POPULAR SAMPLE Copied 5 times
Foundations nor shall the Contractor be responsible for correction of leaks resulting from said failure.
Foundations. Below-grade repair of brick or stone foundations that does not include applying weatherproofing or sealers, and repairs to all other types of foundations.
Foundations. Special attention is given to the foundation for the main power transformer. The transformer foundation design includes an oil containment system with a water drainage system. In this area, an oil containment system sized to hold 110% of the transformer contents is provided.
Foundations. Brickwork of NFX bricks (14 MPa nominal compressive strength) in class I mortar 1 One brick walls m² 10 2 One brick walls in pit m² 19 3 4Half brick corbelling in pit m 8 Face bricks (purchase price of R 4000.00/1000 delivered to site excluding VAT) pointed with flush horizontal and vertical joints 4 Extra over brickwork for face brickwork in foundation m² 4 Face bricks (purchase price of R 4000.00/1000 delivered to site excluding VAT) pointed with flush horizontal and vertical joints 5 Half brickwork for face brick walls pointed both sides m² 32 6 One brickwork for face brick walls pointed both sides m² 68 7 Extra over brickwork for face brickwork in beamfilling m² 5 8 Fair raking and cutting m 11
Foundations. The Developer will complete foundation work during Phase I as described above.
Foundations nor shall the Design-Builder be responsible for correction of leaks resulting from said failure.
Foundations nor shall the CM/GC be responsible for correction of leaks resulting from said failure.
Foundations. Include type (concrete or metallic).
Foundations. 1.1 Concrete foundations as per engineer’s detail.
Foundations. Miscellaneous equipment foundations for the bus work, disconnect switch and CT/PT units were designed in accordance with generally accepted practices of soil mechanics and the design criteria for the ▇▇▇▇▇▇▇ Station.