For Distribution. When primary metering equipment including current and/or potential transformers is installed, the work shall be checked out by a Journeyman Meterman. Additionally, substation and SCADA metering may be installed and checked out by a Relay Technician or a Relay/Communications Technician who is qualified to perform the assigned work. When primary metering equipment including current and / or potential transformers is installed for transmission equipment, the work shall be installed, tested and maintained by a Journeyman Meterman and or qualified Relay Technician. Additionally, in Transmission Substations, substation and SCADA metering may be installed, tested and maintained by a Relay Technician who is qualified to perform the assigned work. The testing of all primary meters (2400 volts and above) and secondary meters (480 volts and above) in the field shall require a Journeyman Meterman. "Meter Testers" shall not be required to test meters in the field other than single phase, single element (not over 240 volts). "Meter Repairmen" may be required to test self-contained and secondary meters (less than 480 volts) in the field, and all types of meters in the shop. "Metermen" shall not be required to climb poles. (Note: See Memorandum of Understanding - Relay Technicians / Telecommunications Technicians, page 58 of this agreement.)
Appears in 2 contracts
Sources: Collective Bargaining Agreement, Collective Bargaining Agreement