Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and .2 a final Certificate for Payment has been issued by the Architect. § 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:
Appears in 31 contracts
Sources: Facilities and Special Projects Contract, Facilities and Special Projects Contract, Construction Contract
Final Payment. § 5.2.1 11.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor Construction Manager when .1 the Contractor Construction Manager has fully performed the Contract Contract, except for the ContractorConstruction Manager’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:;
Appears in 24 contracts
Sources: Guaranteed Maximum Price Amendment, Standard Form of Agreement Between Owner and Construction Manager as Constructor, Standard Form of Agreement Between Owner and Construction Manager as Constructor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 (1) the Contract has been fully performed by the Contractor has fully performed the Contract except for the Contractor’s 's responsibility to correct nonconforming Work as provided in Article 12 Subparagraph 12.2.2 of AIA Document A201–2017, the General Conditions and to satisfy other requirements, if any, which extend beyond necessarily survive final payment; and
.2 and (2) a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s ; such final payment to the Contractor shall be made no later by the Owner not more than 30 days after the issuance of the Architect’s 's final Certificate for Payment, or as follows:
Appears in 12 contracts
Sources: Standard Form of Agreement Between Owner and Contractor, Standard Form of Agreement Between Owner and Contractor, Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 7.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor Construction Manager when .1 the Contractor Construction Manager has fully performed the Contract except for the ContractorConstruction Manager’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2007, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:;
Appears in 10 contracts
Sources: Standard Form of Agreement Between Owner and Construction Manager as Constructor, Standard Form of Agreement Between Owner and Construction Manager as Constructor, Standard Form of Agreement Between Owner and Construction Manager as Constructor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2 of AIA Document A201–2017A232–2009, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:;
Appears in 10 contracts
Sources: Standard Form of Agreement Between Owner and Contractor, Standard Form of Agreement Between Owner and Contractor, Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2007, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:
Appears in 6 contracts
Sources: Owner/Contractor Agreement, Standard Form of Agreement Between Owner and Contractor, General Contract
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:.
Appears in 4 contracts
Sources: Standard Form of Agreement Between Owner and Contractor, Standard Form of Agreement Between Owner and Contractor, Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the ArchitectEngineer.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the ArchitectEngineer’s final Certificate for Payment, or as follows:
Appears in 2 contracts
Sources: Aia Document A101tm – 2017, Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the ArchitectEngineer.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the ArchitectEngineer’s final Certificate for Payment, or as follows:.
Appears in 2 contracts
Sources: Standard Form of Agreement Between Owner and Contractor, Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.when
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the aft Architect’s final Certificate for Payment, or as follows:complete with all supporting docum er th enta e issuance of the tion and close-out
Appears in 2 contracts
Sources: Standard Form of Agreement Between Owner and Contractor, Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when when
.1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2007, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:
Appears in 2 contracts
Sources: Standard Form of Agreement Between Owner and Contractor, Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when when:
.1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Subparagraph 12.2.2 of AIA Document A201–2017A201-1997, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:
Appears in 2 contracts
Sources: Standard Form of Agreement Between Owner and Contractor (MTR Gaming Group Inc), Construction Contract (Old Line Bancshares Inc)
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance receipt of the Architect’s final Certificate for Payment, or as follows:Contractor's invoice.
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2007, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect. .3 resolution by the Board of Directors that the project is complete.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 -45 days after the issuance of the Architect’s final Certificate for Payment, or as follows:
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when when:
.1 the The Contractor has fully performed the Contract except for the Contractor’s 's responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017GCC201, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a A final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s 's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s 's final Certificate for Payment, or as follows:
Appears in 1 contract
Sources: Construction Contract
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when when:
.1 the Contractor has fully performed the Contract except for the Contractor’s 's responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017GCC201, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s 's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s 's final Certificate for Payment, or as follows:
Appears in 1 contract
Sources: Owner and Contractor Agreement
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when when
.1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:: « »
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when when
.1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:: and after contractor has submitted and Architect has approved all Project closeout requirements including all releases of liens, etc.
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2007, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:follows for Payment: « »
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the m Contractor when when
.1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct re Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:
Appears in 1 contract
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contract when:
1. The Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Subparagraph 12.2.2 of AIA Document A201–2017Document, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 2. a final Certificate for Payment has been issued by the ArchitectEngineer.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the ArchitectEngineer’s final Certificate for Payment, or as follows:
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2007, as amended, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 12.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when when:
.1 the Contractor has fully performed the Contract except for the Contractor’s 's responsibility to correct Work as provided in Article 12 Subparagraph 12.2.2 of AIA Document A201–2017A201-1997, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 12.2.2 The Owner’s 's final payment to the Contractor shall be made no later than 30 10 days after the issuance of the Architect’s 's final Certificate for Payment, or as follows:
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor (Urban Cool Network Inc)
Final Payment. § 5.2.1 4.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017Section 18.2, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the ArchitectArchitect in accordance with Section 15.7.1.
§ 5.2.2 4.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:
Appears in 1 contract
Sources: Standard Abbreviated Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final paymentPayment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 (1) the Contract has been fully performed by the Contractor has fully performed the Contract except for the Contractor’s 's responsibility to correct nonconforming Work as provided in Article 12 Subparagraph 12.2.2 of AIA Document A201–2017, the General Conditions and to satisfy other requirements, if any, which extend beyond necessarily survive final payment; and
.2 and (2) a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s ; such final payment to the Contractor payments shall be made no later by the Owner not more than 30 days after the issuance of the Architect’s 's final Certificate for Payment, or as follows:
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor (Penn National Gaming Inc)
Final Payment. § 5.2.1 4.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when when:
.1 the Contractor has fully performed the Contract except for the Contractor’s =s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017Paragraph 17.2, and to satisfy other requirements, if any, which extend beyond final payment; : and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 4.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:
Appears in 1 contract
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the ArchitectArchitect in accordance with Article 9 of AIA Document A201-2017.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance in accordance with Article 9 of the Architect’s final Certificate for Payment, or as follows:AIA Document A201-2017.
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017A201–2007, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s Owner's final Certificate for Payment, or as follows:
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:the
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § Section 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when when:
.1 the Contractor has fully performed the Contract except for the Contractor’s 's responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201-1997, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ Section 5.2.2 The Owner’s 's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s 's final Certificate for Payment, or as follows:
Appears in 1 contract
Sources: Construction Contract (Community Bankshares Inc /Sc/)
Final Payment. § 5.2.1 Final Payment Where the Contract Sum is Based on a Stipulated Sum
§ 5.2.1.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017A232–2019, and to satisfy other requirements, if any, which extend beyond final payment; and;
.2 a final Certificate for Payment or Project Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:;
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 4.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when when:
.1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017Paragraph 17.2, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 4.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:
Appears in 1 contract
Sources: Construction Contract (Omtool LTD)
Final Payment. § 5.2.1 11.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when Construction Manager when
.1 the Contractor Construction Manager has fully fully, properly and timely performed the Contract Contract, except for the ContractorConstruction Manager’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and;
.2 the Construction Manager has submitted a final accounting for the Cost of the Work and a final and proper Application for Payment; .3 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:Architect in accordance with Section 11.2.2.2; and
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Construction Manager as Constructor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–1997, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when when
.1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of modified AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect, certifying that all Work is complete.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 4.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when when:
.1 the Contractor has fully performed the Contract except for the Contractor’s 's responsibility to correct Work as provided in Article 12 of AIA Document A201–2017Paragraph 17.2, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 4.2.2 The Owner’s 's final payment to the Contractor shall be made no later than 30 15 days after the issuance of the Architect’s 's final Certificate for Payment, or as follows:
Appears in 1 contract
Sources: Construction Contract
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; andwhen
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made in accordance with Section 9.10 in AIA-201- 2017, General Conditions as modified and included in the Contract Documents. no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:: « »
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 4.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when when:
.1 the Contractor has fully performed the Contract except for the Contractor’s 's responsibility to correct Work as provided in Article 12 of AIA Document A201–2017Paragraph 17.2, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 4.2.2 The Owner’s 's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s 's final Certificate for Payment, or as follows:
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the ofthe Contract Sum, shall be made by the Owner to the Contractor when when
.1 the Contractor has fully performed the Contract except for the Contractor’s 's responsibility to correct Work as provided in Article 12 of AIA Document A201–2017A201 20 17, and to satisfy other requirements, if anyifany, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s 's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s 's final Certificate for Payment, or as follows:: Not applicable
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Owne Contractor when when
.1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2007, and to satisfy other requirements, if any, which extend beyond final payment; andsa
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:; and,
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.when
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 Section 12.2.2 of AIA Document A201–2017A201–2007, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect, certifying that all Work is complete.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when when:
.1 The Contract has been fully performed by the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct nonconforming Work as provided in Article 12 Subparagraph 12.2.2 of AIA Document A201–2017, the General Conditions and to satisfy other requirements, if any, which extend beyond necessarily survive final payment; and
.2 a A final Certificate for Payment has been issued by the Architect.;
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:: All Contract Close-Out Documents
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 4.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when when:
.1 the Contractor has fully performed the Contract except for the Contractor’s 's responsibility to correct Work as provided in Article 12 of AIA Document A201–2017Section 17.2, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 4.2.2 The Owner’s 's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s 's final Certificate for Payment, or as followsfollow:
Appears in 1 contract
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, less any deductions to which the Owner is entitled under the Contract Documents, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017A201–2007, as amended for this Project, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect. .3 and all other terms of the Conditions of the Contract have been met.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:
Appears in 1 contract
Sources: Standard Form of Agreement Between Owner and Contractor
Final Payment. § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s 's responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s 's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s 's final Certificate for Payment, or as follows: