Food and Beverage All food and beverages (alcoholic and non alcoholic) which are located at the Hotel (whether opened or unopened), or ordered for future use at the Hotel as of the Closing, including, without limitation, all food and beverages located in the guest rooms, but expressly excluding any alcoholic beverages to the extent the sale or transfer of the same is not permitted under Applicable Law (the “F&B”);
Alcoholic Beverages Costs of alcoholic beverages are unallowable.
Food and Beverages Due to licensing requirements and quality control issues, all food and beverage to be serviced on the Hotel property must be supplied and prepared by the Hotel. The Hotel has the right to cease service of alcoholic beverages in the Event that persons under the state mandated age limit are present at the Event and attempt to receive service of alcoholic beverages. Hotel further reserves the right to deny alcoholic beverage service to guests who appear to be intoxicated.
Synchronization, Commissioning and Commercial Operation 5.1.1 The SPG shall give PGVCL at least thirty (30) days’ advanced preliminary written notice and at least fifteen (15) days’ advanced final written notice, of the date on which it intends to synchronize the Solar Power Project to the Grid System. 5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the SPG to the Grid System when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the SPG at its generation facility of the Power Project at its own cost. The SPG shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/ and checking/verification is made by the concerned authorities of the PGVCL. 5.1.4 The SPG shall immediately after each synchronization/tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. In addition, the SPG will inject in-firm power to grid from time to time to carry out operational/ functional test prior to commercial operation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project. 5.1.5 The SPG shall commission the Project within nine (9) Months from the Date of execution of this PPA. Declaration of COD shall be certified by the commissioning committee. 5.1.6 The Parties agree that for the purpose of commencement of the supply of electricity by SPG to PGVCL, liquidated damages for delay etc., the Scheduled Commissioning Date as defined in this Agreement shall be the relevant date.
As-Builts Seller shall provide final as-built drawings of the Seller-Owned Interconnection Facilities within 30 Days of the successful completion of the Acceptance Test.