Failed Testing Sample Clauses

The Failed Testing clause defines the consequences and procedures that apply when a product, service, or deliverable does not meet specified testing criteria. Typically, this clause outlines the steps to be taken if a test is failed, such as requiring the supplier to correct defects and resubmit the item for retesting, or allowing the purchaser to reject the item altogether. Its core function is to ensure quality control by providing a clear process for addressing non-conformance, thereby protecting the interests of the party receiving the goods or services.
POPULAR SAMPLE Copied 3 times
Failed Testing. 12.1.3.1 If County Project Director makes a good faith determination at any time an Acceptance Test that the Solution as a whole, or any component thereof, has not successfully completed an Acceptance Test or has not achieved Final Acceptance (collectively referred to for purposes of this Paragraph 12.1.3 as “Designated Test”), County Project Director will promptly notify Contractor in writing of such failure, specifying with as much detail as possible the manner in which the Solution component or the Solution failed to pass the applicable Designated Test. Contractor must immediately commence all reasonable efforts to complete, as quickly as possible, such necessary corrections, repairs and modifications to the Solution component or the Solution as will permit the Solution component or the Solution to be ready for retesting. Contractor must notify County Project Director in writing when such corrections, repairs and modifications have been completed, and when the applicable Designated Test will begin again. If, after the applicable Designated Test has been completed for a second time, County Project Director makes a good faith determination that the Solution component or the Solution again fails to pass the applicable Designated Test, County Project Director will promptly notify Contractor in writing, specifying with as much detail as possible the manner in which the Solution component or the Solution again failed to pass the applicable Designated Test. Contractor must immediately commence all reasonable efforts to complete, as quickly as possible, such necessary corrections, repairs and modifications to the Solution component or the Solution as will permit the Solution component or the System to be ready for retesting. 12.1.3.2 Such procedure will continue, subject to the County’s rights under Paragraph 6.2.4 (Termination) above, in the event Contractor fails to timely complete any Deliverable identified as a milestone, until such time as the County notifies Contractor in writing either: (i) of the successful completion of such Designated Test or (ii) that the County has concluded that satisfactory progress toward such successful completion of such Designated Test is not being made, in which latter event, the County will have the right to make a determination, which will be binding and conclusive on Contractor, that a non-curable default has occurred and to terminate this Contract in accordance with Paragraph 22.0 (Termination for Default) below on the ba...
Failed Testing. 5.7.1 If the County’s Project Director makes a good faith determination during the applicable acceptance testing period that the Solution (as a whole, or any component thereof), Services and/or Deliverables has not successfully completed an Acceptance Test or has not achieved Final Acceptance (collectively referred to for purposes of this Sub-paragraph 5.6 (Failed Testing) as “Designated Test”) in accordance with such test’s requirements, the County’s Project Director shall promptly notify Contractor in writing as set forth in Sub-Paragraph 5.1 (Acceptance Criteria). 5.7.2 Such procedure shall continue until such time as County notifies Contractor in writing either: (i) of the successful completion of such Designated Test in accordance with such test’s requirements, or (ii) that County has concluded, subject to the Dispute Resolution Procedure (as defined in Sub-paragraph 24.1 of this Agreement), that satisfactory progress toward such successful completion of such Designated Test in accordance with such test’s requirements is not being made, in which latter event, the Parties shall utilize the Dispute Resolution Procedure, and if the parties fail to agree upon a means of resolving the issue, then County shall have the right to seek to terminate this Agreement in accordance with Sub-paragraph 9.2 (Termination for Default) on such basis. 5.7.3 Such a termination by County may be, subject to the Dispute Resolution Procedure; specifically: (i) a termination with respect to one or more of the components of the Solution; (ii) a termination of any part of Exhibit A (Statement of Work) relating to the Solution, Service(s), Deliverables(s), and/or milestone(s) that is (are) not performing or conforming as required herein; or (iii) a termination of the entire Agreement if there is a failure to achieve Final Acceptance in accordance with Sub-paragraph 5.5 due to a Sev 1 or Sev 2 issue that materially affects the functionality or performance of the Solution as a whole in accordance with the Specifications and that cannot be resolved despite good faith efforts by Contractor. In the event of a termination under this Sub-paragraph 5.6 (Failed Testing), and subject to the Dispute Resolution Process set forth in Paragraph 24.0 (including final resolution of litigation, if applicable), County shall have the right to receive from Contractor, reimbursement of all payments made to Contractor by County under this Agreement for the component(s), Solution, Service(s), Deliverable...
Failed Testing. To monitor the MicroCool gown’s compliance with the AAMI Level 4 standard after receiving the FDA’s clearance, Company 1 implemented (and Avanos continued) a monthly, liquid-penetration monitoring test that measured the protective quality of each critical zone of the gown, including the sleeve seams. Beginning in or about 2012 and continuing through in or about 2015, the MicroCool gowns repeatedly failed the monthly liquid-penetration monitoring test at the sleeve seam critical zone. Employee 1 knew that the MicroCool gowns were failing these monthly monitoring tests at the sleeve seam.

Related to Failed Testing

  • Random Testing Notwithstanding any provisions of the Collective Agreement or any special agreements appended thereto, section 4.6 of the Canadian Model will not be applied by agreement. If applied to a worker dispatched by the Union, it will be applied or deemed to be applied unilaterally by the Employer. The Union retains the right to grieve the legality of any imposition of random testing in accordance with the Grievance Procedure set out in this Collective Agreement.

  • ODUF Testing 6.6.1 Upon request from TWTC, AT&T shall send ODUF test files to TWTC. The Parties agree to review and discuss the ODUF file content and/or format. For testing of usage results, AT&T shall request that TWTC set up a production (live) file. The live test may consist of TWTC’s employees making test calls for the types of services TWTC requests on ODUF. These test calls are logged by TWTC, and the logs are provided to AT&T. These logs will be used to verify the files. Testing will be completed within thirty (30) days from the date on which the initial test file was sent.

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester. 7.2.2 No later than thirty (30) Days prior to the earlier of the Scheduled Substantial Completion Date or Substantial Completion, Design-Builder shall provide to Owner for review a detailed testing plan for the Performance Tests (other than for air emissions). Owner and Design-Builder shall agree upon a testing plan that shall be consistent with the Performance Test Protocol contained in Exhibit A hereto. After such agreement has been reached, Design-Builder shall notify the Owner five (5) business days prior to the date Design-Builder intends to commence the Performance Tests and shall notify the Owner upon commencement of the Performance Tests. Owner and Independent Engineer each have the right to witness all testing, including the Performance Tests and any equipment testing, whether at the Site or at the Subcontractor’s or equipment supplier’s premises during the course of this Agreement. Notwithstanding the foregoing sentence, Owner shall bear the costs of providing a witness to any such testing and all such witnesses shall comply at all times with Design-Builder’s, Subcontractor’s or equipment supplier’s safety and security procedures and other reasonable requirements, and otherwise conduct themselves in a manner that does not interfere with Design-Builder’s, Subcontractor’s or equipment supplier’s activities or operations. 7.2.3 Design-Builder shall provide to Owner a Performance Test report (excluding results from air emissions testing), including all applicable test data, calculations and certificates indicating the results of the Performance Tests and, within five (5) business days of Owner’s receipt of such results, Owner, Independent Engineer and Design-Builder will jointly inspect such Work and review the results of the Performance Tests to verify that the Performance Guarantee Criteria have been met. If Owner or Independent Engineer reasonably determines that the Performance Guarantee Criteria have not been met, Owner shall notify Design-Builder the reasons why Owner determined that the Performance Guarantee Criteria have not been met and Design-Builder shall promptly take such action or perform such additional work as will achieve the Performance Guarantee Criteria and shall issue to the Owner another notice in accordance with Section 7.2.2; provided however that if the notice relates to a retest, the notice may be provided no less than two (2) business days prior to the Performance Tests. Such procedure shall be repeated as necessary until Owner and Independent Engineer verifies that the Performance Guarantee Criteria have been met. 7.2.4 If Owner, for whatever reason, prevents Design-Builder from demonstrating the Performance Guarantee Criteria within thirty (30) Days of Design-Builder’s notice that the Plant is ready for Performance Testing, then Design-Builder shall be excused from demonstrating compliance with the Performance Guarantee Criteria during such period of time that Design-Builder is prevented from demonstrating compliance with the Performance Guarantee Criteria; provided however that Design-Builder will be deemed to have fulfilled all of its obligations to demonstrate that the Plant meets the Performance Guarantee Criteria should such period of time during which Design-Builder is prevented from demonstrating the Performance Criteria exceed thirty (30) Days or extend beyond the Final Completion Date.