FOUNDATION ENGINEERING EVALUATION AND RECOMMENDATIONS Clause Samples

FOUNDATION ENGINEERING EVALUATION AND RECOMMENDATIONS. The engineer shall analyze the information developed by investigation or otherwise available to the ENGINEER, including those aspects of the subsurface conditions which may affect design and construction of proposed structures, and shall consult with the Architect on the design and Engineering requirements of the PROJECT. Based on such analysis and consultation, the ENGINEER shall submit a professional evaluation and recommendations for the necessary areas of consideration, including but not limited to the following: a. Foundation support of the structure and slabs, including soil bearing pressures, bearing elevations, foundation design recommendations and anticipated settlement. b. Anticipation of, and management of, groundwater for design of structures and pavements. c. Lateral earth pressures for design of walls below grade, including backfill, compaction and subdrainage, and their requirements. d. Soil material and compaction requirements for site fill, construction backfill, and for the support of structures and pavements.
FOUNDATION ENGINEERING EVALUATION AND RECOMMENDATIONS. 6.1 The Geotechnical Engineer shall analyze the information developed by investigation or otherwise available to the Geotechnical Engineer, including those aspects of the subsurface conditions which may affect design and construction of proposed structures, and shall consult with the Owner, Architect/Engineer on the design and engineering requirements of the Project. Based on such analysis and consultation, the Geotechnical engineer shall submit a professional evaluation and recommendations for the necessary areas of consideration, including, but not limited to, the items checked below: □ 6.1.1 Foundation support of the structure and slabs, including bearing pressures, bearing elevations, foundation design recommendations and anticipated settlement. □ 6.1.2 Anticipation of, and management of, groundwater for design of structures and pavements. □ 6.1.3 Lateral earth pressures for design of walls below grade, including backfill, compaction and subdrainage, and their requirements. □ 6.1.4 Soil material and compaction requirements for site fill, construction backfill, and for the support of structures and pavements. □ 6.1.5 Subgrade modulus for design of pavements or slabs. □ 6.1.6 Temporary excavation and temporary protection, such as excavation sheeting, underpinning and temporary dewatering systems.

Related to FOUNDATION ENGINEERING EVALUATION AND RECOMMENDATIONS

  • EVALUATION AND MONITORING The ORGANIZATION agrees to maintain books, records and other documents and evidence, and to use accounting procedures and practices that sufficiently and properly support the complete performance of and the full compliance with this Agreement. The ORGANIZATION will retain these supporting books, records, documents and other materials for at least three (3) calendar years following the year in which the Agreement expires. The COUNTY and/or the State Auditor and any of their representatives shall have full and complete access to these books, records and other documents and evidence retained by the ORGANIZATION respecting all matters covered in and under this Agreement, and shall have the right to examine such during normal business hours as often as the COUNTY and/or the State Auditor may deem necessary. Such representatives shall be permitted to audit, examine and make excerpts or transcripts from such records, and to make audits of all contracts, invoices, materials, and records of matters covered by this Agreement. These access and examination rights shall last for three calendar years following the year in which the Agreement expires. The COUNTY intends without guarantee for its agents to use reasonable security procedures and protections to assure that related records and documents provided by the ORGANIZATION are not erroneously disclosed to third parties. The COUNTY will, however, disclose or make this material available to those authorized by/in the above paragraph or permitted under the provisions of Chapter 42.56 RCW without notice to the ORGANIZATION. The ORGANIZATION shall cooperate with and freely participate in any other monitoring or evaluation activities pertinent to this Agreement that the COUNTY finds needing to be conducted.

  • Implementation and Review The Parties shall consult annually, or as otherwise agreed, to review the implementation of this Chapter and consider other matters of mutual interest affecting trade in services. (10) 10 Such consultations will be addressed under Article 170 (Free Trade Commission) of Chapter 14 (Administration of the Agreement).

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Evaluation, Testing, and Monitoring 1. The System Agency may review, test, evaluate and monitor Grantee’s Products and services, as well as associated documentation and technical support for compliance with the Accessibility Standards. Review, testing, evaluation and monitoring may be conducted before and after the award of a contract. Testing and monitoring may include user acceptance testing. Neither the review, testing (including acceptance testing), evaluation or monitoring of any Product or service, nor the absence of review, testing, evaluation or monitoring, will result in a waiver of the State’s right to contest the Grantee’s assertion of compliance with the Accessibility Standards. 2. Grantee agrees to cooperate fully and provide the System Agency and its representatives timely access to Products, records, and other items and information needed to conduct such review, evaluation, testing, and monitoring.

  • Project Monitoring Reporting and Evaluation The Recipient shall furnish to the Association each Project Report not later than forty-five (45) days after the end of each calendar semester, covering the calendar semester.