approval of the prop▇▇▇▇ design of the Pond Fines Recovery Facility and BEARD's receipt of required state and federal regulatory authorizat▇▇▇▇, ▇EARD, at its sole expense, shall commence construction and install▇▇▇▇▇ of the Pond Fines Recovery Facility.
Facility Design. Reviews are technical reviews of manufacturing facilities, and they are conducted to ensure best practices in manufacturing are captured prior to commencing construction activities. FCE proposes both preliminary and final Facility Design Reviews.
Facility Design. We are planning for a specifically designed facility that connects well to our school mission and vision and lends itself to outdoor educational areas. Summit Place School intends to use the entirety of its facility, and outdoor space. Flexible and adaptable classrooms and outdoor areas will facilitate this approach. The design is important to be open and flexible, extending into outdoor environments. Ideally, we’d like to have our school built next to a park or other community facility to provide additional outdoor space for classes and for school gatherings, festivals, or plays where the community is welcome to attend. For example, a community park and soccer fields are within reasonable walking distance.
Facility Design i. Description;
Facility Design. A. The WQD, with authorization from the Board of County Commissioners, shall manage all architectural and design contracts for the facility, in consultation with the City. B. An Interlocal design team comprised of staff members of the WQD and City Public Works Department shall be established to provide consultation in the design.
Facility Design. It is understood that KindredBio/CRB is responsible for the overall facility design, including utility supplies. However, it is understood that Pall as the equipment supplier would need to be fully involved in equipment layout to ensure optimized ergonomics and utility point placement. The labor for this support is part of the overall project coordination, design and engineering support and project management described in section 4.3. Upon request by Kindred, Pall would be able to discuss 3D facility concepts in more detail.
Facility Design. Premises development and innovation • Cargo transportation plan • Perspectives and conceptual plans • Vehicle traffic flow • Facility, including treatment and air quality, permitting planConstruction health and safety plan • Facility flexibility between phytosanitary treatment services and cold chain processing services. Are sizes fixed or flexible based on seasonality of product being treated or processed.