The Foundation Work clause defines the responsibilities and requirements related to the construction or preparation of a building's foundation. It typically outlines the scope of work, materials to be used, standards to be met, and any inspections or approvals required before proceeding with further construction. For example, it may specify that the contractor must excavate to a certain depth, use specified concrete mixes, and obtain engineer approval before pouring. This clause ensures that the foundational elements of a project are completed correctly and safely, thereby reducing the risk of structural issues and disputes later in the construction process.
Foundation Work. All footing and foundation work shall consist of poured-in-place reinforced concrete with a minimum 28-day strength of 3,000 psi and poured with a maximum slump of 4''. All footings must rest on undisturbed virgin soil or on engineered structural fill, and be a minimum of 2'-6'' below finished grades.
Foundation Work. The goal of this task is to build the required foundation for the infrastructure and related equipment as required in the approved stamped engineering drawings. • Design to validate materials. • Order materials. • Pour concrete. • Provide photographs to the CAM of foundation work in progress. • Finish concrete and related foundation work to prepare for construction. • Provie photographs to the CAM of foundation work completed. • Obtain contractor and city inspection sign-off of foundation. • Provide a copy of the signed statement from the contractor attesting to the satisfactory completion of the foundation to the CAM. • Provide a copy of the city inspector’s report to the CAM. • Photographs of foundation work in progress • Photographs of foundation work completed • Signed statement from the contractor • City inspector’s report
Foundation Work. The DA currently does not allow BTC to commence foundation work until it has a guaranteed maximum price contract in place to construct the new segments of Pine and St. ▇▇▇▇ Streets and those portions of Bank and Cherry Streets that are immediately adjacent to the project (which are collectively defined as the public improvements), and until it has a bonded, guaranteed maximum price contract in place to construct all of the private improvements (which are defined as the entire project except for the public improvements). Due to the nature of the design and budgetary processes for the public improvements that were not fully projected by either party at the time that the DA was executed, BTC will not be in a position to sign a guaranteed maximum price contract to construct the new segments of Pine and St. ▇▇▇▇ Streets and those portions of Bank and Cherry Streets that are immediately adjacent to the project until spring of 2019. As written in the DA, this condition would delay the construction of the Private Improvement for many months with no benefit to either party. This was not the intent of the DA and we see no problems with amending the DA to correct this oversight in the original document and to allow the project to proceed. As a separate matter, BTC has also sought relief from the requirement to have a bonded, guaranteed maximum price contract in place to construct all of the private improvements before starting foundation work because it has not yet obtained full construction financing beyond the $56 million of equity financing that the project secured last fall. BTC has evidenced to us that the remaining equity capital is more than sufficient to complete work of this foundation scope. Further, as added conditions in this side letter, BTC has agreed to provide the City with evidence that it has a bonded, guaranteed maximum price contract in place to construct the foundation work so that the City can be assured that the work will be completed once begun, and has agreed that it will meet the original DA conditions before proceeding with construction beyond the completion of the foundation. By allowing BTC to perform foundation work at the developer’s expense, the project will continue to progress without potentially damaging delay and the site will be improved considerably, both of which forward the City’s interests. I welcome further discussion on this topic with the City Council in Monday.
Foundation Work. RCC PILE with allied foundation as per sanctioned drawings, M 25 grade of concrete for pile only other RCC work M 20 grade of concrete and steel. Fe 500 grade

Related to Foundation Work

  • Tenant Improvements Tenants construction of the Tenant Improvements in the Suite 120 Premises shall be subject to the terms of the Work Letter attached to the Lease as Exhibit C, except that, notwithstanding anything to the contrary contained in the Work Letter: a. The Tenant Improvements in the Suite 120 Premises shall be constructed pursuant to the space plans attached to this First Amendment as Exhibit B (the “Suite 120 Space Plans”) and the tenant improvement specifications attached to this First Amendment as Exhibit C (the “Suite 120 TI Specifications”), which have been approved by both Landlord and Tenant, and the TI Construction Drawings for the Tenant Improvements for the Suite 120 Premises shall be prepared substantially in accordance with the Suite 120 Space Plans and the Suite 120 TI Specifications (and Landlord may not disapprove any matter in connection therewith that is consistent with the Suite 120 Space Plans and the Suite 120 TI Specifications). b. The Tenant Improvement Allowance and the Additional Tenant Improvement Allowance provided for in Section 6(b) of the Work Letter shall not apply with respect to the Suite 120 Premises and Landlord shall provide a tenant improvement allowance with respect to the Tenant Improvements in the Suite 120 Premises, as follows: (i) a “Suite 120 Tenant Improvement Allowance” in the maximum amount of $185.00 per rentable square foot in the Suite 120 Premises, which is included in the Base Rent set forth in the Lease; and (ii) an “Additional Suite 120 Tenant Improvement Allowance” in the maximum amount of $40.00 per rentable square foot in the Suite 120 Premises, which shall, to the extent used, result in Suite 120 TI Rent as set forth in Section 5(c) below. For the avoidance of doubt, (A) the definition of “TI Allowance” in the Work Letter shall include the Tenant Improvement Allowance, the Additional Tenant Improvement Allowance, the Suite 120 Tenant Improvement Allowance and the Additional Suite 120 Tenant Improvement Allowance, as applicable, and (B) in connection with the Tenant Improvements in the Suite 120 Premises, Landlord shall be entitled to Administrative Rent equal to 1.5% of the “hard” TI Costs incurred in connection with such Tenant Improvements and a fee shall be payable to Tenant’s third party project manager, ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇ of ▇▇▇▇▇ ▇▇▇▇ LaSalle, not to exceed 1.5% of the “hard” TI Costs of such Tenant Improvements, which amounts shall be payable out of the TI Fund. Landlord and Tenant acknowledge and agree that the Suite 120 Tenant Improvement Allowance and the Additional Suite 120 Tenant Improvement Allowance, to the extent utilized, must be used toward the cost of Tenant Improvements in the Suite 120 Premises. c. Pursuant to the terms of the Work Letter (as amended by this First Amendment), Landlord shall, subject to the terms of the Work Letter (as amended by this First Amendment), make available to Tenant the Suite 120 Tenant Improvement Allowance and the Additional Suite 120 Tenant Improvement Allowance. Commencing on the Rent Commencement Date and continuing thereafter on the first day of each month during the Base Term, Tenant shall pay the amount necessary to fully amortize the portion of the Additional Suite 120 Tenant Improvement Allowance actually funded by Landlord, if any, in equal monthly payments with interest at a rate of 7% per annum over the Base Term, which interest shall begin to accrue on the date that Landlord first disburses such Additional Suite 120 Tenant Improvement Allowance or any portion(s) thereof (“Suite 120 TI Rent”). Any outstanding and unamortized Suite 120 TI Rent remaining unpaid as of the expiration or earlier termination of the Lease shall be paid to Landlord in a lump sum at the expiration or earlier termination of this Lease. For the avoidance of doubt, Landlord and Tenant acknowledge and agree that Suite 120 TI Rent, if any, shall not be subject to adjustment pursuant to Section 4(a) of the Lease during the Term.

  • Demolition work (i) As of 1 March 2024 where Employees are directly performing demolition works that would require a demolition permit that allows the performance of such work, they will receive the amount of $9.70 per hour or the site allowance, whichever is the greater. This allowance will be adjusted annually in accordance with CPI (All Groups, Melbourne) movements measured in the twelve month period ending the previous December quarter effective as of 1 March 2025, rounded to the nearest 5 cents. (ii) As of 1 March 2024 where Employees are employed in connection with, and on work, with employees of demolition contractors (ie. working within the demolition zone and/or subject to the additional disabilities arising from that demolition), they will receive the amount of $8.70 per hour or the site allowance, whichever is the greater. This allowance will be adjusted annually in accordance with CPI (All Groups, Melbourne) movements measured in the twelve month period ending the previous December quarter effective as of 1 March 2025, rounded to the nearest 5 cents.

  • Initial Improvements (a) The final space plan (the “Space Plan”) for the Premises, mutually approved by the Parties is attached as Appendix 1. (b) Landlord shall cause the Base Building Improvements (the “Base Building Improvements”) described on Appendix 2 to be completed in accordance with the plans and specifications (the “Building Plans”) prepared by Landlord, the Building Standards and Specifications (the “Building Standards”) attached as Appendix 3 and Laws. The Base Building Improvements shall be made, and the Building Plans shall be prepared, at Landlord’s sole cost and expense, except that any changes, alterations, modifications or upgrades to: (i) the Base Building Improvements or the Building Plans requested by Tenant and approved by Landlord; or (ii) the Tenant Improvements or the Tenant Improvement Plans (both defined below) that result in changes, alterations, modifications or upgrades to the Base Building Improvements or the Building Plans, shall be made at Tenant’s sole cost and expense. (c) Landlord shall also cause the Tenant Improvements (the “Tenant Improvements”) described on Appendix 2 to be completed in accordance with the Space Plan, the plans and specifications (including the tenant finishes) (the “Tenant Improvement Plans”) approved by the Parties, the Building Standards and Laws. Subject to the last sentence of this subparagraph (c), the Tenant Improvements shall be made, and the Tenant Improvement Plans shall be prepared, at Landlord’s cost and expense, except to the extent that, at Tenant’s direction, the Tenant Improvements vary from the Space Plan or the Building Standards. To the extent that, at Tenant’s direction, the Tenant Improvements vary from the Space Plan or the Building Standards, such variance shall be made at Tenant’s sole cost and expense. Notwithstanding the foregoing to the contrary, Tenant shall pay to Landlord all costs incurred or payable by Landlord in making the Balconies accessible and usable by Tenant within ten (10) business days after the receipt of an invoice therefor, accompanied by such detail as may reasonably be requested by Tenant, which invoice may be delivered prior to the commencement of construction. (The Base Building Improvements and the Tenant Improvements are referred to in this Exhibit collectively as the “Initial Improvements.”) The Initial Improvements shall be completed free of any mechanics’ liens, except to the extent of any dispute in connection therewith, in which case Landlord shall adequately protect the Property from the foreclosure of any such lien. (d) Landlord shall cause the Tenant Improvement Plans to be prepared by a registered professional architect and mechanical and electrical engineer(s). Landlord shall furnish the initial draft of the Tenant Improvement Plans to Tenant for Tenant’s review and approval. Tenant shall within three (3) business days after receipt either provide comments to such Tenant Improvement Plans or approve the same. Tenant shall be deemed to have approved such Tenant Improvement Plans if Tenant does not timely provide comments on such Tenant Improvement Plans. If Tenant provides Landlord with comments to the initial draft of the Tenant Improvement Plans, Landlord shall provide revised Tenant Improvement Plans to Tenant incorporating Tenant’s comments within three (3) business days after receipt of Tenant’s comments. Tenant shall within three (3) business days after receipt then either provide comments to such revised Tenant Improvement Plans or approve such Tenant Improvement Plans. Tenant shall be deemed to have approved such revised Tenant Improvement Plans if Tenant does not timely provide comments on such Tenant Improvement Plans. The process described above shall be repeated, if necessary, until the Tenant Improvement Plans have finally been approved by Tenant. (e) Landlord shall provide project management services in connection with the construction of the Initial Improvements and the Change Orders (defined below). Such project management services shall be performed without cost to Tenant, except for Change Orders, which shall be performed for a fee of five percent (5%) of all costs related to the construction of the Change Orders. Tenant may, at Tenant’s discretion and sole cost and expense, engage a representative to oversee construction activities on Tenant’s behalf. Said representative shall coordinate its efforts with Landlord’s project manager and/or contractor, shall have full access to all information and documentation with respect to the Tenant Improvements and may be engaged throughout the design and construction process of the Tenant Improvements.

  • Construction Work The regulation at 41 C.F.R. § 60-1.3 defines “construction work” as the construction, rehabilitation, alteration, conversion, extension, demolition or repair of buildings, highways, or other changes or improvements to real property, including facilities providing utility services. The term also includes the supervision, inspection, and other onsite functions incidental to the actual construction.

  • Landlord Work Prior to the execution of this First Amendment, Landlord and Tenant have approved (i) a detailed space plan for the construction of Landlord’s Work in the Premises, which space plan has been prepared by Studio O + A (“Final Approved Plan”) and (ii) a bid proposal for the construction of Landlord’s Work in the Premises, which bid proposal has been prepared by ▇▇ ▇▇▇▇ Construction and is dated June 2, 2011 (Rev-2) (“Bid Proposal”). The Final Approved Plan and Bid Proposal are approved by the parties as of the Effective Date, are attached hereto collectively, as Exhibit “D-1” and hereby replaces the original Approved Plan attached to the Lease as Exhibit “D-1”. Consequently, all references in the Work Letter to the “Approved Plan” shall mean and refer to the Final Approved Plan and Bid Proposal attached hereto as Exhibit “D-1”. Landlord agrees to construct the Landlord Work, pursuant to the terms and conditions set forth in the Work Letter and as depicted on the Approved Plan (as amended hereby). Landlord shall pay for the cost (including, the cost of obtaining all applicable building permits) of the design and construction of Landlord’s Work in an amount up to, but not exceeding, Two Hundred Twenty Two Thousand One Hundred Fifty and 00/100 Dollars ($222,150.00) plus any additional costs actually incurred by Landlord in excess of such $222,150.00 amount as a direct result of Landlord’s or Landlord’s contractor’s active negligence or willful misconduct or resulting from change order to the Approved Plans (as amended hereby) if such change order is initiated and executed by Landlord (the “Landlord’s Contribution”). Tenant shall pay for all costs in excess of the Landlord’s Contribution (“Over Allowance Amount”) which payment shall be made to Landlord in cash within thirty (30) days after Tenant’s receipt of invoice therefor from Landlord. Payment of the Over-Allowance Amount shall be in addition to Tenant’s obligation to pay to Landlord the cost of any Aggregate Extras as provided in Section 4 of the Work Letter.