Factory Acceptance Testing. Equipment shall be assembled in system configuration for factory acceptance testing. Rack, simulated Path, Switch Section placement and testing shall be performed to verify that the equipment exceeds the published manufacturer's specification. PathNet shall provide the manufacturer's published testing procedures to Texaco at least two (2) weeks before the scheduled factory acceptance testing is to occur. Texaco shall have the right to review these testing procedures and request procedural modifications if the procedures deviate from industry standards. The results of the factory acceptance tests shall be provided to Texaco.